HomeMy WebLinkAboutMINUTES - 09282004 - C.1 TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: September 28, 2004 SUBJECT: Amendment No.1 to the Consulting Services Agreement with Ove Arup and Partners California Ltd. to provide bridge design services for the Iron Horse Trail Pedestrian/Bicycle Overcrossing project in the Pleasant Hill BART Station area, (District IV). Project No.:0662V6R4078 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION i. Recommended Action: APPROVE and AUTHORIZE the Public Works Director, or designee to execute Amendment No.1 to the Consulting Services Agreement (CSA) with Ove Arup and Partners California Ltd. (ARUP) effective June 1, 2004, for the following: A. Increase the payment limit by $16,887.02 to a new payment limit of $036,887.02 to perform additional utility potholing for the Iron Horse Trail Pedestrian/Bicycle Overcrossing over Treat Boulevard in the Pleasant Hill BART Station Area. B. Amend Appendix B of the CSA in accordance with the new payment limit and update staff rates. C. Amend Appendix C of the CSA providing a listing of key personnel, including subconsultant personnel. . # mow* _k,:� .ECOMMENDATION OF COUNTY ADMINISTRATOR �r . w RECOMMENDATION OF BOARD COMMITTEE .�4aOVE OTHER. SIGNATURE ACTION OF BOR ON SEPT, 28, 2004 APPROVED AS RECOMMENDED xx OTHER rt I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. VOTE. OF SUPERVISORS xx UNANIMOUS(ABSENT NONE } AYES; NOES: ABSENT: ABSTAIN: ATTESTED: SEPTEMBER 28, 2004 GrpDatalDesignlBOARD ORDERS12004111-17 Ped bridge CSA amend No 1.doc John Sweeten, Clerk of the Board of Supervisors and CR.h County Administrator Ong Div: Public Works(Design Division) Contact: Neil Leary 313.2278 cc: E.Kuevor,CIAO Auditor-Controller community Development Construction By_ , Deputy SUBJECT: Amendment No.1 to the Consulting Services Agreement with Ove Arup and Partners California Ltd. for bridge design services in the Pleasant Hill BART Station area, (District IV). Project No.:0662-6R4078-02 DATE: September 28, 2004 PAGE: 2 I1. Fiscallmpact: This contract amendment allows for an additional $16,887.02 above the previously approved contract for $920,000.00 funded by Redevelopment Agency funds (100%). Ill. Reasons for Recommendations and Background: On June 10, 2003, the Board of Supervisors approved the design of the pedestrian/bicycle overcrossing at Treat Boulevard. The project provides for pedestrian and bicycle safety when crossing the heavily trafficked Treat Boulevard. The bridge will also link discontinuous sections of the Iron Horse Trail. On January 6, 2004, the Board of Supervisors approved a Consulting Services Agreement with Ove Arup and Partners California Ltd. for bridge design services. This agreement included a budget for utility locating services in the vicinity of the planned bridge. The original budget, however, did not include sufficient monies to account the large number of utilities in the bridge footprint. These requirements necessitated an increase in the scope and extent of the utility potholing investigation. This amendment covers the additional