Loading...
HomeMy WebLinkAboutMINUTES - 09122006 - C.122 Fe [ TO: BOARD OF SUPERVISORS Contra ;%;=` \`. . a. Costa FROM: John Cullen, County Administrator ; ` - ::__, by: John Gregory, Deputy County Administrator County S�q ��o�� DATE: September 12, 2006C, O� SUBJECT: ACCEPT recommendations regarding the North Richmond Waste and Recovery Mitigation Fee 2006/2007 Expenditure Plan SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS 1. APPROVE the two-year North Richmond Waste and Recovery Mitigation Fee 2006/2007 Expenditure Plan for specified projects and programs. 2. AUTHORIZE the County Administrator or his designee to implement the Plan in coordination with the Richmond City Manager's Office, including execution of appropriate agreements and documents to facilitate funding transfers necessary to provide services and programs identified in the North Richmond Waste and Recovery Mitigation Fee 2006/2007 Expenditure Plan. FISCAL IMPACT No impact to the County General Fund. The North Richmond Waste and Recovery Mitigation Fee Expenditure Plan (see Exhibit A) is based on projected revenue from mitigation fee charged on material and waste processed at the Bulk Material Processing Center (BMPC) located at the West Contra Costa Sanitary Landfill (WCCSL). A Memorandum of Understanding (MOU) (see Exhibit B) between Contra Costa County and the City of Richmond requires that the mitigation fee revenue collected from the Operator (WCCSL, Inc.) be paid to the County, held in a dedicated separate account and jointly administered for the benefit of the incorporated and unincorporated North Richmond Map area (see Exhibit C). The WCCSL operator has projected that a total of $1,519,732 in mitigation fee revenue will be generated in calendar years 2006 and 2007. CONTINUED ON ATTACHMENT: X YES SIG NATURZvrl,,,,i RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOAR ITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON Oa( /17-/ OC.o APPROVED AS RECOMMENDED OTHER _ VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE �G UNANIMOUS (ABSENT ` AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. j Contact: John'Gregory, CAO (925-335-1089) ATTESTED C) ha cc: County Administrator JOH CULLEN, CLERK OF THE Attn: John Gregory, Rebecca Moody BOARD OF SUPERVISORS AND Community Development Department (CDD) COUNTY ADMINISTRATOR Attn: Deidra Dingman •� County Counsel, Attn: Lillian Fujii B , DEPUTY City of Richmond, Attn: Janet Schneider North Richmond MAC Members WCCIVI/MA, Attn: Steve Devine ACCEPT recommendations regarding the North Richmond Waste and Recovery Mitigation Fee 2006/2007 Expenditure Plan September 12, 2006 Page 2 BACKGROUND/REASONS FOR RECOMMENDATIONS The Waste & Recovery Mitigation Fee was established as a result of the Draft Environmental Impact Report (EIR) dated November 2003 for the WCCSL Bulk Materials Processing Center (BMPC) and Related Actions (Project). The Project involved new and expanded processing and resource recovery operations on both the incorporated and unincorporated area of the Project site, which the EIR concluded would impact the host community. To mitigate this impact Mitigation Measure 4-5 called for a Mitigation Fee to benefit the host community, described as follows: "Mitigation Fee. The facility operator shall pay a Mitigation Fee of an amount to be determined by the applicable permitting authority(ies) to defray annual costs associated with collection and disposal of illegally dumped waste and associated impacts in North Richmond and adjacent areas. The mitigation fee should be subject to the joint-control of the City and County and should be collected on all solid waste and processible materials received at the facility consistent with the existing mitigation fee collected at the Central IRRF." In July 2004, the City of Richmond and Contra Costa County entered into a Memorandum of Understanding (MOU) agreeing.to jointly administer Mitigation Fee monies collected from the BMPC for the benefit of the incorporated and unincorporated North Richmond area (Exhibit C). The MOU requires that the mitigation fee revenue collected from the Operator (WCCSL, Inc.) be paid to the County and held in a dedicated separate. The North Richmond Mitigation Fee Committee was formed pursuant to the terms of the MOU for the specific purpose of preparing a recommended two year Expenditure Plan. The Committee consists of three Richmond City Council persons, three North Richmond Municipal Advisory Council members and County Supervisor John Gioia. This Expenditure Plan provides a means to jointly administer the Mitigation Fee funding for the benefit of the host community, as described in the EIR. The North Richmond Waste and Recovery Mitigation Fee Committee approved the 2006/2007 Expenditure Plan with amendments on July 28, 2006 (Exhibit A includes Committee's recommended amendments). The Expenditure Plan is subject to final approval of the Richmond City Council and the Contra Costa County Board of Supervisors. The.Richmond City Council is scheduled to consider approval of this Expenditure Plan at their meeting on September 12, 2006. According to the MOU, in the event that a two year Expenditure Plan is not adopted by