Loading...
HomeMy WebLinkAboutMINUTES - 08132006 - C.30 .. .. FE-.L --.TO:---. .:!BOARD--OF-SUPERVISORS--- -- _ FROM: MAURICE M. SHIU PUBLIC WORKS DIRECTOR Costa atii. jx C . 3o v'k t DATE: . June 13, 2006 �a: - � •�" Sp'q.COUtYf4 County i SUBJECT: I; APPROVE Master CooperativeAgreement for the 2006 West Contra Costa Transportation Advisory !'Committee Subregional Transportation Mitigation Program; FIX Public Hearing for July 18,2006, V for Adoption of Urgency and Regular Fee Ordinances; West County area.(Districts I and II) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Reco II mended Action: 1. APPROVE and AUTHORIZE the County Administrator, or designee, to execute the Master Cooperative Agreement-for the 2006 West Contra Costa Transportation Advisory Committee .(WCCTAC) Subregional Transportation Mitigation Fee Program. 2. FIX a Public Hearing for July 18, 2006 at 9:30 a.m. to consider adoption of an urgency ordinance land a regular ordinance to establish Subregional Transportation Mitigation Fee Program Fees to fund the revised Subregional Transportation Mitigation Program for WCCTAC. 3. .DIRECT the Clerk of the Board to Publish the Notice of Public Hearing in compliance with Section 6062a of the California Government Code. .4. DIRECT the Public Works Director to mail notice of hearing in compliance with Government Code Sections 54986 and 66017. Continued on Attachment: ® SIGNATURE: [RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMME i'DATION OF BOARD COMMITTEE ['-APPROVE' OTHER SIGNATURE( )S liL �—� ACTION OF BO RD ON GG7J(/ APPROVED AS WCOMMENDED Kr OTHERI ❑ I.hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. VOTE/�F SUPERVISORS �� UNANIMOUS(ABSENT Ale 7-.,e�, ) � AYES: l NOES: ABSENT: ABSTAIN: ATTESTED: ��'�'�� A3,-ZAI-0 io BL.je III JOHN CULLEN, CIerk of the Board of Supervisors and G:\GrpData\TransEng\AgB\WCCTAC\BO-WCCTAC Approve Master Coop Agreement. Orig.Div:Public works(TE) County Administrator Contact: BriaLouis,313-2245 c: PWA ccounting–C.Raynolds PW Eng'.Srvs.–T.Torres PW Trans.Eng.–C.Lau County Auditor/Controller $y Deputy County Il'reasurer/Tax Collector —� P l' I II it I -- S-UBJECT-:—�IAP-PROV-E-Master Cooperative Agreement-for-the 2006 West Contra-Costa-Transportation Advisory.. -- . .. Committee Subregional Transportation Mitigation Program; FIX Public Hearing for Adoption of Urgency and Regular Fee Ordinance; West County area. (Districts I and H) DATE: !June 13, 2006 PAGE 2 i II. Finanlciallmpact: �I I Adoption of the ordinances will result in the collection of fees from new developments to fund subregional transportation improvements within the West Contra Costa Transportation Advisory Committee fee area. There wbe no impact to the General Fund. Fill III. Reasos for Recommendations and Background: II The SubIregional Transportation Mitigation Program (STMP) was first adopted by the West Contra Costa =o, rtation Advisory Committee(WCCTAC),the Cities of El Cerrito,Hercules,Pinole,Richmond,and Contra Costa County,and the Contra Costa Transportation Authority(CCTA)in 1997,by way of a Cooperative Agreement and local ordinances. The program consisted of developer fees in the amount of $700 (per residential unit, $560 per multi-family residential unit, and $.20 per square foot for commercial/industrial/office space. The fees charged were considerably lower than what would have been allowed by the nexus analysis. [Califomia legislation requires, among other things, that fees on new developments bear a reasonable relationship (nexus) to the cost of the public facilities, or portion of the public;facilities attributable to the developments on which the fee is imposed. California courts have]ong- used the reasonableness standard or nexus to evaluate the constitutionality of exactions,including developer fees.] The three projects that were partially funded in the 1997 program were: the Highway 4 West divided highway, the El Cerrito BART Parking Structure, and the Richmond Intermodal Station. I I INFORMATION ON THE PROGRAM UPDATE The updated STMP program is a 25-year program. ABAG s Projections 2003 provided the growth projections in households and employment for West County. These statistics and standard trip generation rates from the Institute of Transportation Engineers Trip Generation Handbook-allowed the consultants to estimate the total increase in peak hour trips in the morning commute period(28,571 trips). Richmond and Hercuies account for more than 75 percent of the new trips. The following table shows the growth in new a.m. peak hour trips in the next 25 years (2005 to 2030) for the West County jurisdictions: Richmond 58.5% j Hercules 18.1%1 Pinole 7.8% EI Cerrito 5.6% San Pablo 5.2% II Rodeo-Crockett 4.8% A list lof projects needed to accommodate future traffic was prepared by the WCCTAC Technical Advisory Committee(TAC). Eleven projects are currently on the list. In general,because most projects mitigate both existing and future deficiencies,the amount of STMP funding varies from 27.5%to 50%of the project cost. The consultant team includes a firm that specializes in studying the relationship between the impacts of the new(growth and the fees proposed. II1 II � II I 1 ---SUBJECT-:l APPROVE-Master-Cooperative-Agreement for-the-2006 West Contra CostaTransportationAdvisory--- 1 Committee Subregional Transportation Mitigation Program; FIX Public Hearing for Adoption of. ii Urgency and Regular Fee Ordinance; West County area. (Districts I and II) DATE: i1 June 13, 2006 PAGE 113 UPDATED PROJECT LIST I The are- eleven projects recommended by the TAC (and the STMP funding amount) are: 1. IRichmond Intermodal Station $15,000,000. 2. I Interchanges on I80 at San Pablo Dam Road and at Central; and on Highway 4 at Willow - 1$14,280,000. 3. Capital Corridor Improvements (Hercules train station and track/safety improvements) - $13,255,000. 4. I(Ferry Service from Richmondi and/or Hercules/Rodeo -$12,650,000. 5. (BART access and/or parking 'improvements - $25,330,000: 6. Bay Trail Gap Closure - $1,510,000. 7. San Pablo Dam Road Improvements in Downtown El Sobrante - $1,900,000. 8. San Pablo Avenue Corridor Improvements - $1,650,000. 9. I N. Richmond Road Connection Project-$4,000,000. 10. i Hercules Transit Center Relocation - $1,650,000. 11. I Del Norte Area Transit Oriented Development Project—6,875,000. Project numbers 6, 7,and 8 are located in the unincorporated West Contra Costa County area,which would benef t from these improvements. Specific project descriptions can be found in the attached program update. There are a diverse range of projects represented,and many of the projects are also funded by Measure J-the renewed transportation sales tax measure in Contra Costa County. With the recent shortfall in transportation funding, the developer fees will help to make up funding gaps. li POTENTIAL FEES AND REVENUES I'I In 1997, the nexus analysis showed that WCCTAC could legally establish fees at a level (i.e. residential at $2,345 per dwelling unit) that would generate a total of $24.5 million over 13 years; however, the established fees were set lower(i.e. residential at $700 per dwelling unit) and it was anticipated that S5.1 million would be raised over the lifelof the program (1997 to 2010) at the reduced fee level. I� If the(full fees justified by the updated nexus analysis are approved by WCCTAC and the other member entities,the updated program would 'generate approximately$98 million over 25 years. The proposed fees are: Single-family residential $2,595 Multi-family residential $1,648 Senior Housing $701 per dwelling unit III Hotel $1,964 per room Retail/Commercial $1.82 per square feet 1 Office $3.51 per square feet Industrial $2.45 per square feet Storage Facility $0.53 per square feet I 1 i li SUBJECT: 'APPROVE of Master Cooperative Agreement for the 2006 West Contra Costa Transportation lAdvisory Committee Subregional Transportation Mitigation Program; FIX Public Hearing for Adoption of Urgency and Regular Fee Ordinance; West County area. (Districts I and H) DATE: ;June 13, 2006 j PAGE 4 it (Church $1.58 per square feet Hospital $4.21 per square feet 'Other $3,507 per AM peak hour trip ii The above WCCTAC STMP Fees are subject to annual adjustment. An additional administrative fee equal to 2% of the program revenue will be assessed by the County. II I In order,to implement the new WCCTAC STMP fee schedule, it is necessary for the County and the other member agencies to adopt new ordinances or resolutions. Staff recommends that the Board fix a pubic hearingl for July 18, 2006 at 9:30 a.m. to consider the adoption of an urgency ordinance and a regular ordinance implementing the WCCTAC STMP fees. I It was determined by the Board of Supervisors at the April 11, 2006 board meeting, that the WCCTAC STMPlii ate activity is not subject to the California Environmental Quality Act (CEQA). The Notice of Exemption was filed with the County�(Clerk on April 12, 2006. l l Ij IV. Conselguences of Negative Action: 'I Failure�to fix the hearing date to consider adoption of the ordinances could delay implementation of the ordinances and result in loss of fee revenue, and would. be inconsistent with the intent of the Master Cooperative Agreement, which established the WCCTAC fee program. In addition, the developer contribution for subregional improvement projects is necessary to comply with the concepts of the County's Growth Management Program which requires new growth to fund the additional infrastructure capacity required to serve that growth. The Gr6wth Management Program became a requirement with the passage of Measure "C" which was approved by the voters in 1988. II I I I I � II I l � li l l I II I li I ii it I it II l I e MASTER COOPERA TIVE A GREEMENT B!YAND AMONG THE CONTRA COST, TRANSPORTATIONAUTHORITY THE CITIES OF EL CERRITO, HERCULES,PINOLE, RICHMOND,AND SAN P.ABLO, THE COUNTY OF CONTRA COSTA AND THE WEST CONTRA COSTA TRANSPOR TA TION AD VISOR Y COMMITTEE FOR THE 2006 SUBREGIONAL TRANSPORTATION MITIGATION FEE PROGRAM This AGREEMENT is made and entered into as of this I9 day of C 4rp L , 2006, by and between the Contra Costa Transportation Authority, a local transportation and improvement authority organized under the provisions of California Public Utilities Code Section 180000 et seq., hereinafter referred to as AUTHORITY; the cities of El Cerrito, Hercules,Pinole, Richmond, San Pablo, and the County of Contra Costa, collectively referred to herein as SPONSORS; and individually as a SPONSOR, and the West Contra Costa Transportation Advisory Committee, a Joint Exercise of Powers Agency organized pursuant to a Joint Exercise of Powers Agreement among the cities of El Cerrito, Hercules, Pinole, Richmond, and San Pablo, the County of Contra Costa, and the transit agencies AC Transit, Bay Area Rapid Transit District, and Western Contra Costa Transit Authority,hereinafter referred to as WCCTAC. The AUTHORITY,•SPONSORS, and WCCTAC shall sometimes be referred to collectively herein as the "Parties" anid individually as a"Party". RECITALS WHEREAS, AUTHORITY, SPONSORS, and WCCTAC,pursuant to the Contra Costa Transportation Improvement and Growth Management Expenditure Plan and Ordinance (referred to herein as "Measure C") adopted and approved by the voters in 1988, and pursuant to the extension of the transportation sales tax (referred to herein as "Measure J") adopted and approved by the voters in November 2004, hereby desire to enter into a Cooperative Agreement for transportation improvements in West Contra Costa County to be funded in whole or in part by developer fees collected under the West County Subregional Transportation Mitigation Program ("STMP"). The 2006 program (the "2006 STMP") is intended to supersede the original STMP adopted in 1997 (the"1997 STMP"). The transition from the 1997 STMP to the 2006 STMP is outlined herein. This Agreement shall terminate and supersede the prior Master Cooperative Agreement Between Contra Costa Transportation Authority, the Cities of E1 Cerrito, Hercules, Pinole, Richmond, and San Pablo, the County of Contra Costa and the West Contra Costa Transportation Advisory Committee, dated September 17, 1997; and WHEREAS, each SPONSOR by local ordinance or resolution, enacted the STMP, which levies a fee ion new development to mitigate the impacts of new trips generated by that development in conformity with the Mitigation Fee Act (Gov. Code §§ 66000 et seq., referred to herein as the "Act'P; and WHEREAS, the 1997 STMP partially funded three projects —Highway 4 West, the El Cerrito Plaza BART Station Parking Structire, and the Richmond Intermodal Station Facilities Enhancement Program; and i Page 1 of 17 i WHEREAS, fees from the 2006 STMP are proposed to partially fund the following eleven regional transportation projects (collectively referred to herein as the "Projects" and individually as a"Project"): 1. Richmond Intermodal Station(WCCTAC; Richmond Community Redevelopment Agency) 2. Interchanges on I-80 at San Pablo Dam Road and Central Avenue, and on Highway 4 at Willow Avenue (Authority); 3. Capitol Corridor Improvements: Hercules Passenger Rail Station (City.of Hercules) and capital improvements along the:corridor(WCCTAC; Capitol Corridor Joint Powers Authority); 4. Ferry Service from Richmond and/or Hercules/Rodeo (WCCTAC; Sart Francisco Bay Area Water Transit Authority, Cities of Richmond and Hercules); 5. BART Access and/or Parking Improvements (BART; WCCTAC); 6. Bay Trail Gap Closure (WCCTAC; East Bay Regional Park District); 7. San Pablo Dam Road iI provements in downtown El Sobrante (Contra Costa County); 8. San Pablo Avenue Corridor Improvements (WCCTAC Cities/Contra Coster County);. 