Loading...
HomeMy WebLinkAboutMINUTES - 09262006 - C.1 TO: BOARD OF SUPERVISORS :`"� �: Contra -=- FROM: MAURICE M. SHN, PUBLIC WORKS DIRECTOR ;:-•ti. Costa DATE: September 26, 2006 - �`'� (ls7'9•C'OUh��` � COuntJ SUBJECT: Reimbursement of funds for Road Acceptance 04-01157 (cross-reference Subdivision 99-08306) for improvements completed on the Dougherty Road Bridge by Shapell Industries of Northern California, San Ramon (Dougherty Valley) area. District (III) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)Sc BACKGROUND AND JUSTIFICATION RECOMMENDATION(S): Authorize the Public Works Director, or designee, to reimburse Shapell Industries of Northern California the amount of$664,928.63 with funds from the Dougherty Road Maintenance Fee (Fund 8192) for work completed i for the Road Acceptance 04-01157 Dougherty Road Bridge. FISCAL IMPACT: There is no impact to the General Fund. The County has not funded any of the improvements related to this action. The improvements were conditioned of the developer and completed by the developer with oversight by the County. Upon approval by the Board of Supervisors, the amount of$664,928.63 will be reimbursed from the Dougherty Road Maintenance Fee. Continued on Attacl>tment:_� SIGNATURE:_ ✓ _✓_WECOiNIMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE ;"APPROVE OTHER SIGNATURES : -' ' ACTION OF BO ON ,G APPROVED AS RECOMMENDED OTHER V�IE OF SUPERVISORS „/� I hereby certify that this is a true and correct UNANIMOUS(ABSENT 1VW6— ) copy of an action taken and entered on the AYES: NOES: minutes of the Board of Supervisors on the ABSENT: ABSTAIN: date shown. TR:,z G:\EngSvc\EO\1006\09-16\RA 04-1157 Order.doc Orifi.Div: Public Works(ES) ATTESTE .!i bG�04'0/ Olia"V�i Contact: C Ra nolds.Ac JOHN CULLS Clerk of the Board of cc: C.Raynolds,Accounting , W.L.ai,77ansportation Engineering Shapell Industries of Northern California Supervisors and County Administrator 100 N.Milpitas Blvd. Milpitas,CA 95035 Attn:Sam Worden By a--, Deputy SUBJECT: Reimbursement of funds for Road Acceptance 04-01157 (cross-reference Subdivision 99-08306) for improvements completed on the Dougherty Road Bridge by Shapell Industries of Northern California, San Ramon(Dougherty Valley) area. District (III) DATE: September 26, 2006 PAGE: 2 BACKGROUND/R.EASON(S) FOR RECOMMENDATION(S): The Dougherty Road Bridge was constructed by Shapell Industries of Northern California under Subdivision 99- 08306 as a condition of approval. The Board of Supervisors accepted these improvements as complete on December 13, 2005. Condition of Approval #174 of Subdivision 99-08306 states that these improvements are eligible for reimbursement from the Dougherty Road Maintenance fee. Engineering Services staff has reviewed the costs in accordance with the conditions of approval and have determined the costs to be accurate. Upon approval by the Board of Supervisors, the amount of$664,928.63 will be reimbursed from the Dougherty Road Maintenance Fee. CONSEQUENCES OF NEGATIVE ACTION: If the action is not approved, Shapell Industries of Northern California will not be reimbursed. WRITE IT - DON'T SAY IT DATE: May 31, 2006 TO: Carol Raynolds, Accounting Division FROM: Larry Theis, Engineering Services Di SUBJECT: Authorization of Reimbursement for RA 1157 - Dougherty Road Bridge Engineering Services is authorizing Accounting to reimburse Shapell Homes for the County's share of the Dougherty Road Bridge project located within Dougherty Valley (in San Ramon area), District III. Engineering Services has prepared the attached cost breakdown spreadsheet and have reviewed the accompanying binder which contains consultant/contractor invoices and cancelled checks for the Dougherty Road Bridge project. The submitted invoices and cancelled checks are acceptable and within the scope of the ' project. We request Accounting to verify the cost breakdown and supporting documentation. The County's share of $664,928.63 has been calculated based on pre-determined percentages: 28% for bridge related work, 80% for road related work, and 47% for County review/inspection work. These percentages represent the additional cost to Shapell Homes beyond the project requirements for Alternative 1 specified in #174 of the attached conditions of approval which the County is financially responsible. Shapell Homes shall be reimbursed for