the Richmond City Council and the Contra Costa County Board of Supervisors, the Mitigation Fee monies shall be divided equally between the City of Richmond and Contra Costa County and shall be spent to lessen the impacts of the facility on the host community. If approved, this Expenditure Plan authorizes staff to make adjustments for certain line items, if needed, to account for budget shortfalls or overages, being mindful of the Committee's direction to maintain the funding split over the two-year Expenditure Plan outlined below: Expenditure Category Funding Split Prevention & Education 20% Abatement & Enforcement 60% Community Investment 20% The flexibility to make some adjustments is important because the Expenditure Plan Budget was developed based on revenue estimates with multiple variables (e.g. number of tons of recovered materials vs. solid waste, per ton gate rate charged and amount of CPI-adjusted per ton Mitigation Fee). Revenue projections may deviate from those provided by the WCCSL operator and used to prepare the Expenditure Plan Budget. It is likely that some adjustments will be necessary to accommodate variations between estimated and actual revenue as well as disparity between estimated and ACCEPT recommendations regarding the North Richmond Waste and Recovery Mitigation Fee 2006/2007 Expenditure Plan . September 12, 2006 Page 3 actual costs for non-fixed cost strategies. This Expenditure Plan has been designed to maximize efficiency in the administration of the Plan. The Budget includes some line items that are based on fixed costs, however to provide flexibility other line items can be adjusted if needed. The attached Expenditure Plan Budget Table identifies whether the expenditure amount for each strategy is fixed, based on per unit cost or designed to fit within budget. This flexibility will allow the City and County to avoid the delays and costs associated with amending the Expenditure Plan. Amendments would only be proposed by Staff if absolutely necessary due to problems adjusting expenditures within each Category consistent with the Committee's direction. Amending the Expenditure Plan will require Staff to convene this Committee as well as seek the approval of the City Council and Board of Supervisors. i� i I; Exhibit A 2006/2007 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan INTRODUCTION The Waste & Recovery Mitigation Fee was established as a result of the Draft Environmental Impact Report (EIR) dated November 2003 for the WCCSL Bulk Materials Processing Center (BMPC) and Related Actions (Project). The Project involved new and expanded processing and resource recovery operations on both the incorporated and unincorporated area of the Project site, which the EIR concluded would impact the host community. To mitigate this impact Mitigation Measure 4-5 called for a Mitigation Fee to benefit the host community, described as follows: "Mitigation Fee. The facility operator shall pay a Mitigation Fee of an amount to be determined by the applicable permitting authority(ies) to defray annual costs associated with collection and disposal of illegally dumped waste and associated impacts in North Richmond and adjacent areas. The mitigation fee should be subject to the joint-control of the City and County and should be collected on all solid waste and processible materials received at the facility consistent with the existing mitigation fee collected at the Central IRRF." In July 2004, the City of Richmond and Contra Oosta County entered into a Memorandum of Understanding (MOU) agreeing to jointly administer Mitigation Fee monies collected from the BMPC for the benefit of the incorporated and unincorporated North Richmond area. This Committee was formed pursuant to the terms of the MOU for the specific purpose of preparing a recommended two year Expendit lure Plan. This Expenditure Plan provides a means to jointly administer the Mitigation Fee funding for the benefit of the host community, as described in the EIR. The Expenditure Plan is subject to final approval of the Richmond City Council and the Contra Costa County Board of Supervisors. BUDGET The attached Budget Table is incorporated herein by reference. The Budget was developed based on revenue estimates with multiple variables (e.g. number of tons of recovered materials vs. solid waste, per ton gate rate charged and amount of CPI- adjusted per ton Mitigation Fee). Revenue projections may deviate from those provided by Republic and used to prepare the attached Budget Table. Revised:7/20/2006 2006/2007 North Richmond Waste& Recovery Mitigation Fee Expenditure Plan It is likely that some adjustments will be necessary to accommodate variations between estimated and actual revenue as well as disparity between estimated and actual costs for non-fixed cost strategies. Adjustments may be needed due to under-utilization of a particular program if estimated expenditure was based on per unit cost.. If the number of units allocated to a particular line item are not exhausted, the remaining funding would need to be redistributed within that expenditure category. This Expenditure Plan has been designed to maximize efficiency in the administration of the