9. North Richmond Road Connection Project (Contra Costa County); 10. Hercules Transit Center Relocation (City of Hercules); and 11. Del Norte Area Transit-Oriented Development Project Public Improvements (City of El Cerrito). WHEREAS, the nexus findings, in conformity with Government Code section 66000 et seq. can be found in the 2006 STMP, including the "Project Nexus Discussion" for each project; and WHEREAS, the designated lead agency for each project in the 2006 STMT ("Project Sponsor") is listed in parenthesis in the above list (with participating agencies listed after the lead agency and v WHEREAS, this Agreement outlines the roles and responsibilities of the Parties relative to the administrative, fiscal, and project management of the 2006 STMP projects; and entity for the program, and will coordinate WHEREAS, WCCTAC is the primary responsible and administer the STMP expenditures, the priority for fee disbursements, and provide general management of the STMP consistent with its mission;and I Page 2 of 17 WHEREAS, WCCTAC has evaluated the components of the 2006 STMP and finds that the establishment, imposition, collection, transfer and use of development fees for the purposes and Projects described herein are necessary to mitigate traffic impacts caused by new development and authorized by all applicable legal.authorities; NOW!THEREFORE, in consideration of the foregoing, the Parties hereby agree as follows: A. PURPOSE The purpose of this Agreement is to formalize the institutional arrangements for the collection, oversight, and expenditure of the 2006 STMP fees and the close out of the. 1997 STMP program. B. CLOSE-OUT OF FEE COLLECTION AND EXPENDITURE FROM THE 1997 STMP Fees will no longer be collected for the Highway 4 West,the El Cerrito PIaza BART Station Parking Structure, and ithe Richmond Intermodal Station Facilities Enhancement Program projects as of the Effective Date. 1. Fees collected and unspent for the Hi&way 4 West project shall be spent no later than December 31, 2006. 2. Fees collected and unspent for the El Cerrito Plaza BART Station Parkin. Structure project shall be spent no later than December 31, 2006; or the funds may be transferred to the Del Norte Area Transit-Oriented Development Project in the 2006 STMP for design, engineering, and/or environmental activities. 3. Fees collected and unspent for the Richmond Intermodal Station Facilities Enhancement Program project shall be spent no later than December 31, 2006;.or the funds may be transferred to the Richmond Intermodal Station project in the 2006 STMP fordesigri, engineering, and/or'environmental activities. C. FEES I. Imposition of the Fees.. In order to fund the 2006 STMP, SPONSORS shall consider the adoption; by ordinance or resolution,the following developer fees, to be payable at the time of issuance of building permits: LAND USE FEE Single-Family Residential $2,595/DU* Multi-Family Residential $1,648/DU Senior Housing $701/DU Hotel $1,964/Room Retail $1.82/SF** Office $3.51/SF Industrial $2.45/SF Page 3 of 17 Storage Facility $0.53/SF Church $1.5 8/SF Hospital $4.21/SF Other $3,507 per AM peak hour trip *DU=Dwelling Unit **SF=Square Feet The fees for uses not listed above shall be determined by the SPONSOR collecting the fee according to information generated by appropriate traffic studies or other means of determining traffic impacts as approved by WCCTAC, or in accordance with the Institute of Traffic Engineers (ITE) Manual. 2. . Tribal Gamin Facility Developments. The Parties agree that a tribal gaming facility's subregional traffic impacts should be mitigated and that WCCTAC shall be included in any evaluation and detennination of such impacts and their mitigation. Monies to pay for mitigation of such subregional impacts may be governed by a tribal-state compact or a tribal- local agency agreement. The collection of any such monies shall be subject to applicable state and federal law, including but not limited to the Indian Gaming -and RegulatoryAct, 25. U.S.C. §§ 2701-2721. 3. Transfer of the Fees. No more than thirty(30) days following the close of each calendar quarter endil.12 after the Effective Date, all STMP fee revenue collected by a SPONSOR will be transferred by the SPONSOR.to the City of San Pablo with a brief Quarterly Report that describes the revenue and any fee reduction(s) granted by the SPONSOR. The City of San Pablo shall deposit the funds into a separate interest- bearing capital facilities account for the STMP revenues to be used solely for the purposes described heljein, and in the fee resolutions or ordinances adopted by the SPONSORS pursuant to this Agreement,. The revenues, including any accrued interest from the accoiult, will be disbursed and expended only for the eleven projects identified in S-ection D below. 4. Project Sponsors; Oversight Responsibilities. i. WCCTAC is r I sponsible for the oversight of. (1) the Richmond Intermodal Station project; (2)Ferry Service from Richmond and/or Hercules/Rodelo; (3) the Bay Trail Gap Closure project; and (4) the San Pablo Avenue Corridor Improvements. ii.. The AUTHORITY is responsible for the oversight of the Interchanges on I-80 at San Pablo Dam Road and Central Avenue, and on Highway 4 at Willow Avenue. ; Page 4 of 17 iii. The City of Hercules is responsible for the oversight of the Capital Corridor Improvements at the Hercules Passenger Rail Station and the Hercules Transit Center Relocation. iv. The San Francisco Bay Area Rapid Transit District is responsible for the oversight of BART Access and/or Parking Improvements. V. Contra Costa County is responsible for the oversight of the San Pablo Dam Road Improvements in downtown El Sobrante and the North Richmond Road Connection Project Public Improvements. vi. The City of El Cerrito is responsible for the oversight of the Del Norte Area Transit-Oriented Development Project. 5. Reports. Pursuant.to•Government Code section 66006(b)(1), within 150 days after the end of each fiscal year, the City of San Pablo, in cooperation with the Project Sponsors, shall make available to the public and to SPONSORS a status report on the progress attained and costs incurred to date on each Project in the 2006 STMP, including but not limited to: i. - A brief description of the type of fee in the account or fund. ii. The amount of the fee. iii. The beginning and ending balance of the account or fund. iv. The amount of the fees collected and the interest earned. V. An identification of each public improvement.on which fees were expended and ithe amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees. vi. An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as identified in paragraph (2) of . subdivision (a) of Section 66001 of the Government Code, and the public improvement remains incomplete. vii. A description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or jfund will receive on the loan. Page 5 of 17 'I i • • viiia The amount of'refunds made pursuant to subdivision(e) of Section 66001 and any allocations pursuant to subdivision (f) of Section 66001. I�i6. Report Reviews. Pursuant to Government Code section 66006(b)(2), SPONSORS shall review the information contained in the report referenced in Section C.5 of this Agreement at the next regularly-scheduled public meeting not less than fifteen (15) days after this information is made available to the public. 7. Periodic Findin.f-,s. Pursuant to Government Code section 66001(d), after the fifth fiscal year following the first deposit of 2006 STMP revenues and every five (5) years thereafter, WCCTAC shall make all required findings with respect to that portion I� of the fee account or fund remaining unexpended, whether committed or uncommitted, held by the City of San Pablo on its behalf. Such findings shall be made in connection with the release of public information required by Government Code seition 66006(b) and Section C.5 of this Agreement. 8. Fee Adjustments. A provision shall be included in the fee resolutions or ordinances adopted by SPONSORS pursuant to this Agreement, requiring automatic annual fee increases or decreases, effective July 1 of each year after 2006, based on the percentage I� change in the Engineering News-Record Construction Cost Index for the Sar, Francisco Bay Area for the 12-month period ending with the June index of the same calendar year. 9. Exemptions. Developments shall be exempted from the 2006 STMP and the development fees pursuant thereto if(1) the development has obtained rights vested prior to the effective date of the applicable 2006 STMP fee ordinance or resolution, pursuant to Government Code section 66498.1 or(ii)has entered into an agreement with a SPONSOR that expressly excludes the assessment of additional fees. i� 10. Credits. A developer may receive credit against fees for the dedication of land for right-of- way and/or construction of improvements for specific 2006 STMP projects. where such right-of-way or construction is beyond that which would otherwise be 1 required for approval of the proposed development. The calculation of the amount of credit Iagainst fees for 2006 STMP dedications or improvements shall� be based upon a determination by SPONSOR that such credits are, in fact, exclusive of the dedications, setbacks, improvements, and/or traffic mitigation I� measures which are required by local ordinance, standards, or other practice. In addition, the credit shall be calculated based upon the actual cost of construction II Page6of17 of improvements or, in the case of land dedication, on an independent appraisal approved by the SPONSOR. D. LIST OF PROJECTS I� 1. Richmond Intermodal Station. .Public improvements mcludmg, but not limited to: the parking garage, staiion building, transit center, east side improvements, lighting and real-time transit information. 112. Interchanges on I-80 at San Pablo Dam Road and Central Avenue; and on Highway 4 at Willow Avenue. Upgrade and improve the interchange at 1-80/San Pablo Dam Road, including provisions for bicyclists and pedestrians; enhance operations and vehicular, bicycle, pedestrian safety in the vicinity of the interchange. Modify and realign the interchange and ramp at I-80/Central Avenue and/or other improvements to improve access to 1-80 and I-580 from Central Avenue. Relocate and1 realign ramps at Willow Avenue to meet current standards 'I for improved local access and freeway movements. !I 13. Caitol Corridor Improvements. Parking, station platform, signage and plazas, rail improvements, etcl., at the Hercules Passenger Rail Station and/or track improvements, drainage, fencing, safety improvements and/or other improvements along the Capitol Corridor line in West Contra Costa County. 4. Ferry Service to San Francisco from Richmond and/or Hercules/Rodeo. New ferry service utilizing high-speed vessels and funds for capital improvements such as terminals, landside improvements, parking, lighting, transit feeder service, signage, etc. 5. BART Access and/or Parking Improvements: Parking, aesthetic, and/or access improvements, station capacity improvements, sidewalks, lighting/restroom renovations, bicycle storage, expanded automatic fare collection equipment, etc. at the El Cerrito Plaza, El Cerrito Del Norte, and/or Richmond BART stations. 6. Bay Trail Gap Closure. Close gaps in the Bay Trail in West Contra Costa County, ' including, but not limited to the following: (1) the one-mile gap along the Richmond Parkway between Pennsylvania and Gertrude Avenues; (2) the 1 .8 mile gap north of Freethy Boulevard to Payne Drive in Richmond; (3) the two- mile gap from Payne Drive to Cypress Avenue in Richmond; (4)the one-mile gap from Pinole Shores to Railroad Avenue in Pinole; and (5) the 1.8 mile gap from Railroad Avenue to Parker Avenue in Hercules. 7. San Pablo Dam Road Improvements in Downtown El Sobrante. Traffic calming, additional signals,pedestrian improvements, turn lanes, etc. that are identified in the Downtown El Sobrante Transportation and Land Use Plan (and subsequent documents). I� JAI I J Page 7 of 17 �I I 8. San Pablo Avenue Corridor Improvements. Infrastructure improvements on San Pablo Avenue through West Contra Costa County within a half-mile radius of San Pablo Avenue in either direction and/or San Pablo Avenue SMART Corridor I improvements. 