Loading...
HomeMy WebLinkAboutMINUTES - 08152006 - C.12 I Std__' pF TO: BOARD OF SUPERVISORS Contra FRONT: MAURICE M. SHA:. PUBLIC WORKS DIRECTOR 1,_ -���,<� Costa z. 'z. DATE: August 15. 2006 s�9 C� County i SUBJECT: APPROVE and AUTHORIZE the Public Works Director.or designee.to execute a contract amendment � with Earth Tech. Bethel Island area. (_Federal Funds.Local Road Funds) ("District V) Project\o. 066?- 6R4043-02 I SPECIE=RE+ LEST.S:ORRECC.\1`.:E\DA.CN:S:SB=CKC-ROUND ANDiUSTIFiCATION RECO-AIZiE\DED ACTIO\: I APPROVE and AUTHORIZE the Public Works Director. or designee. to execute Amendment \o? to the. Consulting Services Agreement(CSA)with Earth Tech effeetiv e August 15.'-006,to increase the payment limit by I S 116.000 to a new payment limit of S717.000 to provide additional bridge design services for the Bethel Island Road � Bridge Replacement Project. j FISCAL IMPACT: i I There is no impact to the Count-General Fund. This project is covered 88.5%by Federal bridge replacement funds i and 11.5% by local Road Funds. I I i CO\TI\TI=ED ON ATTACHMENT: ❑x SIGNATURE: J RECOMMENDATION OF COCSTI ADMINISTRATOR RECOMMENDATION OF BOARD CONINI T E � ,�APPROVE OTHER SIGNATLREISI: ACT.`.'C•\OF BOA D' _- °WSJ` 6APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS- I HEREBY CERTIFY THAT TMS iS A TRLE AND CORRECT rOPY OF AN ACTION TAKEN A`:D ENTERED OWN L-NA\Da_LS ABSENT a'n L� MINLT-S OF THE BOARD OF SUPERC'SORS ON THE AYES_ NOES DATE SH011KN. ABSENT ABS-!A.\ I I NLkp ATTESTED G-Desion BOARD=ORDERS Mits Earth Teat Conaact Ame.^.d-dec Cc- Gunn Admini trator JOHN CL N:CLERK OF THE BOARD OF Audi-.1.r-Contralter SLPERVTSORS I C-Iun: co-ncei Crntrae,jr ' - BY: �EY-:`-- I —TT• i I SUBJECT: APPROVE and AUTHORIZE the Public Works Director. or designee. to execute a contract amendment with Earth Tech. Bethel Island area. (District V) Project No. 0662-6R4043-02 I DATE: August 1 1-006 PAGE: , of'_ I I REASONS FOR RECOMME\DATIO\S AND BACKGROUND: I Bethel Island Road Bridge has been identified by the Federal Highway Bridge Replacement and Rehabilitation Program as being structurally and functionally inadequate and is eligible for federal funds to replace it. On November 14. -'_000 the Board approved a consulting services agreement � (CSA)with Earth Tech(formerly J.duller International)for bridge design services. The agreement i contained a proposed schedule for the completion of the environmental phase of the project by mid 2001. Earth Tech played a support role in this phase.with Counts-Public Works taking the lead. It wasn't until mid 1-004 that the Count- received approval from Caltrans and the Federal Highway Administration for the environmental document. During a portion this dela- Earth Tech's design work was put on hold: however they did provide management services in support of the lengthy environmental phase which exceeded the original scope of the CSA. Further.due to the lengthening of the project schedule, actual labor rates have escalated beyond those used to develop the original budget. This amendment provides a new rate schedule to allow the consultant to charge for their services at current rates. Also. several conditions led to unanticipated increases in project complexity and associated design efforts. Finally.the utilities to be accommodated on the new bridge structure are more complex and i numerous than originally anticipated. Due to project delays out of the consultant's control and other changes from the original design � assumptions.estimated costs for completion of Phase 2(final design)work exceed the budget limits � approved in the original CSA dated November 2000. � I This amendment corers additional costs for Phase, (final design)bridge design services.allowing I additional budget for services provided by the prime consultant. Earth Tech. and one of the i subconsultants. Imbsen& Associates. CONSEQUENCES OF NEGATIVE ACTIO\: I If the amendment is not approved.the consultant cannot be paid for out of scope items of work thus � delay ine the project and preventing completion of the plans and specifications. � i I i I I I i i I � I I I AMENDMENT No. 2 j CONSULTING SERVICES AGREEMENT PROJECT NAME: Bethel Island Road Bridge Replacement Project Project No.: 0662-6R4043-02 Federal Project No.: BRLS 5928 (024) 1. Parties: Effective on August 1-0.2006.the Coun'y of Contra Costa.a political subdivision of the State of Califorrra,hereinafter referred to as"Public Agency."and Earth-1 ech.hereinafter referred to as•'Consultant.'