Plan. The Budget includes some line items that are based on fixed costs, however to provide flexibility other line items can be adjusted if needed. The attached Budget Table identifies whether the expenditure amount.for each strategy is fixed, based on per unit cost or designed to fit within budget. If approved, this Expenditure Plan authorizes Staff to make adjustments for certain line items if needed to account for budget shortfalls or overages, being mindful of the Committee's direction to maintain the funding split over the two-year Expenditure Plan outlined below: Expenditure Category Funding Split Prevention & Education 20% Abatement & Enforcement 60% Community Investment 20% This flexibility will allow the City and County to avoid the delays and costs associated with amending the Expenditure Plan. Amendments would only be proposed by Staff if absolutely necessary due to problems adjusting expenditures within each Category consistent with the Committee's direction. Amending the Expenditure Plan will require Staff to convene this Committee as well as seek the approval of the City Council and Board of Supervisors. DESCRIPTION OF STRATEGIES RECOMMENDED FOR FUNDING Funding allocations recommended below are based on the attached Budget Table. The funding allocation amounts are for the two-year Expenditure Plan period unless otherwise identified (e.g. calendar year 2007). PREVENTION & EDUCATION 1. Bulky Clean-ups • Fund subsidy program to provide residents in the Mitigation Fee Primary Funding Area with on-call pick-up service for bulky items that are not accepted in the current on-call clean-ups through Richmond Sanitary Service (RSS) • Cost for each on-call pick-up of bulky items/extra waste is $41 which does not include the disposal charge which varies based on the item and quantity (e.g. non-freon appliances = $25/ea, mattress/sofa = $17.50/ea, etc.) Revised:7/20/2006 Page 2 Of 9 Printed:8/25/2006 2006/2007 North Richmond Waste& Recovery Mitigation Fee Expenditure Plan • Recommended allocation of$32,800 would subsidize 800 bulky item pick- ups (flat pick-up fee only, residents still responsible for disposal charge) 2. Neighborhood Clean-ups • Fund neighborhood clean-up events per year in the Mitigation Fee Primary Funding Area • Explore feasibility of providing one or more events exclusively for creek clean-up and/or bulky items and other materials not accepted through the on-call clean-ups (e.g. tires) • Cost for neighborhood clean-ups can vary significantly, three neighborhood clean-ups recently provided in the City of Richmond averaged $9,000 each • Recommended allocation of$18,000 would fund one or more clean-up events depending primarily on quantity of waste accepted 3. Voucher System • Fund subsidy program to provide residents in the Mitigation Fee Primary Funding Area with vouchers for disposal at Republic's landfill/transfer station on Parr Blvd. • Explore feasibility of property clean-up vouchers that could be given to residents in these areas that are unable to remove waste from their property due to age or disability • City of San Pablo provides residents with up to eight $5 vouchers per household per year upon request, residents must prove residency when picking up vouchers at City Hall and when redeeming vouchers at landfill gate (vouchers do not expire, however RSS only receives the subsidy for vouchers that are actually redeemed) • Recommended allocation of$64,000 would subsidize 12,800 vouchers ($5 each) 4. Community Services Coordinator • Fund full-time Community Services Coordinator through the Community Housing and Development Corporation of North Richmond (existing position being funded by County through 2006) • Community Services Coordinator handles various responsibilities related to illegal dumping and blight in North Richmond including but not limited to: o respond to 1-800-No Dumping calls regarding illegal dumping in North Richmond, o coordinate with RSS & Sheriff's Office to identify/notify individuals potentially responsible for illegal dumping within the Hot Spot Route, and o act as liaison between the community, RSS, City and County regarding illegal dumping and related issues • Recommended allocation of$69,350 would fund this position (including salary/benefits/overhead) for calendar year 2007 Revised:7/20/2006 Page 3 of 9 Printed:8/25/2006 2006/2007 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan 5. Bilingual Outreach Services/Coordinator • Fund bilingual outreach services/coordinator on a contract basis to: o prepare Spanish education & outreach materials o handle Spanish speaking calls to 1-800-No Dumping from North Richmond area o identify opportunities to involve Hispanic community (e.g. attend Hispanic community meetings/events) in fight against illegal dumping and blight i • Recommended allocation of$40,000 would fund an undetermined amount of bilingual services depending onneed/usage and type/cost of service 6. Public Outreach Campaign • Fund establishment of a public outreach campaign directed at reducing illegal dumping and blight in North Richmond • Hire private consultant to help define approach and design campaign, including exploring the effectiveness of Oakland's