9. North Richmond Road Connection Proiect. Extend Seventh Street northward to connect to an eastward extension of Pittsburg Avenue in North Richmond. I10. Hercules Transit Cente'r. Relocate and expand the Hercules Transit Center on the east side of Highway 41 111. Del Norte Area Transit Oriented Development Project Public Improvements. Parking facilities; bicycle, pedestrian, and/or bus transit access improvements; signage; lighting; improvements to station access or station waiting areas; improvements required under the Americans with Disabilities Act; improvements to adjacent streets, strelet crossings, or signals; and/or Ohlone-Greenway improvements: E. I'FUNDING COMMITMENTS AND ELIGIBLE COSTS I I1. Use of Fees. I! Fee revenues shall be available for Project costs through completion of construction. Costs include,but are not limited to, environmental clearance, l conceptual planning and engineering, traffic studies, design, right-of-way acquisition, utility relocation, and costs of construction. Funding amounts are in j 2005 dollars and actual funding commitments will depend upon the 2006 STMP fee revenues collected by the SPONSORS. Eligible Project costs will be determined by WCCTAC based on the cost criteria listed above and other factors consistent with applicable law, in WCCTAC's sole discretion. Project costs will be reimbursed pursuant to procedures determined by WCCTAC. Projects will be funded in accordance with Project readiness and other factors as determined pursuant to and as reflected in a Strategic Plan to be prepared in accordance with Section F below. I I 2. STMP Projects and Funding. Il Project Name STMP Funding Richmond Intermodal Station $15,000,000 I-80 Interchanges at San Pablo Dam Road and $14,280,000 Central Avenue; Interchange at Highway 4/Willow Capitol Corridor Im rovements $13.25 5,000 . it Ferry Service from Richmond and/or Hercules/Rodeo $12,650,000 BART access and/or;parking improvements $25,330,000 j� Bay Trail Gap Closure $1,510,000 I l San Pablo Dam Road Improvements in Downtown El $1,900.000 j Il IliPage 8of17 I�I I ' � � I Sobrante it San Pablo Avenue Corridor Improvements $1,650,000 North Richmond Road Connection Project $4,000;000 �i Hercules Transit Center Relocation $1,650,000 Del Norte Area Transit Oriented Development $6,875,000 F. (PROJECT IMPLEMENTATION SCHEDULE (Subject to environmental clearance, right of way acquisition and dedication, utility relocation, and other factors (the timing of which may be beyond the control of IAUTHORITY, SPONSORS, and/or WCCTAC), and subject to the availability of II regional fee and other funding sources as may be required,the following implementation guidelines shall apply to projects in the 2006 STMP: 1. No later than nine months following the date of this Agreement, WCCTAC shall adopt a Strategic Plan that determines the full Project scope and description, prioritization, and implementation of the 2006 STMT Projects. 12. The Strategic Plan shall take into account the following: Project readiness; the availability of full funding, including funds from sources other'than STMP fees; the status of pre-construction activities (planning, design, engineering, environmental); right-of-way clearance; community support for the Project; Project need; etc. G. ADMINISTRATIVE OVERSIGHT AND COST RECOVERY 1. The following parties shall be entitled to recover the following costs and expenses: I I i. City of San Pablo. The City of San Pablo is entitled,to recovery of reasonable administrative costs and expenses actually incurred, not to exceed I% of the STMP fee revenues disbursed under this Agreement during each quarterly period, to provide 2006 STMP financial and accounting services, including but not limited to serving as the repository of the STMP fee revenues and other funds collected under this Agreement and preparation of quarterly reports with the amount of fee revenues collected and the distribution of fees to the Projects. ii. WCCTAC. WCCTAC is entitled to recovery of reasonable administrative costs and expenses actually incurred, not to exceed 2% of the STMP fees disbursed under this Agreement during each quarterly period to provide the 2006 STMP services relating to or incurred in the performance of the following duties. coordination, administration and oversight of Project expenditures; determination of the priority of fee disbursements; provision III of general management of the Projects; and preparation of the Strategic Plan for the 2006 STMP. SII ' Page 9 of 17 i Iii. Project Sponsors. For each Project over which a Project Sponsor has responsibility for administrative oversight, a Project Sponsor is entitled to recovery of reasonable administrative costs and expenses actually incurred, not to exceed 2% of the STMP fees disbursed under this Agreement during each quarterly period to provide the 2006 STMP i services relating to or incurred in the performance of the following duties: provision of Project oversight.and contract management. H. I(TERM The term of this Agreement shall commence on —" ' 2006 (the "Effective Date") and shall terminate on December 31, 2036, unless terminated earlier in accordance with the terms of this Agreement. I. I!TERMINATION This Agreement will remain in effect until the termination date stated in Section H. above, unless terminated earlier by written agreement of the Parties. However, in no event shall the Parties to this Agreement terminate this Agreement if such a termination �I would conflict with, cause a default under or otherwise violate the terms or conditions of any revenue bonds. J. I INDEMNIFICATION 1. AUTHORITY shall defend, indemnify, save and hold harmless WCCTAC; the cities of El Cerrito, Hercules,Pinole, Richmond and San Pablo; and the County of Contra Costa and their officers, agents and employees from any and all claims, costs and liability arising out of or in connection with any act or failure to act under this Agreement; or breach of any term of this Agreement, by AUTHORITY, except to the extent such claims, costs or liability arise from the negligence of WCCTAC, El Cerrito, Hercules, Pinole, Richmond, San Pablo, �I Contra Costa County or their officers, agents or employees. I2. WCCTAC shall defend, indemnify, save and hold harmless AUTHORITY; the I Cities of El Cerrito, Hercules,Pinole, Richmond and San Pablo; and the County of Contra Costa and their officers, agents and employees from any and all claims, costs and liability arising out of or in connection with an act or failure to act under this Agreement, or breach of any term of this Agreement, by WCCTAC, except to the extent such claims, costs or liability arise from the negligence of AUTHORITY, El CeiInito,Hercules, Pinole, Richmond, San Pablo, Contra Costa County or their officers, agents or employees. 3. El Cerrito shall defend, indemnify, save and hold harmless AUTHORITY: WCCTAC; the citiesiof Hercules, Pinole,Richmond and San Pablo; and the County of Contra Costa; and their officers, agents and employees from any and all claims, costs and liability arising out of or in connection with any act or failure to j� act under this Agreement, or breach of any term of this Agreement, by El Cerrito, it I except to the extent such claims, costs or liability arise from the negligence of �I Page 10 of 17 it i AUTHORITY, WCCTAC, Hercules,Pinole,.Richmond, San Pablo, Contra Costa County or their officers, agents or employees. 4. Hercules shall defend, indemnify, save and hold harmless AUTHORITY, WCCTAC; the cities of El Cerrito,Pinole, Richmond and San Pablo; and the County of Contra Costa and their officers, agents and employees from any and all claims, costs and liability arising out of or in connection with any act or failure to act under this Agreement, or breach of any term of this Agreement, by Hercules, except to the extent such claims, costs or liability arise from the negligence of AUTHORITY, WCCTAC, El Cerrito,Pinole, Richmond, San Pablo, Contra Costa County or their officers, agents or employees. 15. Pinole shall defend, indemnify, save and hold harmless AUTHORITY; WCCTAC; the cities of El Cerrito, Hercules, Richmond and San Pablo; and the County of Contra Costa and their officers, agents and.employees from any and all claims, costs and liability arising out of or in connection with any act or failure to act under this Agreement, or breach of any term of this Agreement, by Pinole, except to the extent such claims, costs or liability arise from the negligence of AUTHORITY, WCCTAC, El Cerrito, Hercules, Richmond, San Pablo, Contra Costa County or their officers, agents or employees. 116. Richmond shall defend, indemnify, save and hold harmless AUTHORITY; WCCTAC; the cities of El Cerrito,Hercules, Pinole and San Pablo; and the County of Contra Costa and their officers, agents and employees from any and all j claims, costs and liability arising out of or in connection with any act or failure to act under this Agreement, or breach of any term of this Agreement, by Richmond, except to the extent such claims, costs or liability arise from the negligence of AUTHORITY, WCCTAC, El Cerrito, Hercules, Pinole, San Pablo, Contra Costa County or their officers, agents or employees. I I 7. San Pablo shall defend, indemnify, save and hold harmless AUTHORITY; WCCTAC; the cities of El Cerrito, Hercules, Pinole and Richmond; and the County of Contra Costa and their officers, agents and employees from any and all claims, costs and liability arising out of or in connection with any act or failure to act under this Agreement, or breach of any term of this Agreement, by San Pablo, except to the extent such claims, costs or liability arise from the negligence of AUTHORITY, WCCTAC, El Cerrito, Hercules, Pinole, Richmond, Contra Costa County or their officer's, agents or employees. 8. Contra Costa County shall defend, indemnify, save and hold harmless .AUTHORITY; WCCTAC; the cities of El Cerrito, Hercules, Pinole, Richmond, I and San Pablo and their officers, agents or employees from any and all claims j costs and liability arising out of or in connection with any act or failure to act I, under this Agreement, or breach of any term of this Agreement, by Contra Costa �1 County, except to thel extent such claims, costs or liability arise from the tl negligence of AUTHORITY, WCCTAC, El Cerrito, Hercules, Pinole, Richmond, San Pablo, or their officers, agents or employees. I�I �I I Page 11 of 17 - I I � • 19. WCCTAC agrees to the,fullest extent legally permitted to defend, indemnify and hold harmless the Parties from any liability, loss, costs, and claims related to the adoption or implementation of the 2006 STMP.. WCCTAC will pay any and all 1 legal costs incurred by any SPONSOR in any legal proceeding brought to collect a fee, where the defense of such lawsuit raises the issue of the constitutionality or legality of the fee. K. PRIMACY OF THE DOCUMENTS If a dispute arises, the terms o(this Agreement shall take precedence over the WCCTAC Joint Exercise of Powers Agreement ("JEPA") and/or the model Ordinance Establishing ;the West Contra Costa Subregilonal Transportation Mitigation Program ("Ordinance"). L. 11ALTERNATIVE DISPUTE RESOLUTION . In General. This Paragraph L. establishes the exclusive process by which disputes between or among the Parties to this Agreement concerning or relating to this- j Agreement shall be resolved. The dispute resolution process established herein shall apply to disputes ielated to the interpretation or enforcement of, or compliance with, the terms and provisions of this Agreement. Disputes that are not alleged to relate to jthe interpretation of, or compliance with, this Agreement are not subject to this dispute resolution process. 12. Informal Conferral. 111a dispute arises as described above in Paragraph L.1 ., the parties to the dispute (the "Disputing Parties") will first attempt to resolve it through informal discussions, which may include designated'representatives of the staff of WCCTAC AUTHORITY and SPONSORS, at their discretion. Disputing Parties will 'advise the other Parties of the existence of a dispute and coordinate the date, time and location of informal conferral. 3. Mediation. In the event a dispute cannot be resolved through informal conferral within twenty-one (2 1) calendar days, the aggrieved Disputing Party, acting 1 through its governing body, shall give written notice to.all other Parties to this Agreement, setting forth the nature of and basis for the dispute and facts demonstrating that such Disputing Party is materially and adversely affected thereby. The Disputing Parties, acting through their designated representatives. including counsel, shall endeavor to settle the dispute by mediation. The Disputing Parties shall, select a neutral third party with expertise in land use matters to mediate the dispute. .The other Parties may, but are not required to, participate in the mediation. �I 4. Judicial Review. The dispute resolution process described above.shall be undertaken in good faith and exhausted prior to resort to judicial review; provided, however, that by agreeing to this dispute resolution process, no Party hereby loses or waives its right to sue under any applicable statute of limitations it or loses or waives its right to assert the operation of any applicable statute of limitations as an affirmative defense. In the event that an applicable statute of Page 12 of 17 I� limitations would run during the pendency of the dispute resolution process described above, the Disputing Parties shall agree in writing to toll such statute of limitations for such period as may reasonably be necessary to complete the dispute resolution process, but in no event shall such statute of limitations be tolled for more than ninety(90) calendar days. I 5. Conduct of Judicial Re-Lew Should any Party to this Agreement ultimately seek judicial review of a dispute concerning or relating to the implementation, interpretation or enforciement of, or compliance with, the terms and provisions of this Agreement, all Parties will submit to the jurisdiction of a court of competent !I - jurisdiction; provided, however, that the Parties shall cooperate in seeking the appointment of a neutral Judge as defined in California Code of Civil Procedure section 394 to sit in Contra Costa County Superior Court, to preside over any such dispute. 