costs for utility potholing work. The original CSA and appendices did not allow for escalation (cost of living) of ARUP staff salaries or for the addition of new subconsultants and staff members. The amendment corrects this oversight by allowing for salary escalation and for the replacement of key personnel as approved by the County. IV. Consequences of Negative Action: If the amendment is not approved, the consultant cannot be paid for out of scope items of work. AMENDMENT No. 1 , n CONSULTING SERVICES AGREEMENT PROJECT NAME: iron Horse Trail Pedestrian/Bicycle Overcrossing PROJECT NO.: 0662=684078 1. Parties: Effective on June 1, 2004, the County of Contra Costa, a political subdivision of the State of California, hereinafter referred to as"Public Agency,"and Ove Arup and Partners California Ltd., hereinafter referred to as "Consultant," mutually agree and promise as follows: 2. Purpose: The parties desire to amend the agreement they entered into effective November 1, 2003, entitled "Consulting Services Agreement," hereinafter referred to as the "Agreement." The Agreement is for bridge design services for the Iron Horse Trail Pedestrian/Bicycle Overcrossing over Treat Boulevard in the Pleasant Hill BART Station Area. This Amendment provides for the following: a. Additional utility potholing budget. b. Updating ARUP's rate schedule in Appendix B to allow for limited staff salary escalation once a year and to establish rate ranges for particular disciplines. C. Updating ARUP's Key Personnel and 5ubconsultants list in Appendix C and to allow for staff substitutions under limited circumstances. 3. Amendment(s)to Agreement: #y'3b,,1887 0z a. Amend Section 1(e): Agreement Payment Limits to X743. b. Amend Appendix B in accordance with the attached "Revised Appendix B" (9 pages) and allow ARUP to adjust, on an annual basis on April 1, its staff rates to reflect adjustments to individual compensation. Such changes shall be equal to ARUP's actual changes in hourly rates. Prior to each annual rate change, ARUP shall provide Public Works with at least 30 days advanced written notice of the changes. In no case shall the average of all adjustments in a given year exceed five (5) percent, or an individual adjustment exceed eight (8) percent. Amendment shall also reflect changes in project staff and subconsultants. c. Amend Appendix C in accordance with the attached "Revised Appendix C" and allow ARUP to replace listed key personnel provided ARUP submits to Public Works a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any other information requested by Public Works. Proposed substitutes shall have comparable qualifications to those persons or firms being replaced. Public Works shall notify ARUP within seven calendar days after receipt of all required information on its decision regarding substitutions. 4. Remaining Provisions: Except for the changes made by this Amendment, all provisions of the Agreement shall remain in full force and effect. 