campaign that used humor to gain public support and assistance related to illegal dumping (approximate cost of Oakland's campaign was $200,000) • Elements of the public outreach campaign may include, but not limited to: o emphasis on positive imagery (children, community, humor, etc.) o door-to-door outreach effort targeting areas subject to frequent dumping requesting community's assistance to report illegal dumping and/or independent hauler activities o inform community members regarding exact details are needed when reporting illegal dumping and who to contact o billboards in community which is changed periodically highlighting on-call clean-ups, HHW facility, how to report illegal dumping, etc. o public service announcements (PSAs) in English, Spanish and Laotian and broadcast on CCTV and cable networks o printed education & outreach materials in English, Spanish and Laotian, which could include: West County specific guide similar to Contra Costa Reuse and Recycling Guide, new/revised brochures (e.g. County's Illegal Dumping Brochures & Richmond's Good Neighbor Brochure), periodic community newsletter about illegal dumping/blight issues, advertisements in Contra Costa Times and other West County publications (listing illegal dumping prosecutions, highlighting educational information that is targeted for season or current events, etc.) o identify most effective mefihods of distribution (eliminate approaches that have not been effective enough in the past) • Recommended allocation of$75,848 could be adjusted if needed to fit within the budget (e.g. reduced to accommodate revenue below the projected amount) Revised:7/20/2006 Page 4 of 9 Printed:8/25/2006 2006/2007 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan ABATEMENT& ENFORCEMENT 7. City/County Pick-up from Right-of-Way • Fund consolidated pick-up program for illegal dumping in the public right- of-way located within the Mitigation Fee Primary Funding Area to supplement similar services provided by RSS in the designated Hot Spot Route • Consolidating pick-up within the right of way in unincorporated & incorporated areas using the City of Richmond Public Works staff is expected to create a stable level of service, minimize delays and maximize efficiencies • City would pick-up of items from public right-of-way located outside of the RSS Hot Spot Route as well as items not suitable for collection in the compactor truck used to service the RSS Hot Spot Route (Hot Spot Route referrals would provided to the City by the Community Services Coordinator) • Recommended allocation of$146,000 would fund incremental cost for City to provide pick-up in the unincorporated & incorporated areas two days per week 8. Vacant Lot Clean-up • Fund clean-up of illegal dumping on vacant lots within the Mitigation Fee Primary Funding Area where existing code enforcement processes prove to be inadequate • Prior to cleaning up vacant lots, require property owners to sign contract agreeing to fence their property and sign waivers allowing clean-up of waste on property • Vacant lot clean-ups (abatements) handled by the County cost an average of $2,000 per lot, however the actual costs can vary significantly • Recommended allocation of$40,000 would fund undetermined number of vacant lots depending on the amount of illegally dumped waste on each lot 9. Vacant Lot Fencing • Fund fencing of vacant lots where chronic dumping occurs within the Mitigation Fee Primary Funding Area when existing fencing ordinance provisions prove to be inadequate I • Establish process to expedite the fencing of certain vacant lots as needed to address unique circumstances (e. g. ordinance provisions require delay and specific location poses high-risk, repeated dumping of particularly harmful wastes, etc.) • Prior to fencing vacant lots, require property owners to sign contract agreeing to maintain fence and sign waivers allowing installation of fence on their property • Vacant lots fenced by the County cost an average of $4,500 per lot, however the actual costs can vary significantly depending primarily on the size of the lot Revised:7/20/2006 Page 5 of 9 Printed:8/25/2006 2006/2007 North Richmond Waste& Recbvery Mitigation Fee Expenditure Plan i • Recommended allocation of$90,000 would fund fencing of an undetermined number of vacant lots, if the cost was consistent with the average mentioned above it would fund 20 fences 10. Code Enforcement Staff • Fund additional full-time County code enforcement position, to assist with vacant lot abatements and fencing as well as other health/building/zoning violations related to illegal dumping throughout the Mitigation Funding Area (incorporated & unincorporated) • Recommended allocation of$129,097 would fund this position (including salary/benefits/overhead) for calendar year 2007 11. Graffiti Abatement • Fund consolidated graffiti abatement program for graffiti visible from the public right-of-way located within the Mitigation Fee Primary Funding Area • Consolidating graffiti abatement services through the City of Richmond Public Works staff is expected to create a stable level of service, minimize delays and maximize efficiencies • Funding removal of graffiti is intended