the County's share of the project from the Dougherty Valley Road Improvement Fee Trust (Fund No. 8192). The reimbursement payment should be made out to "Shapell Homes" at the following address: 100 North Milpitas Blvd., Milpitas, CA 95035, Attn: Sam Worden. Please notify and copy Teri Rie, Engineering Services upon the issuance of the reimbursement check and return the attached binder for our files. If you have any questions or need some clarification, please contact me at 313-2166. Attachments: Cost Breakdown Spreadsheet Binder containing:Invoices and Cancelled Checks Excerpt of SD 99-8306 Conditions of Approval,#174 Cc: Teri Rie,Engineering Services, Z:\GrpData\EngSvc\Larry T\Memos\WIDSI RA 1157 Dougherty Bridge Reimbursement.doc Dougherty Road Bridge Cost Sharing Spreadsheet-Revised 2/1612005 Consultant/ County's Contractor Description Detail Amount Responsibility Amount Due ENGEO CO#2(T&O Contract) Special Inspection $35,300.00 28% $9,884.00 CO#17 (Design Contract) Exploration, Report $9,600.00 28% $2,688.00 CO#21 (Design Contract) Exploration, Corrosion Rec. $18,100.00 28% $5,068.00 $63,000.00 $17,640.00 RJA PO N-14840 Stake E.P. $1,561.00 80% $1,248.80 PO N-14867 Locate E.P. $1,252.00 80% $1,001.60 PO N-14886 Curve Safety Improvements $4,992.00 80% $3,993.60 PO N-15064 Additional Curve engineering $2,358.00 80% $1,886.40 Contract Design/Stake $63,293.00 80% $50,634.40 CO#1 Field Verification $12,500.00 80% $10,000.00 $85,956.00 $68,764.80 Cornerstone PO N-14760 Additional Inspection $12,000.00 28% $3,360.00 Contract, CO#1-4 Design/Inspection/Accelerate $126,855.57 28% $35,519.56 $138,855.57 $38,879.56 CCC-PWD Invoice#19216 Review/Inspection $109,227.27 47% $51,336.82 Chrisp Company PO N715086 Signing&Striping $37,815.00 80% $30,252.00 OC Jones Contract Street Work $87,316.00 80% .$69,852.80 CO#1 Misc. Overlay Work $95,669.24 80% $76,535.39 CO#2 Misc.Overlay Work $110,767.95 80% $88,614.36 $293,753.19 $235,002.55 Independent Structural Backfill of Construction PO N-15817 Abutments $147,051.76 28% $41,174.49 Jones Brothers PO N-15193 AC Grinding/Profilograph $1,293.75 28% $362.25 Contract Bridge Construction $634,023.00 28% $177,526.44 CO#1 County Requirements $14,249.00 28% $3,989.72 $649,565.75 $181,878.41 GRAND TOTALS: $1,525,224.54 $664,928.63 Total Cost County's Share Public Works Engineering Services CONTRA COSTA COUNTY COMAIUNIT1' DEVELOPMENT DEPARTMENT APPROVED PERMIT APPLICANT: Shapell Industries APPLICATION NO. SD998306 100 N. Milpitas DP993006 Milpitas, Ca 95035 ASSESSOR'S PARCEL NO. 206-240-003 206-250-008, 009 206-120-001, 206-080-001 ZONING DISTRICT: P-1 OWNER: Same APPROVED DATE: 10/28/2003 EFFECTIVE DATE: 11/10/2003 This matter not hsving been appealed within the time prescribed by law, APPROVAL OF A FINAL DEVELOP14ii.. LAN AND VESTING TENTATIVE MAP TO SUBDIVIDE A 554 ACRE PARCEI. INTO 1,045 LOTS TO ESTABLISH 1,042 SINGLE-FAMILY HOMES, A CONDOMINIUM COMPLEX,AN APARTMENT COMPLEX,AN ELEMENTARY SCHOOL, PARKS AND OPEN SPACE in the SAN RAMON area is hereby GRANTED, subject to the attached conditions. L . DENNIS M. BARRY, AICP Community Development Direct PLEASE NOTE THE EFFECTIVE DATE, as no further notification will be sent by this office. r 40 mile per hour design speed, subject to the review and approval of the Public Works Department. 173. Once the connection from Stoneleaf Road to existing Dougherty Road is made and until such time as at least two lanes of future Dougherty through Gale 4 are built, construction of Stoneleaf roundabout and the approximately 143-homes that front on Stoneleaf Road shall be delayed until a review by the Public Works Department demonstrates that roundabout and home construction will not adversely affect through traffic on existing Dougherty Road. 174. Prior to filing the first final map with residential lots, the applicant shall construct a new EVA road/sewer maintenance/flood control access road/trail bridge (EVA road/trail bridge) across Main Branch Alamo Creek for the future trail aliunment/EVA access road along ` ;, A existing Dougherty Road, with a minimum of 2-feet of freeboard above the 100-year water surface. The bridge shall.be designed to accommodate H2O truck loading. The minimum . cic;1; %, idth of the bridge shall be the paved width of the approach EVA road/trail. The transitions from the bridge to the EVA road/trail shall