116. Equitable Relief. Because the amount of damages in the event of a breach of this Agreement may be difficult or impossible to determine, the obligations of the Parties to this Agreement shall be enforceable by specific performance or other equitable relief, in addition to any other available remedy. I I M. NOTICES II Any notices which may be required under this Agreement shall be in writing, shall be effective upon receipt, and shall be given by personal service, by certified 1 or registered mail, or by U.S. mail, to the City Clerks of the cities of El Cerrito, Hercules, Pinole, Richmond, and San Pablo; to the Board Clerk for the County of Contra Costa; and to the Executive Director of the AUTHORITY, and to the individuals and addresses set forth below, or to such other addresses which may be specified in writing to the Parties. To WCCTAC: To City of El Cerrito: 13831 San Pablo Avenue 10890 San Pablo Avenue San Pablo, CA 94806 El Cerrito, CA 94530 Attn: Managing Director Attn: City Clerk . 11 To City of Hercules: To City of Pinole: 111 Civic Drive �. 2131 Pear Street Hercules, CA 94574 Pinole, CA 94564 Attn: City Clerk Attn: City Clerk i1 To City of Richmond: To City of San Pablo: 1401 Marina Way South 13831 San Pablo Avenue Richmond, CA 94804 San Pablo, CA 94806 Attn: City Clerk Attn: City Clerk- Page lerkPage 13 of 17 li To County of Contra Costa: To the AUTHORITY: 651 Pine Street, lst Floor 3478 Buskirk Avenue, Suite 100 III Martinez, CA 945531 Pleasant Hill, CA 94523 Attn: Clerk of the Board of Supervisors Attn: Executive Director 11 � N. I!ADDITIONAL ACTS AND DOCUMENTS iEach Party agrees to do all such things and take all such actions, and to make, execute and deliver such other documents and instruments, as shall be reasonably requested to (carry out the provisions, intent, and purpose of the Agreement. �I O. INTEGRATION Except with respect to matters provided for in the JEPA and/or the Ordinance and subject .to the primacy of this Agreement as provided in Paragraph K hereto, this Agreement (represents the entire Agreement of the parties with respect to the subject matter hereof. No representation, warranties)inducements, or oral agreements have been made by any I� of the parties except as expresIsly set forth herein, or in other contemporaneous written agreements. Ii , P. III AMENDMENT I I This Agreement may not be changed,modified, or rescinded except in a written instrument signed by all of the Parties. Any attempt at oral modification of this 1 Agreement shall be void and of no effect. Q. INDEPENDENT AGENCIES 1. None of the agents or employees of the City of San Pablo shall be considered agents or employees of the AUTHORITY, or the other SPONSORS. 2. None of the other SPONSORS' agents or employees shall be considered agents or employees of the City,of San Pablo. 3. None of the AUTHORITY's agents or employees shall be considered agents or employees of the City of San Pablo. �I R. ASSIGNMENT I II The Agreement, and the rights, duties, and obligations of a Party hereunder, may not be assigned, transferred, hypothlecated, or pledged by any Party without the express written I j consent of the other parties. III �I I I 'I I III Page 14 of 17 11 I� it S. 11BINDING ON SUCCESSORS, ETC. IlThe Agreement shall be binding upon the successor(s), assignee(s), or transferee(s) of the AUTHORITY, the SPONSORS, or WCCTAC as the case may be. This provision shall. not be construed as an authorization to assign,transfer,hypothecate, or pledge this Agreement other than as provided above. T. j SEVERABILITY Should any part of this Agreement be determined to be unenforceable, invalid, or beyond the authority of any Party to enter into or carry out, such determination shall not affect the validity of the remainder of this Agreement which shall continue in full force and effect; provided that, the remainder of this Agreement can, absent the excised portion, be reasonably interpreted to give effect to the intentions of the parties. U. jHEADINGS; RECITALS jThe headings of sections, paragraphs and subparagraphs of this Agreement are included for convenience only and shall not be deemed to constitute part of this Agreement or to affect its construction. The recitals are intended to be, and shall be deemed to constitute, part of this Agreement. V. �I COUNTERPARTS I� This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement. IN WITNESS WHEREOF, the parties have caused this Agreement to be duly executed and attested by their respective officers, duly authorized so to act, as of the date set forth in the first paragraph of this Agreement. City of Pinole I City of San Pablo Mayor I Mayor I, ATTEST: ATTEST: City (Clerk City Clerk APP,ROVED AS TO FORM: APPROVED AS TO FORM: I�I City lAttomey City Attorney r IIS i r�I Page 15 of 17 �I li I I - Ilj County"Iof Contra Costa West Contra Costa Transportation li Advisory Committee (::By: III Chair, B r o Supervisors Chair •ZG�G ATTES : John Cullen, Clerk of the Board of ATTEST: Supervisors and County Administrators BY: I� Secretary Deputy A,PPRO v ED AS TO FORM: APPROVED AS TO FORM: Silvano; B. Marchesi County Counsel Legal Counsel By: ill Deputy Contra Costa Transportation Authority City of El Cerrito IIj I , I Chair� Mayor . ATTEST: Executive Director I II I Secretary APPROVED AS TO FORM: APPROVED AS TO FORM: Authority Legal Counsel j City Attorney City olf Hercules City of Richmond II Mayor i i Mayor ATTEST: ATTEST: City;Clerk City Clerk II , II it Ij I I Page 16 of 17 �I I Ili .... ... . . . .. APPROVED AS TO FORM: APPROVED AS TO FORM: II i City Attorney City Attorney i i 828055v9;1812.003 �i I I I; j li d i i li i� 1 I Page 17 of 17 .I I .Ij iI = - L I I I I Ii 2005 Update of the Subregional Transportation Mitigation II Program (STMP) j I I I For the West Contra Costa .Transportation II Advisory Committee (WCCTAC) II I I I II May 5, 2006 I I I I I Prepared by: �I TJKM Transportation Consultants 5960 Inglewood Drive, Suite 100 Pleasanton CA 94588-8535 Tel: 925.463.0611 II Fax: 925.463.3690 Ij I I I I Ij �I I 2005;STMP Update for WCCTAC Page 1 of 20 TJKM Transportation Consultants May 5, 2006 I I I j 1 j1 TABLE OF CONTENTS I CHAPTER 1. INTRODUCTION AND SUMMARY......................................................................................4 INTRODUCTION..................................................................................................................................................4 .............. SUMMARY.......................:...:. .......................................................................:......................................4 Chapter 2—Expected Growth In Households,Employment and Peak Hour Trips.................................. 4 i Chapter 3—Project List and Priori'ties......................................................................................................... 5 Chapter 4—STMP Previous Collections and Potential Yield From 2005 Update..................................... 5 Chapter 5—Program.Costs and Fee Calculation........................................................................................ 5 Chapter6—Nexus Findings.........1....................................................:.......................................................... 5 I CHAPTER 2. EXPECTED GROWTH IN HOUSEHOLDS,EMPLOMENT AND PEAK HOUR TRIPS IN'THE WCCTAC AREA....................................................................................:..............................................7 HOUSEHOLDGROWTH....................................................................................................................................... 7 EMPLOYMENTGROWTH..................... ............................................................................................................... 7 TRIPGENERATION .............................!............................................................................................................... 8 li CHAPTER 3. SELECTION AND COST OF PROJECTS...........................................................................10 I PROJECTDESCRIPTIONS................................................................................................................................... 10 1. Richmond Intermodal Station!......................................:...................................................................... 10 2. Interchanges on I-80 at San Pablo Dam Road and Central Avenue and on Highway 4 at Willow... /l 3. Capitol Corridor.......................... ......................................................................................................... 12 III 4. Ferry Service to San Francisco from Richmond and/or Hercules/Rodeo.......................................... l 2 5. BART Access and/or Parking Improvements..................................................................................... 12 1 6. Bay Trail.Gap Closure........................................................................................................................... 13 7. San Pablo Dam Road.Improvements in Downtown El Sobrante........................................................ 13 8. San Pablo Avenue Crridor Inil rovements......................................................................................... 13 9. North Richmond Road Connection Project......................................................................................... 14 10. Hercules Transit Center....... ....................................................................................................... j 11.Del Norte Area Transit Oriented Development project(public improvements)............................:.... 15 CHAPTER 4. STMP PREVIOUS COLLECTIONS AND 2005 UPDATE POTENTIAL FEE REVENUES........................................!.............................................................................................................. 16 COLLECTIONSTO DATE................................................................................................................................... 16 iPOTENTIAL FEE REVENUES FROM 2005 UPDATE............................................................................................. 16 CHAPTER 5. PROGRAM COSTS AND FEE CALCULATION................................................................17 II(UPDATED COST PER TRIP ESTIMATE]................................................................................................................ 17 OTHER FACTORS IN STMP UPDATE.1............................................................................................................... 18 11 1 CHAPTER 6. NEXUS FINDINGS..!............................................................................................................... 19 III CHAPTER 7. STUDY PARTICIPANTS.......................................................................................................20 TJKM TRANSPORTATION CONSULTANTS PERSONNEL................................................:.....................................20 �(•.THE REED GROUP............................ ............................................................................................................... 20 I PERSONS/AGENCIES CONSULTED/WCCTAC --TAC MEMBERS..................................................................... 20 .. 'II �ii it I i � I I I 2005 STMP Update for WCC.TAC Page 2 of 20 TJKM Transportation Consultants May 5, 2006 II • I.I. II , LIST OF TABLES TABLE I:HOUSEHOLD GROWTH IN WESTI CONTRA COSTA COUNTY-2005 TO 2030............................................. 7 TABLE II:EMPLOYMENT GROWTH IN WEST CONTRA COSTA COUNTY-2005 TO 2030......................................... 8 TABLE III:NEW A.M.PEAK HOUR TRIPSI IN WEST CONTRA COSTA COUNTY-2005 TO 2030...............................9 TABLE IV:STMP PROJECTS AND AVAILABLE FUNDiNG...................................................................................... 10 TABLE V:DISTRIBUTION OF FUNDS RECEIVED TO DATE...................................................................................... 16 TABLE VI:2005 COST PER TRIP ESTIMATE......:................................................................................................... 