to supplement not replace existing local ordinance requirements (e.g. property owner or parent responsible for clean-up) • Prior to removing graffiti located on private property written approval of property owner may be required pursuant to local ordinance(s) • Recommended allocation of$58,240 would fund incremental cost for City to provide graffiti abatement services in the unincorporated & incorporated areas two days per week 12. Illegal Dumping Investigator/Officer • Fund new full-time illegal dumping investigator/officer to work within the Mitigation Fee Primary Funding Area to: o conduct illegal dumping s l rveillance and investigations o build & file cases specific to instances of commercial dumping, which are suitable for prosecution o conduct targeted sting operations to catch illegal dumpers (law enforcement strike-team(s) may also be available to conduct sting operations) • Recommended allocation of$137,000 would fund full-time Sheriff Deputy on per diem basis and purchase of vehicle equipped with necessary emergency equipment 13. Increase Nighttime Patrols • Fund increased nighttime patrols within the Mitigation Fee Primary Funding Area to target specific locations/timeframes where illegal dumping occurs most regularly • Using private security firm for nighttime patrols would be the most cost effective means of supplementing existing patrols by local law enforcement Revised:7/20/2006 Page 6 of 9 Printed:8/25/2006 2006/2007 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan • Recommended allocation of$58,240 would fund one private security officer working approximately 20 hours per week 14. Surveillance Cameras • Fund surveillance cameras program within the Mitigation Fee Primary Funding Area to target specific locations where illegal dumping occurs most regularly • Determine if more cost effective to purchase surveillance system(s) or hire private firm to manage surveillance system • Factors that affect the cost to install, maintain and operate a surveillance system includes: types of cameras, number of locations to be monitored, quantities of cameras needed per location, property owner approval, adjusting settings/angle, operator training, retrieval/review of photographic evidence (wireless or film) as well as relocation and repair as needed • The following would be considered prior to selecting the type of surveillance cameras to be purchased: o outcome of City's surveillance camera system(s) RFP o utilize CARB's surveillance camera system on a trial basis to test a high-quality surveillance system and determine whether such a system would be effective to aid in prosecuting actual instances of illegal dumping in the North Richmond area o potential of low quality surveillance camera systems to act as deterrent • Recommended allocation of$118,418 could be adjusted if needed to fit within the budget (e.g. reduced to accommodate revenue below the projected amount) 15. Reward System • Fund system to provide monetary rewards between $250-$1,000 to individuals that provide information leading to the successful prosecution of illegal dumping cases • Rewards would be used for cases'that do not fall within the reward provisions of local and state laws as described below: o California law provides for reward of 50% of the fine collected to person(s) that provide information leading to conviction of illegal dumping cases (limited to violations of Section 374.3 of the Penal Code, which is not applicable to littering, hazardous waste or dumping into creeks or other waters of the State) o City Manager is authorized and directed to pay as a reward a sum equal to 25% of the penalty or fine paid for information leading to the successful abatement of nuisances • Recommended allocation of$30,000 could be adjusted if needed to fit within the budget (e.g. reduced to accommodate revenue below the projected amount) Revised:7/20/2006 Page 7 of 9 Printed:8/25/2006 2006/2007 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan 16. Illegal Dumping Prosecutor • Fund portion of new community prosecutor to work within the Mitigation Fee Primary Funding Area to build cases related to illegal'dumping with special emphasis on instances of commercial dumping • City has budgeted to fund a community prosecutor which could dedicate a portion of time to work on cases within the Mitigation Fee Primary Funding Area • Recommended allocation of $ 93,0.00 would fund community prosecutor working approximately 10 hours per week COMMUNITY INVESTMENT 17. Beautification A. Neighborhood Landscaping Projects • Fund landscaping projects within the Mitigation Fee Primary Funding Area, specific projects would be selected after taking the following into consideration: o community input regarding needs/priorities o beautification projects that do not have existing funding sources o regular pruning to maintain any vegetation that is compromising visibility in locations used for illegal dumping o new community gardens' (recruit community and/or school group to start project) on sites subject to dumping • Recommended allocation of $12,000 could be adjusted if needed to fit within the budget (e.g. reduced to accommodate revenue below the projected