5. Signatures: These signatures attest the parties' agreement to this Amendment. PUBLIC AGENCY CONSULTANT By: Maurice M. Shiu By: Public Works Director (Designate official capacity in the business) s (D signate official capaci in the business) Note to Consultant: For corporations, the contract must be signed by two officers. The first signature must be that of the chairman of the board, president or vice-president;the second signature must be that of the secretary, assistant secretary, chief financial officer or assistant treasure. (Civ. Code, Sec. 1190 and Corps. Code, Sec. 313). The acknowledgement below must be signed by a Notary Public. CERTIFICATE OF ACKNOWLEDGEMENT State of California, ) ss. County ofGt�, r 4'K7- On this date written below, before me,the undersigned Notary Public, personally appeared the person, )- signing above for Consultant, personally known to me (or proved to me on the basis of satisfactory evidence) to be the personfsl-whose name er is/af' subscribed to the within instrument and acknowledged to me that he/sgeAl-req executed the same in his/hertth authorized capacity(iest, and that by his/hoW4heir signature(a)-on the instrument the person(s�or the entity upon behalf of which the persop(sTacted, executed the instrument. Witness my hand and official seal. Dated:19ft&V' � ry ss t at: t7-BONO CoarVrirlor"# )395974 d ti qrik*Notary PUbhc -Cd1f0M10 San Frdncisco County corm: .Jan NOTARY PUBLIC APPROVED AS TO FORM: SILVANI B. MARCHESI County Counsel By: Deputy G:1GrpData\Design\Correspondence\IHT Ped Bridge at TreaBAmend.csa 1HT Ped Bridge 8-30-04.doc 3102/01 PUBLIC AGENCY 7ONSU By: Maurice M. Shiu tuner Public Works Director ident rk 4 By. `- L By: Laurence S. Noble Assistant Secretary Note to Consultant: For corporations, the contract must be signed by two officers. The first signature must be that of the chairman of the board, president or vice-president;the second signature must be that of the secretary, assistant secretary, chief financial officer or assistant treasure. (Civ. Code, Sec. 1190 and Corps. Code, Sec. 313). The acknowledgement below must be signed by a Notary Public. CERTIFICATE OF ACKNOWLEDGEMENT State of California, ) County of ) � 1 On this date written below, before me, the undersigned Notary Public, personally appeared the person(s) signing above for Consultant, personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) ire subscribed to the within instrument and acknowledged to me that heisi"/they executed the same in trisAiet/their authorized capacity(ies), and that by#Wsgerltheir signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my hand and official seal. Dated:6q_*W lo=''K "i , ?T L'tWAMW 01 t3EBON0� i Ci1395974 Nary Pubic - California � r scary k6ncisco County NOTARY PUBLIC Win. �25.2pU7 APPROVED AS TO FORM: SILVANI B. MARCNESI County Counsel By: Deputy 01:131646101 Ownerll-03 Contract&FeeslAmend.asa 1N7 Ped Bridge 8-30-042.doc 3102101 Iron Horse Trail Cvercrossing Project No.0862.884078 Cost Proposal Summary•Revised June 1,2004 REVISED APPENDIX B Submitted By:Amp COST PROPOSAL summary Amp SC Solutions DMO Architects SFE Landscape Fahr b Pears TOTAL TASK LABOR Architects TASK Oak Description Hou. Cast Hous Cost