17 TABLE VII:2005 RECOMMENDED STMP RATES AND FEES AND FEES................................................................. IS I I I I I I I I :I I I� I I I I - I I I I Ij II I I I I I I I I II I I I I I I Ii it I I 2005 STMP Update for WCCTAC Page 3 of 20 TJKM Transportation Consultants May 5, 2006 II I I CHAPTER 1. INTRODUCTION AND SUMMARY Introduction This analysis provides the technical basis for establishing the required nexus between-anticipated future development in West Contra Costa County and the need for certain local and regional transportation facilities. The specific tasks performed in preparing this analysis and their results are summarized below. The West Contra Costa Transportation Advisory Committee's (WCCTAC) Suliregional Transportation Mitigation Program(STMP) was established in 1997. This is the first update of the STMP program to ensure that the various aspects of the program reflect current conditions. For the 2005 STMT update,WCCTAC retained a team led by TJKM Transportation Consultants to update technical aspelcts of.the program. I The 2005 STMP update includes anjupdated project list with cost estimates for all improvement projects to be potentially funded by STMP fees. This report presents the results of the efforts of the project team to update the WCCTAC STMP. This update effort involved the major tasks described below. 1. The amount of new development that will occur in the WCCTAC area between 2005 and j 2030 was determined. 2. A new estimate was prepared of the trip generation that will result from development of the �. expected future land uses within the WCCTAC area. Trip generation rates from the Institute of Transportation Engineers (ITE)publication Trip Generation were utilized. 3. Future deficiencies on the transportation network were determined based on findings of the staff of WCCTAC, its member agencies, and the consultant team. 4. A list of projects needed to accommodate future traffic was determined. 5. Updated traffic improvement project cost estimates were prepared which reflect the latest concept designs for the projlects and the latest completion status of the various projects. 6. An updated cost per trip wis calculated along with the corresponding updated STMP j schedule of fees. 7. A reasonable relationship between the impacts of the new growth and the fees proposed in the STMP was ascertained. State law requires that there must be a roughly proportional benefit from the proposed fees to t e projects supplying the funds. Summary Chapter 2—Expected Growth In Households, Employment and Peak Hour Trips According to ABAG's Projections 2003,the overall estimated growth in the WCCTAC area is estimated at 17,910 households(a 20.3 percent increase in 25 years) and 28,810 jobs (an increase of over 35 percent). Using standard available trip generation rates,the total increase in peak hour trips in the a.m. period is expected to be 28,571. Richmond and Hercules account for over 75 percent of the new trips. JI 2005 STMP Update for WCCTAC Page 4 of 20 TJKM Transportation Consultants May 5, 2006 I� • II 1i -.. .._... ..._-._ Chapter 3--Project List-and Prioritii s - - - -- — - - They recommended list of new transportation improvements to serve the WCCTAC area was developed by the WCCTAC Technical Advisory Committee and the consultants. The WCCTAC Board reviewed a preliminary list of projects in August 2004. The recommend list of new projects is shown below. Costs and details of the individual projects are described in Chapter 3 of this report. 111. Richmond Intermodal Station 2. Interchanges on I-80 at San Pablo Dam Road and at Central and on Highway 4 at Willow 1 Avenue 113. Capitol Corridor capital and/or operational improvements 4.. Ferry service from Richmond and/or Hercules/Rodeo .115. BART access and/or parking improvements 116. Bay Trail Gap Closure 17. San Pablo Dam Road improvements in downtown El Sobrante 1 j 8. San Pablo Avenue Corridor Improvements 9. N. Richmond road connection project 10. Hercules Transit Center relocation 1 11. Del Norte Area Transit Oriented Development project(public improvements) The 11 projects have a total cost of$371 million. Of this amount, approximately$273 million is anticipated to be funded by other sources or does not satisfy nexus requirements, leaving $98 million for funding by the updated 2005 STMP.. 1� Chapter 4 STMP Previous Collections and Potential Yield From 2005 Update The existing STMP was adopted in 1997. A total of near $2.942 million has been collected to date, or about$39,200 per month. Most of the funds collected have been spent on the Richmond Intermodal project and the Highway 4 West Project. The 1997 Nexus Analysis indicated that$24.5 million could be Icollected for the next 13 years if the maximum fee amounts were adopted,but WCCTAC adopted a fee that was lower by approximately 80 percent so that$5.1 million was the expected yield. The adopted rates amount to about$440 per peak hour trip, instead of the $2,100 indicated by the nexus study. If these same rates were applied to the expected growth in the next 25 years, the yield would be $12.6 million with the lower rate's and$60.0 million with the full rates. i1 I Chapter 5-Program Costs and Fee Calculation' Iii jupdating the cost per trip, the total costs of all proposed projects were determined and the outside funding and non-eligible costs were subtracted to yield a total amount to be included in the program. The program amount is $101,043,000, and when divided by the amount of peak hour trips generated bye the new development, 28,810,the 2005 STMP cost per trip is.$3,507 if all projects were to be fully funded. This figure is about 67 percent more than the $2,100 cost per trip determined in 1997. A rate schedule is recommended to fund this full amount. However,WCCTAC may choose to provide only partial funding of the project list. In 1997,the final fees were set to cover about 20 percent of the recommended program. II Chapter 6-Nexus Findings California legislation requires that charges on new developments bear a reasonable relationship to the needs created by,and the benefits accruing to that development. California courts have long used that reasonableness standard or nexus to test to evaluate the constitutionality of exactions, including li 11 I 2005 STMP Update for WCCTAC. Page 5 of 20 TJKM Transportation Consultants May.5, 2006 li - —deaelopment fees-Based-on the-analysis included iri the body-of this report,-it-can be concluded-that- - - the future development and the need for their associated improvements meet or exceed the basic requirements set forth in Government Code sections beginning with 66000 to govern development fees. � I� Of the$371 million worth of neededl improvements identified in this analysis, over$121 million in outside funding sources have been identified. These outside sources primarily include Contra Costa County Measure J, which is the extension of the one-half percent sales tax levied for transportation improvements. Measure J,which is intended to fund improvements which will correct both existing and future deficiencies,is a partner to the STMP extension, which by law must only fund future transportation deficiencies associated with new development. Measure J was approved by Contra Costa County voters in the general election on November 2,2004. Of the total deficiencies identified inithe 11 proposed'STMP projects, only about 27 percent of the funding comes from the STMP. Over $150 million worth of costs of the 11 projects fails to satisfy the nexus requirements and was not i11 ncluded in the program. I� The methodology of this report ensured that only the portion of the projects included in the STMP project list is necessitated by the growth in traffic between 2005 conditions and 2030 conditions. Thus,there is a reasonable relationship between the proposed use of the STMP and the proposed land use development projects on which the fee will be imposed. In the same manner there is a reasonable relationship between the need for facilities included in the STMP and the proposed land use development projects. I I I� I� I I Ij I I Ij I I II I I I� I II �I I I� I I 2.005 STMP Update for WCCTAC I Page 6 of 20 TIJKM Transportation Consultants May 5, 2006 I� . I �I CHAPTER 2. EXPECTED GROWTH IN HOUSEHOLDS,EMPLOMENT AND PEAK HOUR TRIPS IN THE WCCTAC AREA i I I Household Growth I ABAG's Projections 2003 was used to determine the residential and employment growth in the West County area between 2005 and 2030 The growth in households for the WCCTAC area is shown in Table I. Tl el overall residential growth for the area is estimated at 17,910 households,representing a 20.3 percent increase for the 25 year period. Richmond is projected to have about 61 percent of the residential growth, and Hercules is anticipated to have nearly 19 percent of the growth. Hercules will be the fastest growing area,with a 50 percent increase in households in the 25-year period. I I TABLE I:HOUSEHOLD GROWTH IN WEST CONTRA COSTA COUNTY—2005 TO 2030 I II � Households. 2005 I 2030 Growth Share of Rate of Growth % Growth EI Cerrito 13,160 13,650 490 2.7 3.7 Hercules 6,860 j 10,270 3,410 19.0 49.7 Pinole 10,700 .I 12,500 1,800 10.1 16.8 Richmond 43,640 1 54,590 10,950 61.1 25.1 Rodeo-Crockett 4,520 4,680 160 0.9 13.3 San Pablo 9,170 j 10,270 1 1,100 6.2 3.5 I.I Totals 88,050 I 105,960 1 17,910 100.0 20.3 Note: Forecasts are for each city's Sphere of Influence(SOI)except for the Rodeo-Crockett unincorporated area. Kensington is included in the EI Cerrito SOI,Montalvin Manor and Tara Hills are in the Pinole SOI, N. Richmond and EI Sobrante are in the Richmond SOI,and Rollingwood is in the San Pablo SOI. I Source: ABAG Projections 2003 II Employment Growth Employment is expected to grow more rapidly than residential development. A growth of over 35 percent is forecast by ABAG for the WCCTAC area,representing an actual job growth of nearly 291,000 positions. Richmond will account for 57 percent of the job growth, with Hercules accounting for about 18 percent. Hercules job growth rates are nearly 150 percent,while El Cerrito,Pinole and Richmond are expected to register growth of around 30 percent. The Crockett-Rodeo unincorporated area is expected to grow by nearly 60 percent. Table II summarizes the anticipated employment growth in the WCCTAC area. �I II �I II �I �I 1 I I 2005 STMP Update for WCCTAC I Page 7 of 20 TJKM Transportation Consultants May 5. 2006 II , Ii I II i TABLE II:EMPLOYMENT GROWTH IN WEST CONTRA COSTA COUNTY—2005 TO 2030 II Employment 2005 I 2030 Growth Share of Rate of Growth % Growth EI Cerrito 8,170 10,300 2,130 7.4 26.1 Hercules 3,430 8,490 5,060 17.6 147.5 II Pinole 6,110 7,920 1,810 6.3 29.6 II Richmond 52,390 68,750 16,360 56.8 31.2 Rodeo-Crockett 3,590 5,730 2,140 7.4 59.6 San Pablo 8,460 9,770 1,310 4.5 15.5 Totals 82,150 110,960 1 28,810 100.0 1 35.1 Note: Forecasts are for each city's Sphere of Influence except for the Rodeo-Crockett unincorporated area. See Table I note for details. Source: ABAG Projections 2003 II The anticipated growth in households and employment in the WCCTAC area will result in new peak hour trips on the transportation network. These are described in the next section. Trip Generation . Inl order to determine.the amount oftraffic that is associated with the expected new development in the west county area,TJKM applied trip generation rates to the components of the new growth. I As in the original STMP, the 2005 update relies on the a.m. peak hour commute period as the primary analysis period. The a.m. peak hour,period is used in order to not overburden the application of the tralffic fees on retail development. While residential uses.and most employment based land uses such as loffices and business parks have similar a.m. and p.m. peak hour trip rates,retail uses typically are three to four times as heavy in the p.m. period as the a.m.period. Use of the a.m.rates for all uses tends to spread the fee application more uniformly. As noted above,there is expected to be a total of 17,910 new households in the WCCTAC area over a 25,-year period. Since some of these households will be in multiple family dwelling units and some will be in single-family dwelling units, TJKM assumed an average of the trip generation rates for the two residential land use types. The average a.m. trip rate of 0.63 trips per dwelling unit was applied tol the total number of households to yield a total of 11,285 new residential-based trips. I I � For non-residential uses, a trip rate that is based on numbers of employees, and is representative of various uses such as offices,business parks,manufacturing and retail uses in the a.m. period, was selected. The rate selected was 0.60 trips per employee. When that number is applied to the 28,810 growth in employment over the 25 1 year period, the number of new a.m.peak hour trips generated by these uses totals 17,286 trips. These figures are shown in Table III. The table shows the total of the new a.m. trips from both residential and non-residential growth, 28,571,and also shows the amount of the new trips that are allocated to each of the WCCTAC agencies. Richmond growth is expected to generate about 59 percent of the new trips, Hercules about 18 percent and the other areas generally between about 5 and 10 percent. The contributions of other agencies are shown in the table below. II 2005 STMP Update for.WCCTACI Page 8 of 20 TJKM Transportation Consultants May 5, 2006 II II II . II - -- — - ---i----T-ABI,E III:NEw-A:M:PEAK HOOUR-TRIPS-IN WEST-C-ONTRA C-OSTA COUNTY-2005-T0 2030 -- - - - I I New Peak Hour Trips Share of From From Total Total Households' Em to menti Tri s j EI Cerrito 1309 1,278 1,587 5.6 . Hercules 2,149 3,036 5,185 18.1 11 Pinole 1,134 1,086 2,220 7.8 j I Richmond 6,899 9,816 16,715 58.5 j Rodeo-Crockett 101 1,284 1,385 4.8 i San Pablo 693 786 1,479 5.2 11 Totals 11,285 17,286 28,571 100.0 Source:TAM . Growth in households from Table 1 multiplied by 0.63,the average a.m.peak hour trip rate for single-family and multi-family dwelling units. The Institute of Transportation Engineers Trip Generation,2003 Edition,is the source of this information. 