Loading...
HomeMy WebLinkAboutMINUTES - 11061984 - X.5 X. s THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on November 6, 1984 by the following vote: AYES: Supervisors Fanden, Schroder, McPeak and Torlakson NOES: None ABSENT: Supervisor Powers ABSTAIN: None SUBJECT: In the Matter of Awardof Contractor Ygnacio Val ley KoNd Slide Repair, Project No. 0671-6R6714-83, Federal Project No. ER-1116(5) , Walnut Creek-Concord Area. Bidder Total Amount Bond Amounts Heide and Williams, Inc. $3689343.00 Payment $184,171.50 P. 0. Box 2007 Faith. Perf. $3689343.00 Napa, California 94558 Kiewit Pacific Co. Fanfa-Mulloy, Inc. Gabe Mendez, Inc. Ferma Corporation Joe Foster Excavating C & G Contractors Independent Construction Crystal Creek Huntington Bros. , Inc. Oliver de Silva Bay Cities Paving and Grading MJM Engineering The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Public Works Director; and The bidder listed first above submitted with his bid DB and WBE information stating that the required goals would be met. A review of this information by the Public Works Department indicated that an additional submittal of information was required from the contractor adding to his WBE goal . This additional information was submitted and approved following the procedure set forth in the contract specifications; and The Public Works Director recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Public Works Department shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and 'round Lhem Lu be 5ui i iLieilt, Lha rubl 1s Works Director is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specifi- cations and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. 000243 Orig.Dept.: Public Works Department, Design/Const. Div. cc: County AdministratorIhere!!ycertify S11Mthis[!atrue and correct COPY of County Auditor-Controller an action taken and entered on the minutes of the Public Works Director Board of Supervisors on the date shown. Design and Construction Division ATTESTED: NOV 6 1984 Accounting Division PHIL BATCHELOR,Clerk of the Board Contractor of Supervisors and County Administrator DC:YGNACIOBO.T11 By � � , Deputy