Hsun Cast Hauro Cost Noun Cost HOURS COST S PRELIMINARY ENGINEERING 1A Project Management and Project Administration 1.1.1 Project Management-Pretimina E tnearin Phase 52 $ 2,595.64 - $ 52 $ 2,595.64 1.1.2 Project Administration• relimina E A Phase 26 $ 15422.35 - $ 28 $ 5,422.31 1.2 Perform Gootechnical Studies 1.2.1 Pre are Brill Foundation Report and Bod s 45 $ 2,315W - $ 45 $ 2,3f 5.07 We are Ge Mchnicai Design Ronort 107 $ 4,338.33 - $ -1 107 $ 433633 9e ng a ctCa <, m mme n ora SE 5:FINAL OE t N ct Mans ment and Pro ct Administration ct Mana anent-Final Dea n Phase 134 $ 6,384.60 24 $ i 384.62 42 $ 1,284.58 50 $ 1,394.97 23 $ 1.129.75 250 $ 15548.52 ct AdminishadanFinal Des n Phase E374 $ 4,026.72 32 $ S 653.85 32 $ 972.68 16 $ 243.52 16 $ 416.00 216 S 7312.77 are P ect Plansorm 30°h Desl n $ 27674.35 - $ 236 $ 8,917.44 88 $ 2 260.89 - $ 1,220 S 38,852.44orm 65%Desi n $ 58,655.32, - $ 120 $ 4,234.83 79 $ 2,009.49 108 $ 4,190.201 1,871) $ S 089.85 22.3 Perform 90%Design $ 47537.58 $ 40 $ 1,575.26 69 $ 1,782.64 48 $ 1,857.60 1,495 $ 52,7 3.08 2.2.4 Perform Foundation Review $ 1,270.24 $ - $ - $ S 40 $ 1,270.24 2.3 Prepare specifications S f3 676.49 $ - $ - $ - S 374 $ 13,@78.48 2.4 Pre are Ouartilties and Estimates S 8,224.24 $ - $ - S - $ - 248 $ 5224.24 2.5 Inde ndent Reviaw of Structures $ 1236.60 750 $ 30,393.26 - $ 5 $ 782 $ 31,630.2,5.1 Road Plan Review 5 f 645.40 - $ - $ $ - $ 44 $ 1,045.40 2,6 Final Bridge L htl &Ehctneal Desi n 244 $ 774340 - $ - S -I$ - $ 244 $ 7 i48.40 re sea u in < 24 MMM $ 31442.77 Phase) Olaf Total Preliminary Engineering and Phase Anticipated Raises $ $ $ $ $ Adjusted Total Labor $ 218,380.52 $ 33,431.73 S 18,297.05 S 9,334.41 $ 81581.05 $ 288,025.85 Combined Burden Plus Overhead $ 377 798.30 S 577502.57 $ 29,174.64 S 18,046.52 $ 13,D44.56 $ 495,588.80 Total Labor Costs I$ 598178.83 $ 90,934.30 $ 47,471.69 $ 27,380.92 $ 2S,fi28.51 $ 783,592.25 Total Other Direct Costs $ $5,773.00 $ 500.00 S 900.00 $ 2,400.00 $ 300.00 S 59,873.00 $ubconsuham Adminstration Fee 0 M. I Total Fee 1, GRAND TOTAL GRAND TOTAL S 935,9?rn---'7 3 PHASE W CONSTRUCTION SUPPORT 3.1 Pm ct Man2gement and project AdminIstration 3.1.1 Pro ct Man ement-Construction Phase 3A.2 Pwject Administration-Construction Phase 3.2 Respond to Conhactor inquires -1$ 3.3 Perform Construction Design Support 1 13.1 Review shop Plans - $ 3.32 Review Cost Reduction Incentive Proals(CRIPS) $ `'$ 3.3.3 Provide Technical Support - $ $ 3,341110 and Anat Nmides of Potential Claims $ S ata s-u t ens phase ora Total Phase N Anticipated Raises Adjusted Total Labor S S S 1$ $ $ Combined Burden Plus Overhead S $ $ $ $ $ Total Labor Costs $ 5 S $ $ $ Total Other Direct Costs $ $ 5 $ $ $ Snbconsultent Adminsha4on Fee a 0% S Total Fee GRAND TOTAL 4 PHASE ill:OPTIONAL TASKS ase +Nal Total Phase tit •1 Anticipated Raises S S $ Adjusted Total Labor 5 8 - S S I$ S Combined Burden P Overhead 5 $ $ $ S 1$ Total Labor Costs $ S S $ $ $ Total Other Direct Costs S 5 $ S $ S Subconsuhant Adminsbation Fee 0 0% $ Total Fee GRAND TOTAL GRIND TOTAL Page 1 Of 9 ................................................ _....._._........................................................................................................._..... _.............. ......... .................................................................................... __. _..... ......... ......... ......... ............................................................ ... _.__. _._... _._...... .........__............ ......... .............. ......... _. _ __............. � mnYm w.aaamama "^`�mm++aY emY.Y >o�w++ e�r+m WY+ sM+. emr.+.aW ap.. e�w. m r Asm Toiaa rutcuaoa IL Amm tJJneu,Y.ryammm..,mg.nm' I tmYEmlmm ume t alk— rymmYm.rm mnmwl.mwm-a m.,i. i+.i6mvm Mwal TaulEmmY -b nmia Ermareei: Y3,06mvf £xm4+mS P )la00 ��y fxlwnnt: PA.m}mvm Eenixvtl mumen•tNY1wA 4�'A 6xpps6: Yt,Am6C Ya1dCa4x 6xmYmmm; EFb,1)A.vm 6pwer. Ab,p50m taYl tmixbfrmJ pMa b K,PbmD ExmYw f: $A,W.m Hma tabx b St,NiAb tmYx YYYui! , AEA rnN� TYtlpbctlW E Eglwml: E�A figrvsx Y. S IuEWeJ tlYT ,._ T� Eyaimm k f EWYux A: f CmrntlnJL4YY�TJOnAW ExpnxO: S Eaxw �m 6xwusf E TYJpmn lNMmal CmmY S Bxmrnm): l a 12,w Friwss m. t ' TYJ PIIxmaW �S M�pIW{ilr C 4ywem t. rYw Jfgxw {axww ' &plw1: N4MM4im4fnr �{, Exy.lee A: E - sxwr..a: t Exyewm. E TcW al,Ydrw M.Is f a»o +amx t y.asm iron H-Trul Ovarcraawng PrMeci No.0662-SR4076 ClsuNioatwn/ ie Pdnclwl TOTAL TASK ManaWrl Ineetr t3npl.eer A.KeT.SMIEd K.Wa88oaP yaw TASK LABOR n .aK a 1 oh $57.89 $51,88 $45x7 128.88 POURS COST 1 PRELIMINARY ENOINEEMNO 1.1Ptotw( (and Pr.ct ACmiNsir.9on i.1:! Oct wht•tPre"nory En maul Phaas IAA t AdrNNshittion• .11M.P =,..Mg Phan. - $ 1.2 Parf-O.oWSmlad YI dl.. 12.1 PLpMVbft.FaundMbn RaI,11 PW Ser a $ 1.2.3 xa O.oloMicd Oval n Ra 1.3 Pof-sail curve r !r.menlY lM, E.,I-I., 2 PHASE 1:FINAL DESION 2.1 eclM .nwnl and. 'wl Admh4.ttaticn 2.1.1 act M amen(-Flntl Dtm n Ph... 24, l 24 1,384.62 212 Pr .4l Ad W.trallan•Plod D-[,n Ph... ?6 16 32 18$`7.86 2.2 Pr -R..1 plan. 22.1 P.Ir-30%Dwgn PMerm 65%Da Dan - $ 2.2.3 PMarm 90% n n - $ 2.2.4 Perform FttaWatlon Rwhaw - S 2.3 Pr in0allan. - $ 2A P OUPNinaa erw E.6mdea S 2.5 I ant Rouleau aF SirucWan 50 4?8 264 =302 2.6.1 Road Plan R.viaw 2.6 Fintl U 8n $Eieelned Dew 2.T lt140%And PS$E hoes otal 9 2 Total Pr.ilminary EnhIs.0n9 and Phw.1 9 6d Eaumot.d atf t Coat. Total Olrxt latex $ 33,431.73 Type of E.pen.. AMwtmt AMklpld d R.I..@ 0.0% $ 2xp.rl.e 1: Two! S 500.00 Ad)wted Total Labor $ 33,431.73 E.penae 2: $ - UpPiee 3: $ - Canbi-d 8urdan F OveMa.d 172.0% $ 57,502.57 E.p-4: $ - Total Coal $ 90,934.30 E.pen..5: $ E.Pen..6: $ Total 00-URewt Coal. $ SC0.00 E.p .7: $ - F. @ 10.0% S 9,093.43 Up-H: $ O A 100, .M2 3 PNASE It:CONSTRUCTION SUPPORT 3.1 wm 3AA .cma -Canahuclim Phwa 1 MA3.7.2 PvLdAdminlnnllon-Conalrue9ml Phew 1 #N/A 32 Lnm to Conireetorl #MA 33 P.rrwm Coretrudlon Dasi.,8 3.3.7 Rew #NIA 332 Pr tl.