2Growth in employment from Table 2 multiplied by 0.60,a representative a.m.peak hour trip rate for employment uses. I The amount of new trips is used in the calculation of the 2005 STMP update cost per a.m. peak hour trip, as described in subsequent chapters of this report. Ii II II • li I� li I I I ;I I I I jl ;I i • II II li jl 'l l I I I I II •I i 2005 STMP Update for WCCTAC Page 9 of 20 TJKM Transportation Consultants May 5, 2006 I ii I I � I I I.I. J CHAPTER 3. SELECTION AND COST OF PROJECTS II The recommended list of projects to be included in the updated STMP is shown in Table N below. The' projects are described in greater detail in the remaining portions of this chapter.. I� TABLE IV:STMP I ROJECTS'AND AVAILABLE FUNDING II Project Tital Cost Measure J Other Unfunded RecommendedFunds Amount STMP 1.Richmond Intermodal station $36,000,000 $21,000,000 $15,000,000 $15,000,000 2.Interchanges on 1-80 at San Pablo Dam Road and at Central and on Highway 4 at 46,200,000 30,000,000 16,200,000 14,280,000 Willow Avenue. 3.Capital Corridor j Improvements 48,200,000 7,500,000 3,000,000 37,700,000 13,255,000 4.Ferry service from Richmond 91,000,000 45,000,000 46,000,000 12,650,000 II and/or Hercules/Rodeo 5.BART access and/or parking 92,100,000 15,000,000 77,100,000 25,330,000 improvements I I 6.Bay Trail Gap Closure 5,490,000 348,000 5,142,000 1,510,000 Ij 7.San Pablo Dam Road improvements in downtown EI 6,900,000 6,900,000 1,900,000 Sobrante 8.San Pablo Avenue Corridor 16,000,000 6,000,000 1,650,000 Improvements 9 N.Richmond road connection project 7,950,000 7,950,000 4,000,000 1 10.Hercules Transit Center 6,000,000 6,000,000 1,650,000 relocation 11.Del Norte Area TOD 125,000,000 25,000,000 6,875,000 STMP Totals $370,840,000 $97,500,000 $24,348,000 $248,992,000 $98,100,000 II Project Descriptions I I I,.I Richmond Intermodal Station I1 The Richmond Intermodal Station/Transit Village is located in downtown Richmond. Other public improvements (e.g. the center platform)have already been completed using state/federal/local funds (approximately $22,000,000). Thei transit village is under construction and the housing on the west slide is more than halfway complete. Funding is needed to complete the following public it �I II 2005 STMP Update for WCCTAC Page 10 of 20 TJKM Transportation Consultants May 5, 2006 I I I �I II -- - —improvements:-parking garage;station-building,the-transit center,-and-public-improvements-on-the--- — - east!side of the station. II � Cost: $36,000,000 Other Potential Funding Source(s): Private developer contributions, state/federal transportation funds and'Measure J. .li Project Nexus Discussion: The total cost of this project is $36 million,of which approximately$21 million is funded by various sources Although in the WCCTAC area only 27.5 percent of future traffic (see Chapter 6 for a detailed finding) is based on 25-year growth, in this case the project was previously justified(in 1997)based mainly on future deficiencies. However, only an estimated 40 percent of the project is justified by virtue of serving transportation demands of future growth. Thus, $1S million of the total cost of$36 million is included in the STMP.. II STMP Funding: $15,000,000 jI I 2. Interchanges on 1-80 at San Pablo Dani Road and Central Avenue and on Highway 4 at Willow I4/San Pablo Dam Road-Upgr�de and improve the interchange including provisions for bicyclists and pedestrians. The project will enhance operations and vehicular,bicycle,pedestrian safety in the vicinity of the interchange. II Cost: $16.7 million 140/Central Avenue-Modify and realign the interchange and ramp at Central Avenue. II Cost: $22.5 million I I I-80/SR4 Interchange at Willow Avenue-Relocate and realign ramps at Willow Avenue to meet current standards for improved local access and freeway movements. it Cost: $3.0 million to $7.0 million II Potential funding source(s): Measure J($30 million); City of Hercules Redevelopment Agency; private developer contributions; state/federal transportation funds. Pr�olect Nexus Discussion: Improvements to the three interchanges have an estimated total cost of $46,200,000. However,two of the I interchanges-the I-80 interchanges with San Pablo Dam Road and with Central Avenue-are currently deficient and only 27.5 percent(25-year traffic growth Within the WCCTAC area) of theirl improvement costs can be assigned to the STMP. On the other hand, the need for the Willow Avenue interchangeimprovements is based in large part on future growth in the Hercules area. In this case, 50 percent of the costs are assigned to the STMP. The breakdown of the $14.28 million SITMP assignment is$10.78 million for the two I-80 interchanges and $3.5 million for the Willow Avenue interchange. II STMP Funding: $14,280,000 l i 2005 STMP Update for WCCTAC i Page 1 1 of 20 TJKM Transportation Consultants May 5, 2006 II —" 3:1apitol.:Corridor — — — — - -- - I� Hercules Passenger Rail Station—Hercules passenger rail station (including parking, station platform, signage and plazas,rail improvements, etc.). Capital improvements along the corridor in West Contra Costa(track improvements, drainage, fencing, safety improvements, etc.) Coisit: $28.2 million for Hercules passenger rail station and $20 million for capital improvements. Potential Funding Sources: Measure J($7.5 million for the station); $3 million TCRP funds(station),- state/federal station);state/federal transportation funds. Project Nexus Discussion: This project is among those whose justification is related to existing conditions and deficiencies as well a�needs caused by future growth. Accordingly, 25-year traffic growth increase within the WCCTAC area,27.5,percent,has been applied to the total project cost of $48.2 million to result in a STMP allocation of$13.3 million. ,I STMP Funding: $13,255,000 II I 4.'1 Ferry Service to Say: Franciscofrom Richmond and/or Hercules/Rodeo New ferry service to San Francisco from Richmond and/or Hercules/Rodeo utilizing high-speed vessels. Funds will be used for capital improvements such as vehicles, landside improvements, parking lighting, transit feeder service, signage, etc. Both ferry services will be in close proximity to existing and future residential and commercial projects on West County's shorelines. Cost: $23 million for Richmond (vessels -$12 million; terminal - $11 million); $23 million for Hercules/Rodeo(vessels - $12 million; terminal -$11 million). Total -$46 million. Other Potential Funding Sources: Measure J($45 million for operations); $1 bridge toll; state/federal transportation funds; fare box. Project Nexus Discussion: This project is among those whose justification is related to existing conditions and deficiencies as well as needs caused by future growth. It is assumed that a significant portion of future fent'ridership will come from existing travelers. Accordingly, 25-year traffic growth increase within the WCCTAC area,27.5 percent,has been applied to the total project cost of $46 million to result in a STMP allocation of$12.65 million. STMP Funding: $12,650,000 S:I I BART Access and/or Parking Improvements As a component of BART's Smart Growth Program, funds would be used for parking, aesthetic and/or access improvements, station capacity improvements, sidewalks, lighting/restroom renovations,bicycle storage, expanded automatic fare collection equipment, etc. in the West County area(El Cerrito Plaza, El Cerrito Del Norte, and/or Richmond). ,II Cost: $92.1 million for the West County area. 'II Other Potential Funding Sources: Measure J($15 million); state/federal transportation funds. I I ;i i 2005 STMP Update for WCCTAC 1 Page 12 of 20 TJKM Transportation Consultants I May 5, 2006 II i I II I I --Project Nexus Discussion:-This project is among those whose justification is-related-to-existing — -- — - conditions and deficiencies as well as1 needs caused by future growth. Accordingly,.25-year traffic growth increase within the WCCTAC area, 27.5 percent,has been applied to the toal WCCTAC area project cost of$92.1 million to result in a STMP allocation of$25.33 million. �i STMP Funding: $25,330,000 i1 I I 6. IBay Trail Gap Closure I I Close gaps in the Bay Trail in West Contra Costa County, including,but not limited to the following: (1)the one-mile gap along the Richmond Parkway between Pennsylvania and Gertrude Avenues; (2) the 11.8 mile gap north of Freethy to Payne Drive in Richmond; (3)the two-mile gap from Payne Drive to Cypress Avenue in Richmond; (4) the one-mile gap from Pinole.Shores to Railroad Avenue in Pinole; and (5)the 1.8 mile gap from Railroad Avenue to Parker Avenue in Hercules. II Cost: $5.49 million ,I Oilier Potential Funding Sources: EBRPD sources,private developers,other(to be determined). I I � Project Nexus Discussion: This prejIect is among those whose justification is related to existing conditions and deficiencies as well as needs caused by future growth. Accordingly, 25-year traffic growth increase within the WCCTAC area, 27.5 percent,has been applied to the total WCCTAC area pr ject cost of$5.49.million to result in a STMP allocation of$1.51 million. ' I STMP Funding: $1,510,000 II I I 7.11 San Pablo Dam Road Improvements in Downtown El Sobrante Revitalization of the downtown bus' ess district in El Sobrante including traffic calming, additional _signals,pedestrian improvements, turn lanes, etc. that are identified in the Downtown El Sobrante Transportation and Land Use Plan(and subsequent documents). Cost: $6.9 million �I Poiential funding source(s): Measure J, County funds, other state.and federal transportation funds. I I Project Nexus Discussion: This project is among those whose justification is related to existing conditions and deficiencies as well as needs caused by future growth. Accordingly, 25-year traffic growth increase within the WCCTAC area, 27.5 percent,has been applied to the total WCCTAC area project cost of$6.9 million to result in a STMP allocation of$1.9 million. II I STMP Funding: $1,900,000 I I 81 Say:Pablo Avenue Corridor Improvements !I Transportation for Livable Communities infrastructure improvements on San Pablo Avenue through Wrest Contra Costa County and within a half-mile walking distance of San Pablo Avenue in either �I I it II 2005 STMP Update for WCCTAC Page 13 of 20 TJKM Transportation Consultants May 5, 2006 �I II • iI - — — —direction.—Also includes-improvements-as-part of the-Sari Pablo Avenue-SMART Corridor project - – thatiis.currently underway in Alameda and Contra Costa Counties on San Pablo Avenue. Cost: $6 million II Potential funding source(s): Measure J,Transportation for Livable Communities, state and federal transportation funds. Project Nexus Discussion: This prof elct is among those whose justification is related to existing conditions and deficiencies as well as needs caused by future growth. Accordingly, 25-year traffic growth increase within the WCCTAC area,27.5 percent, has been applied to the total WCCTAC area project cost of$6,000,000 to result in a STMP allocation of$1.65 million. i. STMP Funding: $1,650,000 it I 9.'I North Richmond Road Connection Project I I Extend Seventh Street northward approximately 0.1 miles to connect to an eastward extension of Pittsburg Avenue. Pittsburg Avenue would be extended eastward approximately 0.3 miles to connect to the Seventh Street extension. The extension will facilitate truck and vehicle traffic passing through North Richmond from the Richmond Parkway. Cost: $7.95 million I I Potential funding source(s): Measure J, state and federal transportation funds, County redevelopment funds, County funds. Project Nexus Discussion: This project is among those whose justification is related to existing conditions and deficiencies as well as needs caused by future growth. However, this project mainly aims to serve growth in truck traffic,resulting from new development in the North Richmond area. It is,assumed that at least one-half of the traffic on this project will relate to new development in the area.The STMP assignment is 50 percent of the total cost, or$4 million. STMP Funding: $4.0 million II 10. Hercules Transit Center I I Relocate and expand the Hercules Transit Center on the east side of Highway 4 to provide improved acI cess to/from Highway 4 and improved local circulation. Cost: $6 million II Potential funding source(s): Private developer contributions; Hercules Redevelopment Agency funds; state and federal transportation funds. Project Nexus Discussion: This prl ject is among those whose justification is related to existing conditions and deficiencies as well�as needs caused by future growth. Accordingly, 25-year traffic growth increase within the WCCTAC area,27.5 percent,has been applied to the total WCCTAC area project cost of$6.0 million to result in a STMP allocation of$1.65 million. STMP Funding: $1,650,000 i �I 2005 STMP Update for WCCTAC Page 14 of 20 TJKM Transportation Consultants May 5, 2006 !i li li ;I 11.;Del Norte-Area Traiisit-OrientedIDevelopment project-(public-improvements) - I _ Planning, engineering, environmental studies, and construction of the public transportation-related improvements at the El Cerrito Del Norte BART station's Transit Oriented Development project. Funding will provide improvements including,but not limited to: parking facilities;bicycle, pedestrian,and/or bus transit access improvements; signage; lighting; improvements to station access or'station waiting areas; ADA improvements; improvements to adjacent streets, street crossings, or signals; and/or Ohlone Greenway improvements. II I Cost: $25 million li Potential funding sources: Private developer contributions; state and federal transportation funds(for example,Transportation for Livable'Communities funds); Measure J funds. 