meet the requirements of the San Ramon Valley Fire District and have a minimum design speed of 20-miles per hour (mph), subject to the review and approval of Engineering Services. If, prior to filing the first final map and prior to the start of design for the EVA road/trail bridge, the County formally requests the applicant to remove the existing Dougherty Road ` bridge and construct a new bridge to accommodate 2-lanes of traffic, in lieu of the EVA road/trail bridge described above, the applicant shall design and construct a bridge structure of a width specified by Public Works with a minimum of 2-feet of freeboard above the 100- year water surface and provide for H2O truck loading. The applicant shall submit for review and approval of the Public Works Department two conceptual plans-and two construction cost estimates for the following two alternatives: Alternative 1) for the bridge structure contemplated in the first paragraph (i.e. an EVA road/trail bridge with transitions to the existing road for a design speed of 20-mph; and Alternative 2) for the 2-lane bridge structure, with transitions to the existing road. If the new 2-lane bridge is fonnally requested by the County prior to issuance of the grading permit, the applicant shall demonstrate to the Public Works Department that they are diligently working to coordinate the construction the 2-lane bridge to occur with the temporary Dougherty Road closure allowed with the Stoneleaf/Gale 3 grading. The applicant is financially responsible for all costs of alternative one. The applicant shall be reimbursed for the additional construction costs (costs above and beyond the costs of alternative one) of providing the wider bridge and the transitions from the Dougherty Valley Road improvement Fee Trust (Fund No. 8192) to the extent that funds are available. If the additional construction costs for alternative two exceeds the amount of funds available in the Dougherty Valley Road Improvement Fee trust (Fund No. 8192), the applicant shall provide sufficient funds necessary to complete the construction of the bridge and roadway, which amount will be credited against future Dougherty Road Improvement Fees (Fund no. 8192). The applicant and the Public Works Department shall work together Q-1 2 9 on alternative designs to minimize costs. The applicant shall submit original copies of invoices, receipts, and construction contracts to Engineering Services for reimbursement. 175. Prior to issuance of the 500`h Gale 3 building permit (exclusive of building permits for any apartment units), the applicant shall submit a bonding exhibit to the Public Works Department for a four lane section of Dougherty Road between the northern and southern intersections with Bollinger Canyon Road. Prior to the 700`h Gale 3 building permit (exclusive of building permits for any apartment units), the applicant shall post a bond for the improvement of a four lane section of Dougherty Road between the northern and southern intersections with Bollinger Canyon Road. EIR Mitigation Measures 176. This project shall comply with the mitigation measures set forth in the project environmental impact report. Conformance with the EIR includes the following: A. Contribute this development's fair share toward the cost of improving the intersection of Dublin Road with Dougherty Road as follows: 1) Northbound approach: provide two exclusive left-tum lanes, one shared through-left lane, two exclusive through lanes, and one exclusive right-turn lane. 2) Southbound approach: widen Dougherty Road to provide one left-turn lane, three through lanes, and one right-turn only lane. 3) Eastbound approach: Widen Dublin Road to include one left-turn lane, two through lanes, and two right-turn only lanes. 4) Westbound approach: Widen Dublin Road to include two left-turn lanes, two through lanes and one right-turn only lane. Compliance with this measure shall be satisfied by paying the Dublin-Contra Costa Mitigation Fee (DCC Fee). The DCC Fee will be collected at building permit. (EIR Mitigation Measure 4.6-2) B. The applicant shall ensure that approximately 80 percent of the housing in the development shall be located within one quarter mile of a designated transit route, consistent with Dougherty Valley Specific Plan Policy C-5 and the collector road system in Figure 8 of the Specific Plan. 30