amount) B. Servicinq Additional Street Cans • Fund collection services for three new street cans within the Mitigation Fee Primary Funding Area (cans to be purchased with grant obtained by Keep North Richmond Beautiful) • Recommended allocation of$1,136 would fund weekly collection for three street cans for calendar year 2007 18. Community Involvement A. Stipends • Fund stipends to West Contra Costa Unified School District students and Youth Build members for illegal dumping abatement and beautification programs within the Mitigation Fee Primary Funding Area • Recommended allocation of$40,000 could be adjusted if needed to fit within the budget (e.g. reduced.to accommodate revenue below the. projected amount) B. Mentorship Program Revised:7/20/2006 Page 8 of 9 Printed:8/25/2006 I I I 2006/2007 North Richmond Waste& Recovery Mitigation Fee Expenditure Plan I I • Fund mentoring program within the Mitigation Fee Primary Funding Area, the program should be designed after taking the following into consideration: o community input regarding needs/priorities o existing programs in the North Richmond area that incorporate mentoring opportunities o potential opportunities to customize new or existing mentoring programs to specifically aid in efforts to combat illegal dumping and blight • Recommended allocation of$31,862 could be adjusted if needed to fit within the budget (e.g. reduced to accommodate revenue below the projected amount) C. Shields Reid Playground Equipment • Fund purchase and installation of new playground equipment for Shields Reid park • Recommended allocation of$125,000 is a one-time fixed cost provided by the City Public Works Department D. Shields Reid Soccer Field Lighting j • Fund purchase and installation of new light fixtures as well as restoration of existing light fixtures for Shields Reid park • Recommended allocation of $15,000 is an estimated one- time cost provided by Keep North Richmond Beautiful I E. Third Street Ballfield Sod Repairs • Fund repair and replacement of damaged portions of sod on the Third Street Ballfield I • Recommended allocation of$25,000 is a one-time fixed cost provided by the City Public Works Department I F. Third Street Ballfield lrrigation I • Fund irrigation system for the Third Street Ballfield • Recommended allocation of $510,000 is a one-time fixed cost provided by the City Public Works Department I I I ATTACHMENT: Budget Table — North Richmond Mitigation Fee Expenditure Plan (2006-2007) I I I I D:\Illegal Dumping\BMPC Mitigation Fee CommitteeUul 28 2006 Meeting\Proposed Expenditure Plan 2006-2007.doc I I I I Revised:7/20/2006 Page 9 of 9 Printed:8/25/2006 I I Budget Table - North Richmond Mitigation Fee Expenditure Plan (2006-2007) Funding Biannual Allocation #of Units # StrategyExpenditure (Projected Total Expense Per Unit Cost Included in 2- (2006-2007) Biannual for Activity Year Budget Revenue depends on#of Pick-up=$41 (not 1 Bulky Clean-ups $ 32,800 800 units including Disposal) 20-yard Debris depends on#of Box=$265(City) variable 2 Neighborhood Clean-ups $ 18,000 units OR$526.02+ events based on $110.44/ton over 4 City average) tons(County) depends on#of Disposal Voucher 3 Voucher System $ 64,000 o units =$5 12,800 20/o ($299,998) Annual Labor= 1 year 4 Community Services Coordinator $ 69,350 $ 129,350 $69,350 (County funding remaining$60k) 5 Bilingual Outreach Services/Coordinator $ 40,000 depends on usage n/a n/a Public Relations Campaign can be designed 6 (includes s Outreach $ 75,848 fit within n/a n/a PSA &Oth Materials) available budget 7 City/County Pick-up from Right-of-Way $ 146,000 $ 146,000 Per Hour=$93.60 1560 (approx) (15 hourstweek) depends on#of Lot=$2,000 8 Vacant Lot Clean-up $ 40,000 lots&cost per (average) 20 lot depends on#of Fence=$4,500 9 Vacant Lot Fencing $ 90,000 fences&cost (average) 20 per fence = 10 Code Enforcement Staff $ 129,097 $ 129,097 Annual Salary$129 097 1 11 Graffiti Abatement $ 58,240 $ 58,240 Per Hour=$37.33 1560 (approx) (15 hours/week) 12 Illegal Dumping Investigator/Officer $ 137,000 60% $ 137,000 Per Hour=$25+ 4160 hours+1 ($899,995) Vehicle=$33,000 vehicle 13 Increase Nighttime Patrols $ 58,240 depends on#of per Hour=$28 2080 units (20 hours/week) depends#of 14 Surveillance Cameras $ 118,418 units&whether Camera=$2,500 49(approx) infrastructure is (approx) needed depends on#of Reward=$250- 15 Reward System $ 30,000 rewards& 30-120 reward amounts $1'000 Annual Quarter- 2 year 16 Illegal Dumping Prosecutor $ 93,000 $ 93,000 Time Salary= (City funding $46,500 remaining) Revised: 7/20/2006 Total cost for labor/per unit items calculated for 2-year period. Page A-1 of A-2 Printed:8/25/2006 Budget Table - North Richmond Mitigation Fee Expenditure Plan (2006-2007) Funding Biannual Allocation #of Units Total Expense # Strategy Expenditure (Projected for Activity• Per Unit Cost Included in 2- (2006-2007) Biannual Year Budget Revenue ....... ... . .................................... ............... ...... ............... ................ .............. ........ ... . ................................... ............... ............. ................ 17 Beautification ........ ................................................ ............... ..... .. .. ... ................ ................ ........ ........... ..................................... ............... ..... .. . .. ................ ................ can be designed Neighborhood Landscaping Projects $ 12,000 to fit within n/a n/a available budget —T—Servicing Additional Street Cans(Weekly) $ 1,136 depends on#of Can=$31.56(per 36(3 cans for 12 units month) months) ............ . .............. .................... ............ ............. ................ ................ 18 Community Involvement .............. ................................................ ............... .. .... ....... ................ ................ .............. ................................................ ............... ....... ....... ................ ................ can be designed Stipends(WCCUSD students&Youth Build) $ 40,000 to fit within n/a n/a 20% available budget ($299,998) can be designed Mentorship Program $ 31,862 to fit within n/a available budget Shields Reid Playground Equipment $ 125,000 $ 125,000 n/a n/a Shields Reid Soccer Field Lighting $ 15,000 $ 15,000 n/a n/a Third St. Ballfield sod repairs $ 25,000 $ 25,000 n/a n/a Third St. Ballfield irrigation $ 50,000 $ 50,000 n/a n/a Committee Administration/Staffing $ 19,740 Prevention& Education Subtotal $ 299,998 $ 299,998 $ 129,350 Abatement& Enforcement Subtotal $ 899,995 1$ 899,995 $ 563,337 Community Investment Subtotal $ 299,998 1$ 299,998 $ 215,000 Grand Total $ 1,499,991 ',$1,519,732 $ 907,687 Prevention&Education(%of Projected Revenue) 100.00% Abatement&Enforcement(%of Projected Revenue) 100.00% Community Investment(%of Projected Revenue) 100.00% Grand Total 100.00% Revised: 7/20/2006 Total cost for labor/per unit items calculated for 2-year period. Page A-2 of A-4 Printed:8/25/2006 Exhibit C North Richmond (incorporated & Unincorporated Areas) Primary Mitigation ❑ UnincorporMed ❑Committee Approved Addition Funding Area Area to Mitigation Funding Area P 77 L OE r) it-I'k L L lid' VIUA.- VE V r! L ENEFOC REWE 11FORN aoj r I SANFORD D COST k RHEEI I DU10 HEWN S F ' C)Ry COALIN A Contra Costa County Map contains copyrighted information Community Development Department Revised on 7128/2006 i E �} 3 �----- M l umrtq-Btvc! HIT on 7!Z I t York St Q .� A: �'r Q Fillet St N Sys p a 3 t_eo st, tU c� Kelsey St t FT nj � Cherry St t. St CD w n C a X rn � m � CL J� E � � et6U2U1 I I I Exhibit B MEMORANDUM OF UNDERSTANDING BY AND BETWEEN THE CITY OF RICHMOND AND THE COUNTY OF CONTRA COSTA REGARDING SOLID WASTE TRANSFER FACILITY HOST COMMUNITY MITIGATION FEES ��} ��;�0 F i Ly 7 1. PARTIES. Effective on the date this agreement is approved by both parties; the City of Richmond, a municipal corporation (City), and the County of Contra Costa, a political subdivision of the State of California (County), mutually promise and agree as follows. 1 2. BACKGROUND. West Contra Costa Sanitary Landfill (WCCSL), Inc. (Applicant or Republic) is requesting amendments to County Land Use Permit (LUP) No. 2054-92, as amended j by LUP 2043-94, and City Conditional Use Permit (CUP) 92-53 as well as a new City Conditional Use Permit (collectively, "the Project"), which includes authorization to construct and operate a Waste Recycling Center (WRC), a solid waste transfer facility, as well as new and expanded processing and resource recovery operations, as set forth in its applications, and explained in the j Draft Environmental Impact Report dated November 2003 for the WCCSL Bulk Materials Processing Center(BMPC) and Related Actions, State Clearinghouse No. 2002102057 (DEIR), prepared by the County's Community Development Department. The Applicant originally proposed constructing the WRC in the unincorporated area of the County. However, subject to the certification of the Final EIR for the Project, constructing the WRC in the incorporated area of the Applicant's property may be the environmentally preferred alternative. Whether the WRC is constructed in the incorporated or unincorporated area of the j Applicant's property, the impacts on both the incorporated and unincorporated host community ___._. .-_.surrounding..the property-will-be-the-same. Furthermore the-new--and expanded-processing-and - - --- resource recovery operations are proposed to be located on both the incorporated and unincorporated area of the Applicant's property, which will impact the host community. Impact 4-5, identified in the DEIR is: i Implementation of expanded operations at the BMPC and Central IRRF, and continued landfill operations at WCCSL through January 2006 present the potential for continued or increased illegal dumping activity in the North Richmond area. This impact is considered potentially significant. Mitigation Measure 4-5 includes a Mitigation ee to benefit the host community, described as follows: Mitigation Fee. The facility operator shall pay a Mitigation Fee of an amount to be determined by the applicable permitting authoi�ity(ies) to defray annual costs associated with collection and disposal of illegally dumped waste and associated impacts in North Richmond and adjacent areas. The mitigation fee should be subject to the joint-control of the City and County and should be collected