'I I Project Nexus Description: This project is among those whose justification is related to existing conditions and deficiencies as well as needs caused by future growth. Accordingly, the 25-year traffic growth increase within the WCCTAC area, 27.5 percent,has been.applied to the total project cost of$25 million to result in a STMP allocation of$6.875 million. II STMP Funding: $6,875,000 II :I I 'II I:I II II ,I I II I I II I _ II 'I I I; II II II II I I III !I II 'Il II . II I! :II li 2005 STMP Update for WCCTACI Page 15 of 20 TJKM Transportation Consultants) May 5, 2006 II Ij CHAPTER 4. STMP PREVIOUS COLLECTIONS AND 2005 UPDATE POTENTIAL FEE REVENUES I Collections To Date I Th6 STMP was approved in 1997 and the first funds were received in April of 1998. Between April of 1998 and July of 2004 a total of=rage 031.39 has been collected, including$97,255.90 in interest. For this 75-month period, monthly receipts have been approximately$39;200. i During this period, the funds were allocated as shown in Table V. 11 I TABLE V:DISTRIBUTION OF FUNDS RECEIVED TO DATE Pro'ect Allocation Percent Pa ment Balance I i Richmond Intermodal $ 232,697.54 7.91 $ 135,391.31 $ 97,306.23 1 Highway 4 West $ 2,393,722.86 81.36 $2,100,435.39 $293,287.47 EI Cerrito Plaza BART Parking $ 232,697.54 7.91 $ 0 $232,697.54 I WCCTAC Administration $ 38,782.92. 1.32 $ 34,137.94 $ 4,644.98 1.1 CCTA Administration $ 44,130.47 1.50 $ 43,576.70 $ 553.77 Total $ 2,942,031.34 100.00 $2,313,541:34 $628,490.00 1 Source: CCTA If this monthly rate of receipts would continue for a 20-year period,the total receipts would be over $9.4 million in current dollars,not including any interest. This is one measure of the amount of funds that could be received over a 25 year period beginning in 2005 if the same fees would_prevail and the same rate of development were to continue. The Nexus Analysis prepared in 1997 indicated that the fees established at that time should yield about$5.1 million over 13 years (1997 to 2010). This calculates to an average of about $33,000 per month, so the actual receipts of abo t$39,200 per month, including interest, are conservatively close tolthe original estimates. II It should be noted that the 1997 Nexus Analysis showed that WCCTAC could legally establish fees whose revenues would total $24.5 million. However, at the time it was felt that it was appropriate to reduce the financial burden on both commercial and residential development. Single-family residential fees were established at$700 per unit instead of the allowable$2,345. Multi-family residential fees were reduced from$1,002 to $560. Retail, office and industrial fees were established at;$0.20 per square foot, instead of allowable rates ranging from$1.37 to$2.88 per square foot of development. PIotential Fee Revenues From 20015 Update 1 As noted above, the 1997 Nexus Analysis justified a total cost of$24.5 million in funds to be paid by the fee. This amounts to a rate of about$2,100 per peak hour trip. However,the amount of fee actually enacted amounted to about $440 per peak hour trip, or about 20 percent of the maximum amount. As noted in Table III, there is an estimated 28,571 a.m.peak hour trips associated with the expected growth in development in,!the 25-year period beginning in 2005. Using the 1997 rates, this amount.of trips would account for$12.6 million at the reduced rate of$440 per trip over the 25-year period or $60.0 million at the full rate of$2,100 per peak hour trip. Recommendations for the fees assoIciated with the 2005 STMP update are described in the next chapter. �I I �1 i 2005 STMP Update for WCCTAC ! Page 16 of 20 TJKM Transportation Consultants May 5, 2006 1j li II 1j CHAPTER 5. PROGRAM COSTS AND FEE CALCULATION 11 Updated Cost per Trip Estimate II Table VI presents a summary of the STMP improvement project costs,required adjustments to account for past STMP activities,the projected future trips to be added by new development, and the resulting estimated STMP improvement cost per trip. The total cost of the STMP projects to be included is $370,840,000. Adjustments to the fee are as follows: li 10 Outside Funding- $121,848,000: These are anticipated funds from outside sources that will 1 offset the costs of projects in the STMP. See Table IV for details. I• Exceeds Nexus- $150,892,000: These are funds that exceed the nexus test described in 1 Chapter 3 and 6. II These adjustments are applied to the fee calculation as shown in Table VI. The updated fee calculation is based on trip generation estimates in Table 3 and the cost estimates of the STMP improvement projects presented in Table IV. The updated cost per trip is $3,507,using a total STMP project cost of$101,043,000 and a total of 28,810 new a.m.peak hour trips. The STMP improvement projects cost and the STMP portion of these costs as well as the calculated new STMP cost per trip are ishown in Table VI. I Table VII presents the new STMP schedule of fees. The land use categories in this fee schedule reflect the current situation with the STMP. it i �I TABLE VI:2005 COST PER TRIP ESTIMATE II 1 STMP Portion of Actual STMP STMP Portion Change from STMP Improvement Projects 1997 Costs Fee Adopted of Change In 1997 2005 Costs 1997 II 1 All Projects $64,267,500 - $370,840,000 +$306,572,500 Subtotal $64,267,500 -- $370,840,000 +$306,572,500 I-i Outside Funding $39,841,000 - $ 121,848,000 +$82,007,000 Exceeds Nexus - -- $150,892,000 +$150,892,000 Net Improvement Costs I $24,426,500 $5,100,000 $98,100,000 +$73,673,500 Plus Administrative Costs(3%) (Included in total) -- $2,943,000 - II - 1 Total STMP Funding $24,426,500 $5,100,000 $101,043,000 +$76,616,500 II Total Peak Hour Trips Added by New Development11,589 11,589 .28,810 + 17,223 i STMP Cost Per Trip $2,100 $4401 $3,507 1 +$1,407 I1 JI g i 1�I I� 2005 STMP Update for WCCTAC Page 17 of 20 TJKM Transportation Consultants May 5, 2006 I II I -TABI E VII:2005-RECo1V MFNDED STMP ROTES AND-FEES AND-FEES- — --- ii II Ii 2005 Peak Hour Units of 1997 Fee Rates 1997 Fee Rates Land Uses Trip Rat es Use Fee Rates* (full funding) as Adopted (full funding) Single-family Residential 0.741 DU $2,595 $ 1,554 $700 Multi-family Residential 0.471 DU $1,648 $987 $560 Senior Housing 0.211 DU $701 — — II Hotel 0.561 Room $1,964 — — Retail 0.521. SF $1.82 $0.34 $0.20 Office 1.001 SF $3.51 $ 2.79 $0.20 Industrial' 0.70 SF $2.45 $ 1.89 $0.20 i Storage facility 0.15 SF $0.53 - - II Church 0.45 SF $1.58 - II Hospital 1.20 SF $4.21 - Ij DU=Dwelling Unit SF=Square Feet j Note:Based on$3,507 per peak hour trip Other Factors In STMP Update Trip Adjustments The peak hour trip'rate for the retail category was adjusted.to account for trip lengths as described in the 1997 study. The base a.m. rate for retail was reduced by 50 percent to account for reduced trip lengths as compared with non-retail uses. Trip rates for the office category were reduced from1.33 trips per thousand square feet (ksf)to 1.00 trips per ksf. industrial trip rates were reduced from 0.90 to 0.70. Exempt Development In the 1997 study, it was found that slightly more than 10 percent of the land use depicted as future growth already had some level of land use entitlements and would be exempt from the STMP payments. These exemptions were either because a) a vested tentative map had been issued, or b)a development agreement had been completed which specifically excludes assessment of any ladditional fees. It will continue tlo be appropriate for fees to be waived in these cases, although it is unlikely that development agreements have been approved subsequent to 1997 that eliminate participation in WCCTAC STMP fees. Special Cases As was the case in 1997, it remains appropriate for developers to request a special traffic study if it is felt that their particular land use proposal either does not fit into one of the land use categories or if the particular devlelopment may generate less traffic than the category provides. Th'e methodology for conducting such a study shall be approved by the WCCTAC upon recommendation of the WCCTAC-TAC. The appropriate governing/permitting agency shall be responsible for reviewing and appro i ing the individual traffic studies. Establishment of Final WCCTAC STNV Fee WCCTAC may decide, as it did in 1997,not to levy the' fall fee that has been established as a part of this study. If.so,the results will be reflected in an adjustment to this study. I I , li II 2005 STMP Update for WCCTAC I Page 18 of 20 TJKM Transportation Consultants May 5, 2006 II CHAPTER 6. NEXUS FINDINGS Forecasts of future traffic volumes were made to provide the data needed to establish the reasonable connection between new development's travel demand and the need for and costs of the proposed projects within the WCCTAC area. ABAG's Projections 2003 was used to determine the amount of growth in land use in the west county, area between 2005 and 2030. Subsequently,traffic usage related to the growth was calculated as described in Chapter 2. I.I Using the traffic generation results and the estimated project costs, the portion of the estimated project costs that can reasonably be connected with the need generated by projected new development has!been calculated. 11 The following process was used to established the amount of a project that can attributed to growth and thereby be eligible for STMP funding: II Amount of households in 2005 88,050(from Table 1) Amount of employees in 2005 82,150 (from Table 2) Household trips in 2005=88,050 x 0.63 i 55,472 Employment trips in 2005=82,150 x 0.60* 49,290 i Total trips in 2005=55,472+49,290 i 104,762 Growth in trips between 2005 and 2030 28,810(from Table 3) Percent of traffic related to 25 year growth=28,8101104,762 27.5% *Trip rates—see page 5 for details II Therefore,as noted in the Project Nexus Discussion in Chapter 3 for each of the 11 STMP projects, a minimum of 27.5 percent of the.cost of each project was assigned to the STMP, unless a lesser amount of funds is necessary to fully fund the proposed project. In a few cases, a greater percentage ways utilized when conditions dictated. !I � It1is noted that of the $371 million worth of needed improvements identified in this analysis, over $121 million in outside funding sources have been identified. These outside sources primarily- 1 161ude proposed Contra Costa County Measure J, which is the extension of the one-half percent sales taz levied for transportation improvements. Measure J,which is intended to fund improvements which will correct both existing and future deficiencies, is a partner to the STMP extension,which by law must only fund future transportation deficiencies associated with new development. Measure J was approved by Contra Costa County voters in the general election on November 2, 2004. In addition, the project nexus analyses indicated that$150,892,000 of the projects does not meet the minimum nexus requirement. Thust of the total deficiencies identified in the 11 proposed STMP ij projects, only 27 percent of the funding comes from the STMP. The methodology of this report is to ensure that only the portion of the projects included in the STMP project list is necessitated by the growth in traffic between 2005 conditions and 2030 conditions. . Thus, there is a reasonable relationship between the proposed use of the STMP and the proposed land uIse development projects on which)the fee will be imposed. In the same manner there is a reasonable relationship between the need for facilities included in the STMP and the proposed land use development projects. .I I .I I 2005 STMP Update for WCCTAC Page 19 of 20 TJKM Transportation Consultants May 5, 2006 ii Ij ' II II CHAPTER 7. -STUDY PARTICIPANTS li I e Ii TJKM Transportation Consultants Personnel II Chris D.Kinzel, P.E. f Project Engineer Brad Thornton I Project Engineer Dan Harrison Project Planner Evi Pagh Word Processing/Production The Reed Group II Robert Reed Principal ii Persons/Agencies Consulted/WCCITAC --TAC Members .i i Lisa Hammon, Managing Director WCCTAC Brad Beck CCTA Bruce Beyaert Trails for Richmond Action Committee(TRAQ Aleida Chavez WestCAT Rich Davidson I City of Richmond John Greitzer Contra Costa County Community Development Department Deidre Heitman BART Adele Ho City of San Pablo Bruce King City of El Cerrito Nathan Landau AC Transit . Steve Lawton I City of Hercules John MacKenzie Caltrans Brent Salmi Pinole !I II II II II 'I I I I II 'I l ;I I Ali II �I I II - �il 'Il i 2005 STMP Update for WCCTAC Page 20 of 20 TJKM Transportation Consultants) May 5, 2006 II I LEGAL'--PU=BLICAT-ION Contra Costa County STA_COl1K� . FROM: I Clerk of the Board TO: Contra Costa Times :11651 Pine St., Room 106 P.O. Box 4718 Pine Street, Martinez 94553 Walnut Creek, CA 94596 II E-MAIL: cctlegals@cctimes.com FAX No. 925-943-8359 Requested by:: �' L. SRARP I Date: JUN:? 