•mutually agree and promise as follows: 2. Purpose: The parties desire to amend the agreement they entered into effective November 14. 2000, entitled "Consulting Services Agreement."hereinafter referred to as the"Agreement." The Agreement is for bridge design services for the replacement of the Bethel Island Road Bridge over Dutch Slough in the Bethel Island area. This Amendment provides for'he following: a. Consultant company name change b.Additional Phase 2 budget c. Update consultant's rate (fee) schedule. d. Update the Consultant's tax payer I.D. number I I 3. Amendment(s)to Agreement: I a.Amend section 1(b): Consultant's Name: Earth Tech. (note: Earth Tech acquired J. Muller International in 2002) I b. Amend section 1(e): Payment Limit Phase 2: Total Labor: 5367,992.81, Total Fee: S44,159.13. Consultant shall divide the Total Labor and Total Fee payment between itself and subconsultants for Phase 2 as follows: Earth Tech Phase 2 budget= S296.206.24 Y&C Phase 2 budget= S2.842.02 i Imbsen Phase 2 budget= $113.103.68 I c. Amend Appendix B by adding the attached '2006 Earth Tech Fee Schedule'and deleting the staff rates set forth in the"Cost Proposal Summary' in Appendix B. Additionally, amend Appendix B by adding the following paragraph below the paragraph entitled "Method of Payment": i Consultant's Fee Schedule Consultant may adjust, on an annual basis on January 1, its staff rates to reflect adjustments to individual compensation. Such changes shall be equal to consultant's actual changes in hourly rates. Prior to each annual rate change, Consultant shall provide Public Agency with at least 30 days advanced written notice of the changes. In no case shall the average of all adjustments in a given year exceed five (5) percent, or an individual adjustment exceed eight(8)percent. I d. Amend Sections B&D of"Method of Paymen " in Appendix B to increase the fixed fee for Phase 2o 544.159.31 l and increase the limit or.the total amount payable by the Public Agency to S717.000.00 respectively. e.Amend section 1(g) Federal Taxpayer's I.D. Number: 95-2661922 4. Remaining Provisions: i Except for the changes made by this Amendment,all prov :ons of the Agreemen'shall remain in full force and effect. 5. Sionatures: These signatures attest the parties' agreement to th;s Amenament. I I I 1 of 2 j I L I i i AMENDMENT No. 2 � CONSULTING SERVICES AGREEMENT PROJECT NAME: Bethel Island Road Bridge Replacement Project Project No.: 0662-6R4043-02 Federal Project No.: BRLS 5928 (024) PUBLIC AGENCY / CONSULTANT By: By. 16� //�Zel Mauri -81*j Charles Alpert ' Public Woos Director Vice President& Assistant Secretary By: � William E. Garrett, Assistant Secretary Note to Consultant: For corporations. the contract must be signed by two officers. The first signature must be that of the chairman of the board. president or vice-president; the second signature must be that of the secretary. assistant secretary, chief financial officer or assistant treasure. (Civ. Code,Sec. 1190 and Corps. Code.Sec.313). The acknowledgement below must be signed by a Notary Public. i I I CERTIFICATE OF ACKNOWLEDGEMENT I I State of California ) I ) SS. County of Los Angeles ) On this date written below, before me, the undersigned Notary Public, personally appeared the person(s)signing I above for Consultant, personally known to me (or proved to me on the basis of satisfactory evidence) to be the I person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she!they executed the same in his/her/their authorized capacity(ies). and that by his/her/their signature(s)on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. i Witness my hand and official seal. rnannru ronnco Ccmmm1on*tQAW I Dated: _ �� —L �• wotti�6 = 0 [Notary's Seal] I Jarmita Tomko, Notary Public APPROVED AS TO FORM: SILVANI B. MARCHESI County Counsel l i Deputy i I = -_=s,zr 6C•ARD CRDE4S20D5Be:r=_i fs.anamerome no 2 cpra ed 8-10-2035.&C I 2of2 I I I i I APPENDIX B I 2006 Earth Tech Fee Schedule Classification Hourlo• Rate Technical D.ecto- 555.80 o S. 5.00 - Pro ect%lana-e., 'S 43.16 to -4-4.87 Senio- Bridae En;;in-er 533.16 to S44.871 i Sen or EnQ neer" X3}.16 to S-4-1.87 B iaee Engineer 3.G- to S36..'1 Bridge Desiener S3=.0- ro 536.;1 "- CADD Technician S31.=3 to $36.13 I I _- Br;d--e Intern 56.83 to S13J6 I Aamimstra'iveA�=istant S1_'.-6 to 514.13 I I I I I I I I I I I I I i I I Earth Tech I I