on all D:TFACILI'FIES-SASENORIC�BMI'C\MII'IGATION FEEWIITIGATIONFEEMOU FINAL-)U LY 62004.DOC Page 1 of 3 I solid waste and processible materials received at the facility consistent with the existing mitigation fee collected at the Central IRRF. The mitigation fee currently collected at the Central IRRF is $2.76/ton, as adjusted j pursuant to the Consumer Price Index ("CPI"), for the Sian Francisco-Oakland-San Jose Area, All Urban Consumers index (hereinafter "the Solid Waste Mitigation Fee"). � I 3. PURPOSE. The purpose of this Memorandum of Understanding (MOU) is to implement Mitigation Measure 4.5, to provide for the joint imposition of the Mitigation Fee irrespective of the final location of the WRC and other BMPC operations, and the joint administration of the mitigation funds for the benefit of the host community as identified in the DEIR. Mitigation funds shall be used, as described in the DEIR, for the benefit of the host community. I I 4. IMPOSITION OF FEE. Inasmuch as the Applicant is seeking multiple entitlements from both City and County in furtherance of the Appliclant's Project as a whole, the Mitigation Fee for the benefit of the host community identified in the DEIR can, and the parties intend, will, be jointly imposed as contemplated in the DEIR. Therefore, the parties hereby agree to jointly impose the Mitigation Fee to be collected on all solid waste and processible materials received at the facility (all BMPC operations including the WRC except those materials which are disposed of in the WCCSL). The amount of the Mitigation Fee�for all solid waste transferred to other Republic landfills shall be the same as the Solid Wastel Mitigation Fee described in Section 2, subject to CPI adjustment at the beginning of each calendar year. The amount of the Mitigation Fee for all other materials processed at the BMPC (exgept those materials which are disposed of in the WCCSL) shall be known as "the Processibles Mitigation Fee" and shall be $0.75 per ton (as adjusted annually pursuant to the CPI described in Section 2) if the rate charged by Republic and/or its Contractor(s) is more than $10.00 per ton (as adjusted annually pursuant to the CPI described in Section 2) or 7% of the gross revenue received by Republic and/or its BMPC Contractor(s) if the rate charged is less than or equal tQ $10.00 per ton (as adjusted annually pursuant to the CPI described in Section 2). If the CPI index described in Section 2 is discontinued, a comparable index shall be selected by the Richmond City Council and the Contra Costa County Board of Supervisors. Republic is not, and shall not, be authorized to offer to Republic customers pricing for combined or"bundledP' services with services to process materials at the BMPC such that Republic's pricing of said services could be designed to circumvent the imposition of the Processibles Mitigation Fee on processible materials as provided for herein. The parties agree that the Mitigation Fee will be implemented through conditions in permits for the WRC and BMPC to be issued by the City and/or County, as appropriate. I 5. JOINT ADMINISTRATION. City and County agree that the Mitigation Fee monies collected from the Applicant will be paid to the County , held in a dedicated separate account and jointly administered for the benefit of the incorporated and unincorporated North Richmond area. Recommendation for expenditures of the Mitigation �iee shall be made by a committee composed D:IFACII.ITIES-SABENORIO\DMPC\MITIGATION FEENI'1'IGATIONFEENIOU_FINAL-JULY62004.DOC Page 2 of 3 I I I I I I I I of three members of the Richmond City Council, one member of the Contra Costa County Board f of Supervisors, two members of the North Richmond Municipal Advisory Committee appointed by the Contra Costa County Board of Supervisors (both of whom must be residents from the unincorporated North Richmond area), and one resident from the incorporated portion of North Richmond appointed by the Richmond City Council. Fpnal approval of a two year expenditure plan shall be made by the Richmond City Council and the Contra Costa County Board of Supervisors. In the event that a two year expenditure pan is not adopted by the Richmond City Council and the Contra Costa County Board of Supervisors, the Mitigation Fee monies shall be ! divided equally between the City of Richmond and Contra Costa County and shall be spent to mitigate the impacts of the Project on the host community. 6. AMENDMENT. This MOU may only be modified or amended by a written document approved by the City's Council and County's Board of'Supervisors. 7. TERM. This MOU shall be coternlinous with the operation of the BMPC, except that upon operation ceasing at the BMPC, this MOU shall continue until all of the funds collected are expended for the benefit of the host community. CITY OF RICHMOND, CALIFORNIA, COUNTY OF CONTRA COSTA, a political a municipal corporation subdivision dthete lifornia B B I Attest: CITY CLERK Attest: John Sweeten, CLERK OF THE BOARD By: By: ' I Date: _��_u` Date: i o I Date of Council Approval: Date of Board Approval: 7hW:zoo* i y y I D:IFACILITIES-SABENORIO\BMPC%4ITIGATION FEEVMITIGATIONFEEMOU FINAL-IUI.Y62004.DOC Page 3 of 3 i