139 2006 Phone No.:1 925-335-1903 Reference No.: II . Org.: OG Sub Object: 2190 Task: SAS Activity: 6P4007 Publication Date s UNE 30 ands L,Y 07, 2006 Ij No. of Pages: (2) I LEGAL PUBLICATION ORDINANiCE FOR THE-.;.WEST CONTRA COSTA TRANSPORTATION ADVISORY COMMITTEE FEE PROGRAM. 11 II I li II E-MAIL *** Immediately, upon expiration of publication, ** send in one affidavit for each publication in 11 order that the auditor may be authorized to pay you bill. I I , Authorized Signatu Please confirm date of publication and receipt of this fax. 'I I _ 11 :I I �I II II CONTRA COSTA COUNTY I, 255 GLACIER DRIVE MAR'CINE7, CA 94553 II NOTICE OF PUBLIC HEARING AND AVAILABILITY OF DATA (Ordinance for the West Contra Costa Transportation Advisory Committee Fee Program) II The.IBoard of Supervisors will hold a public hearing on July 18, 2006 at 9:30 a.m. in the Board Chambers. County Administration Building, 651 Pine Street! Martinez, CA. to consider Ordinance 2006-21 for the West Contra Costa Transportation Advisory Committee (WCCTAC) Program Area. Feesl collected through the West Contra Costa Transportation Advisory Committee will be collected only from new''development within this portion of unincorporated Contra Costa County and will be collected upon the issuance of a building permit. II The,WCCTAC Subregional Transportation Mitigation Program is the result of a Master Cooperative Agreement between the Contra Costa Transportation Authority, the Cities of EI Cerrito, Hercules, Pinole, Richmond, and San Pablo, the County of Contra Costa, and the West Contra Costa Transportation Advisory Committee. The WCCTAC will support the list of regional improvements described in the West Contra.Costa Transportation Advisory Committee Subregional Transportation Mitigation Fee Program Update (Development Program Report). II The, proposed fees for approval by the Board of Supervisors are: Land Use Proposed Fee Single-Family Residential $2,595 per dwelling unit i Multi-Family Residential $1,648 per dwelling unit I Senior Housing I $701 per dwelling unit Hotel $1,964 per room Retail/Commercial $1.82 per square foot of gross floor area Office $3.51 per square foot of gross floor area Industrial $2.45 per square foot of gross floor area :11 Storage Facility $0.53 per square foot of gross floor area i Church $1.58 per square foot of gross floor area Hospital $4.21 per square foot of gross floor area Other* $3,507 per AM peak hour trip 'The fees for uses not listed above shall be determined by the sponsor collecting the fee according to information generated by appropriate traffic studies, or other means of determining traffic impacts as approved by WCCTAC, or in accordance with the Institute of Traffic Engineers(ITE) Manual. II In addition, an administration fee equal to 2 percent of the Program revenue shall be assessed. As with most fee.programs, the fee revenue from the WCCTAC program will not pay the cost of all regional improvements. Other funding must be generated, some of which include fees generated from Measure C and State Transportation Improvement(S IP) Funds. II The Development Program Report, which includes a description of the proposed improvement cost estimates and funding mechanism will be available at the Clerk of the Board. For more information, contact Brian Louis of the County Public Works Department, Transportation Engineering Division at 313-2245. li I hereby certify that this is a true and correct copy of an action taken and Entered on the minutes of the Board of Supervisors on the date shown. II I I AtTESTED JUNE 13, 2006 II JOHN CULLEN, Clerk of the Board of Supervisors a,nd County Administrator II BY EMYL. SHARP DEPUTY PUBLICATION DATES JUNE 30 and JULY 07, 2006 li iI II ;i I II � II 3 1•. ;•ti` 3 : mac• i i.: 5 3 yt.. 4 f. } F,_ I� �. t a R ;::..: 3 j Y 4 y, 1 I ...... /\ i a 1 <i ..... .. - .. 7..... ....... .... .. :..: ....................... v . '...fit�.:��'.:�i:�'' r=s s ^:. �:» ... .. 1 CL S " :: :.i 4 I f %�1.:.::.,........ ... IL 'S .............. .............. ............::: •S4. 1A 9 } t 4 I . ..... d 3 s "ii s �....��+ a S "::(: %� r 1p: w; 2 V. I O O s i 2 t?4 V Im ' ?i ................... _ I <', ...............: w:4?' 4 A. .. ....... .... '•'•i Jay( S ......:. r.4. i;::• [���� t:: :.:: s 3? W .s; 2c t.1 f V. Ant4 :l•�' ..-. acs:' •i�.Ar"�: :. rl 1 7 1 (:::: - v I . ........... ...:......... .......... ::I::i;' son �- a - ,�. ������`:� r V _ lotO ., rte• ........:... ;.. O � y> r, Ak ja CD �I II �II I I • II • I i CONTRA COSTA COUNT PUBLIC-WORKS -DEPARTME-NT-. 255 Glacier Drive Martinez, CA 94553 II I I �I PUBLICATION -REQUEST TOi: Jane Penninbtoni Chief.,.Clerk- of the Board .Atte.:, Emy Sharp, Deputy Clerk, Clerk of the Board esharacob.cccoimty.us FROM: Brian Louis I I Public Works Department (925) 313-2245 II BOARD MTC. DATE: June 13, 2006 i, PREVIOUSLY APPROVED BY BOSON: HEARING DATE: JUIN1.8, 2006 li PUBLICATION DATES: To be determined by Clerk of the Board i REQUESTED PUBLISHING PAPER(S): Contra Costa Times ;I I I • Dbl not type below this line—Publication lan-iia,;e oar follojvina paae I I I I I, �I li I I �I I I� I I II I I 1`,c"11m1nL!.)(':\I..S ICfC11111 '.Lot us.NoleS.D;llW.hIbIlCil iun I.cyuczt-\l%i'i_I'ACA10C it I of 2 II I i ,I I 'I.I 11 i II 1 II �I II II ;I II I I -. :i it i., - _ - WSW ;I I ym,ryr b"`d1C�e'�ei ti i J i. 1 .J I it I Ci P r 1,i of t h e 1"'i=i e i'fs.. I I ' Req uested by:. tot-1. SYTO s. l'ir.l1lE: IE.:i �I ('l r 4�. `7% Sal s_.S 1, .� 's:•4v .. i'.ll.(..' I? l;1_ ..... . T. ,I I I -. • t+Ti { - -;� - - - ---LEGAL PL _BLICATI-ONRE - - I -- -- -- - -- - _ s r Contra Costa County ST'9`COUK7� . 11 1 • FROM: i Clerk of the Board TO: Contra Costa Times 11651 Pine St., Room 106 P.O. Box 471.8 iPine Street, Martinez 94553 Walnut Creek, CA 94596 E-MAIL: cctlegals@cctimes.com II FAX No. 925-943-8359 Requested by,: M L. SHARP Date: JM 13, 2006 925-335-1903 Phone No.:! Reference No.: Ora.: 067611 Sub Object: 21901 Task: SAS Activit>,,: 6P4007 Publication! Date (s) JUNE 30 and JULY 07, 2006 No. of Pages: (2) I I LEGAL PUBLICATION URGENCY ORDINANCE FOR INTERIM WEST CONTRA COSTA i� TRANSPIORTATION ADVISORY COMMITTEE FEE PROGRAM ii I, e mail *** Immediately- upon expiration of publication., y** send in one atifidavit for each publication in order that the auditor may be authorized to pay you bill. ii Authorized Sianature: i Please confirm date of publication land receipt of this fax. iI Ale CONTRA COSTA COUNTY .- - -- — .EIIBLIC_- ORE'S DEPART.-M:EN.T------ -- — .- - ---- -- . — -- 255 Glacier Drive j Martinez, CA 94553 I I NOTICE OF PUBLIC HEARING AND AVAILABILITY OF DATA Ij I (Urgency Ordinance for the Interim West Contra Costa Transportation Advisory Committee Fee Program) The Board of Supervisors will hold a public hearing on July 18; 2006 at 9:30 a.m. in the Board Chambers, County Administration Building, 651 Pine Street, Martinez, CA. to consider adopting an Interim Urgency Ordinance (Ordinance 2006-20)for the West Contra Costa Transportation Advisory Committee (WCCTAC) Program Area. Fees collected through the West Contra Costa Transportation Advisory Committee will be collected only from new development within this portion of unincorporated Contra Costa County and will be collected upon the issuance of a building)permit. The WCCTAC Subregional Transportation Mitigation Program is the result of a Master Cooperative Agreement between the Contra Costa Transportation Authority, the Cities of EI Cerrito, Hercules, Pinole, Richmond, and San Pablo, the Countylof Contra Costa, and the West Contra Costa Transportation Advisory Committee. The WCCTAC will support the list of regional improvements described in the West Contra Costa Transportation Advisory Committee Subregional Transportation Mitigation Fee Program Up ate (Development Program Report). 11 The proposed fees for approval by the Board of Supervisors are: ;Land Use Proposed Fee Single-Family Residential $2,595 per dwelling unit !Multi-Family Residential $1,648 per dwelling unit (Senior Housing. $701 per dwelling unit Hotel $1,964 per room (Retail/Commercial I $1.82 per square foot of gross floor area I:Office $3.51 per square foot of gross floor area Industrial $2.45 per square foot of gross floor area (Storage Facility $0.53 per square foot of gross floor area Church $1.58 per square foot of gross floor area Hospital $4.21 per square foot of gross floor area Other* j $3,507 per AM peak hour trip *The fees for uses not listed above shall be determined by the sponsor collecting the fee according to information generated by appropriate traffic studies, o,r other means of determining traffic impacts as approved by WCCTAC, or in accord;ahce with the Institute of Traffic Engineers(ITE) Manual. I In addition, an administration fee equal to 2 percent of the Program revenue shall be assessed. As witH most fee programs, the fee revenue from the WCCTAC program will not pay the cost of all regional improvements. Other funding must be generated, some of which include fees generated from Measure C and State Transportation Improvement(STIP) Funds. II The Development Program Report, which includes a description of the proposed improvement cost estimates and funding;mechanism will be available at thei Clerk of the Board. For more information, contact Brian Louis of the County Public Works Department, Transportation Engineering Division at 313F2245. I het-chy eci-61 ,that this is a true and correct eopv ofan action taken and anlcrcd on the minutes ofthc Huard ul'Suput'visors on the date showm. I AT,fl:1'F]D: .TUNE 13.2006 II I Jc kIL\ C'LJ1..1,1 \, (Acrk ol'thc Iioard ol'tiuhe r isur;ani)i_uuniy :\lminislratur �I i 13y, EMM L.SHARP I Deputy ij Publication Dates: IUNE 30 and JULY 07,2006 I� I� II I II II AY ........:: . .... .... 'I: S ti. »...... ...... : ::.... ..................:. ....... .:.:::.::. ..... .....: ,.:::.: s J 3 ................... ..:. :. ..:::.:.:::::::::.. ............... i i4 L«. :::.:............... 1 t •s;` :: .. .......... r . ........... . .... . V t' ............. .:::::::::::::. l ::::........ a I CL j i+ ...;:.;:.; V 4 ✓T::::.: ... f Y.:. 177 ..,......;:,:.;;:.::.:: , }} t. a..4.,. f.. `A 1 :i z: ff l ..........::: .......... ..........:;::. .... .......:. I ti ] <5 �r I f t• .... ........ O r I .r� :... .::::::: t f• J. . '�2::::::;::;::::;:::::is::':2'::.:;::::::::;;::.:.:::. :r:. ::�:;nt��'':.:.::::::: .............. .............. ...........::: .............. C.. slox O t . ................. , . ■� :I:.:.:,r. 3{ ^ ...% ". IL ............ Co w .�: is �'^'.:::•:•; ,„,f �..r CL lifol :. ...:>r:.:<::::;s::,::: .i_ .:::': fi , to . i:iiJ::: :: T :::ii`<:� Mbw ( �. .f.. L OIwo I ,M,. r r• : �:;� a�si. .;.;.;.::, fir- le I d 3 ' � co �i O III L ill �I �II II Ij CONTRA COSTA COUNT I -PUBLIC--WORKS DE-PARTM-ENT 255 Glacier Drive II I I Martinez, CA 94553 I SII ' PUBLICATION REQUEST II II TOS: Jane Pemlinaton, Chief., Clerk of the Board Attn: Emy Sharp, Deputy Clerk. Clerk of the Board eshar_nwcob.000ollllty.[IS FRIOM: Brian Louis Public Works Department (925)) 313-224 II B6A1 RD MTG. DATE: June 13, 2006 �I PREVIOUSLY APPROVED BY BOS ON: II HEARING DATE: July 18, 2006 II PUBLICATION DATES: To be determined by Clerk of the Board j REQt'ESTED PUBLISHING PAPER(S): Contra Costa Times II 'I I II N Inot tw-pe below this line—Publication larr;rtq�e on folloit,iira pt{ge .I I I II Ij 'I I II ij SII I.� �II II II I:�-)(•ti\1Ci-1 cshn�iLCt 'r\L.ti..l l'cmli<'.I.ouis.\ lcs.l-hua'I'uhlicationkequest-\Vi'<"'I';\C'.dor II II ii �. .------. ..... ----- — —--. ..— I - 11 f) ,I I II iL=-i_1tl1fi:::=t CCS'=,TH 1_FUHT' !_l—EPK OF THS I, II DATE 14 =.P-T I NE r!I",l H1 T I F-1 I I Of i) 44 F 7, :: J4< GJt i rt I1 ii 11 li (i it it II 2017_ 1—� __ ��.. IT�'H �__`'Ti� +-0i_T-IT`i' t—LE ;4, OF THE ra_;1-- _ _... _' 19 'l II LE � IIN rl y �� TI 0pj�� qq It Contra Cos �:��1111t4 I, it ��: Contra FROM: ;C1erk of the: Board Ca�L 4.71 05, 4"ine St., t_c►om f 06 1 59fi (pine Street, NMartinei 94553 �'� alnc�c Creek, � j� u ;I E^MAtl_, c:c.t1e9:1s i`,cetin'e".c;cam .II FA No 925-943-83-9 it I i JSE- —I-j-,—3—t EIN L. T Date: Recueste0 ',br •_ . _ 925-33: -].903 'o '�efercn 'tunc No." I, Sub - a�t• 21�3U� � f�411: ��~-�.+�5'.tl�'�t�•.. C6''4C ��.,r:_ _..._._....�.�. t'u�r{acafi:itan date f��} .: rPaves--- ` Ili �l \ � L-i�,,CY C�LLL/1 NAL'1` _..._...._-