SUBJECT: AUTHORIZE THE GENERAL SERVICES DIRECTOR, OR DESIGNEE, TO EXECUTE A
CONTRACT WITH SWINERTON MANAGEMENT AND CONSULTING, INC. IN THE
AMOUNT OF $650,000 TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR
THE DISTRICT ATTORNEY'S NEW BUILDING PROJECT AT 950 WARD STREET,
MARTINEZ (WH224Y)
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1. APPROVE a Consulting Services Agreement dated August 8, 2006 through June 30, 2008 with
Swinerton Management and Consulting, Inc. (Swinerton) in the amount of $650,000 to provide
construction management servicesfor the District Attorney's New Building Project, 950 Ward Street,
Martinez.
2. AUTHORIZE the Director of General Services, or designee, to execute the agreement and to issue
written authorizations for extra work provided that the cumulative total extra cost for all such
authorizations shall not exceed $25,1000.
FINANCIAL IMPACT
The project is being funded through a combination of appropriations already budgeted in a capital project
account for this project, Criminal Justice Construction Funds that are restricted for use on criminal justice
facilities projects, and proceeds from a future lease revenue bond sale to be executed in late 2006.
BACKGROUND
a
The project involves constructing a new District Attorney Headquarters Building at the downtown Martinez site
bounded by Las Juntas, Court, Green, and;. and Streets. The new building will be four stories in height and
consist of a total of approximately 53,000 Sore feet. The existing structures on the site, including the former
Assessor's Building will be demolished.`The adjacent Veteran's Memorial Building will remain intact.
The new building will consolidate and h fuse 150 District Attorney employees and include offices for the Victim
Witness program, the Juvenile Unit, the Drug Unit, Domestic Violence, Sexual Assault, Law and Motion,
Information Technology, a law library, Felony Three Strikes, Homicide, Welfare Fraud, Administration, Special
Operations, Auto Insurance Fraud, and Worker's Compensation Fraud. Upon completion of the project, the
District Attorney's Office would vacate leased offices space at 627 Ferry Street as well as County-owned
space at 1111 Ward Street, 3rd floor, 10 Douglas Drive, 2"d floor, and 725 Court Street, 4th floor.
CONTINUED ON ATTACHMENT: X YES SIGNATURE:
_/RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE _OTHER
SIGNATURES: c
ACTION OF BOAR U,.G�tS� D (Y)��j I APPROVED AS RECOMMENDED X _ OTHER
VOTE OF SUPERVISORS
UNANIMOUS(ASSENT V )
AYES: NOES:
ABSENTS: ABSTAIN:
MEDIA CONTACT:MICHAEL J.LANGO(313-7100)
Originating Dept.:General Services Department HEREBY CERTIFY THAT THIS IS A TRUE
cc: General Services Department AND CORRECT COPY OF AN ACTION TAKEN
Capital Projects Management Division AND ENTERED ON THE MINUTES OF THE BOARD
Accounting OF SUPERVISORS N THE DATE SHOWN.
CPM File: 250-0512/A.1.1
250-0512/A.5 ATTESTED lA ,`Z,�;(�
County Administrator's Office JOHN CULLADMEN RK OF 7 BOARD OF SUPERVISORS
County Counsel AND COUNTY INISTRATOR
Auditor Controller
District Attorney's Office(via CPM) BY '^ZG/ DEPUTY
Swinerton Management&Consulting, Inc.(via CPM)
RQ005\2500512\051-012075b.doc RL:tb Page 1 of 2 M382(10188)
1
AUTHORIZE THE GENERAL tSERVICESECTOR, OR August 8, 2006
DESIGNEE, TO EXECUTE A CONTRACT WITH SWINERTON
MANAGEMENT AND CONSULTING, INC. IN THE AMOUNT
OF $650,000 TO PROVIDE CONSTRUCTION MANAGEMENT
SERVICES FOR THE DISTRICT ATTORNEY'S NEW
BUILDING PROJECT AT 950 WARD STREET, MARTINEZ
Bidding has commenced on the project, with the bid opening date set for August 24, 2006. The General
Services Department has completed a pre-qualification process and determined a pool of pre-qualified general
contractors allowed to bid on the project. In addition, the hazardous materials abatement and demolition
phases of the project will take place ahead of time to expedite the schedule and mitigate some of the
unforeseen conditions.
Because of the scale and complexity of the project, it is recommended that a professional firm provide full-time
construction management ("CM") services for the project. The services to be provided include bid documents
review, preparation of specifications, demolition phase coordination, construction phase management, and
close-out coordination. The General Services Department conducted a competitive selection process to hire a
CM firm. Swinerton Management and Consulting, Inc. (Swinerton) was ranked the highest during this process.
Swinerton has a local office in Concord and their corporate office is in San Francisco. Contract terms for
providing comprehensive CM services were successfully negotiated, and staff recommends approval of the
consulting services agreement.
HA200512500512W5012075b.doc Page 2 of 2 M382(10/88)