(GRIPS) *WA 3.3.3 V11 t AM 3.34 u Pt-flw clime #MA 11 3.3.5 bald:Aa-9uiN PIPs. tMVA Total # Total Ph..11MA Eellmated Do..t Call TOW Di-t Labe #MA Type of Expenea Amount A,.1Wp.ld Rai..n Expos.1. $ - Adfueted Total Labor #NIA Exp.n.a 2: $ Expense 3: $ - Cpmbinad Sudan+Ovnhaed #N/A Eva-4: $ - Total Coal #MA Expanw 5: g - E.peme6: $ - Total Other M-1 Coati $ - E.pene.7: $ - Fee @ 12.0% #MA Pxpenaa B: $ - TOTAL COS ..IA 4 PHASE NI:OPTIONAL TASKS 4.1 1 1 #WA 4.2 #N/A Phee.i ole #N' Total Ph..III #N/ Es(Sneiwd Direct Co.i. To Dveni Lobo, #NIA Type of Exp.n.a AMKnmi Anticipated Rai- ap.nao 11 $ - Adl..ted Total Labor MA E.pen..2'. $ - E.p-.3S - Combl-d 8-6e 6-Overhead *N/A Exp.ne.4 $ Total Co.. #N/A E.penes S. 3 E.penas 6: $ - Total OtMr Dirs.t Coat. $ - E.pan.e 7: S Fe.Ca` 12.0% #NIA Expen.e e: E TOTALCOST #N!A Pape 3 of 9 I-Nw..TW Ov.ra kv Prgwt No,0662.688078 R.. PMdpd M �aA-' A 1 AdmM TOTAL TANK O-m R.0a-I T.Yam A-X.Wr Cdwss TASK LABOR r i.b.aC w.19 was i]t.ib 4]&ta NCfJRa Wei 1 ENOINE fNO 1.4 E andP,.It AdmlN.lr.San f.1.1 .d f•0h.fktiW IrxYbrf Pha.a },},2 wt AdmiNetrdWn- Im. PXna - 1.2 �rAarm f4adwl.aad Ludas 121 Fra- a Brl Fmmobiimv and a •. 1.2.2 P bre a.okCnnWet Lbe t $.. t. 3arcxrnts of 2 PHASE b FINAL O€6 GN 2.i pr wt Mbn aM 'wl Adndniabader. 2.1.1 !Llan -FWd Caa phaaa 25 1d T 42 1264.66 2t.2 -AdmlN llp bp.-Find O. n Ph... t6 t0 7 32 27266 2.2 Pr R 3]lan 22.1 Farfwm 30"0 .12. 20 26 180 236 S 6 817.44: a.22 psH'wm86%0hd 10 10 36 70 126 5 4234,63 2.2.3 Pa11-20%0.a1 6 4 30 1 40 1 S75.26 2.2.4 P.I-fo..AWWn RW- _ $ 23 Pr '0edlone 2.4 Pr. ta,wd6ae And E.tlrrwtw _ $ El Find -' tl &EIwUVad - $ v i Mea 6fa Total Prafthla y Engin rbq and Ph-f r 20L-- 512L%ill.297.ml 1 Tdid Mm Labor $ tS,297.05 Typ.at Eapan.a A-t A.WpW.d RW-.Q 0.0% $ Exp.ru.1: Ptindtq $ llwoo Adjaead TeW LWor 5 iD,287.05 Exrybrrsa 2: Ma�terida s 400.00 Expama3: $ - tomb,,d6woan.Ov head 155,5% S 28.17460 Exp.no.4: $ - Total Cael. $ 47,471.69 Fxpenw 5: $ EIN.n•a S: 5 Total ONMr Oirwf Cabs 5 900.04 Expan.a 7: $ F..0 12.0% $ 5,698.60 Exryme 6: $ 3 PRABE h:OON R_IMTION 6UPPORT 3.1 RO Man I aM wt AaNNelr.San 3.1.tP, dAra t•Cwutrudlon Phn. AWA 3.1.2 Pr:..AdB .trod--ConxaudbmPh.. - AWA 3.2 -a 15 CmnlraoWr AWA 3.3 Corrkuodm - n IIA 3.3.5_ vatw. ' Pi- 3.3.2 ."Coat Radudlan InesncXrt Pr da CRIPS - AWA 3.3.3 Proolde Twwd" -t #WA 3.3.6 salew eqd Npitc b or Pat"I.1 l3drn. AWA . ahaWWA Total Total Ph..it Total Dad Lb6w AWA Typs of E p.- Amnt A.WdP.tw Rdsaa Expanse t: $ Adlu.iw TOW I." AWA Expe-a 2: $ Eagnse 3: $ - C-b d Burden-O.head tJ AWA Exp.ns.4: 5 - Total Coal. AWA Eap.n.b 5' $ Expansee: 3 Total Odur OB..t Coal. s Exp-7: $ F..Q 12.0% AWA SWA 4 P1M9E tli: OVAL.TAMM 4.t AWA Total Ph..111 Eedmdw buwt Cods Total Ckwt Labor AWA Typ.ot Fnpanw AJnaunt ArWdpdw Rd.. -Elt- t: 5 Ad}uated Tatot Lahw AWA Eupens2: It c� Pxpe..:3: $ - C "-d Surd.n+0rbrhew t_ AWA Expata.4: $ Total C 1. AWA Expana.5: $ EXP2.6: 5 - Taal Oti-Otroat Coal. $ B 4wn.e 7: $ - Fa. 12.0% AWA Eq.-a: $ L TML COST AVA No.4019 .ren Horne Tre6 Oinnoseap Proleci No.OE82.6R4075 I-Ifiaml- ets Predxl Man� aeoa CAD Cp . A- TOTAL TASK PM SiW I K.W..pN K.011i.apl. K.GS P. TASK LA0Op ea'1 iiort S4t.98 525.5) S2i.82 $15.22 HOURS COST 1 PRELIMINARY ENGINEERING t.i eoi rtxnt end Pr ACmIN,6Wlon 1.1.1 act m.ni-Prwiminar t-lng Phiea 1.5.2 act PA19.1.6wion- efimin E n.eH Phase L2 P.rfann GaotachnWd,lutlly 1.2.1 Pp-Bri a FouMallon Re rt and Boring. $ 1.2.2 Prs-Gsot,WmmW De, .Rp,,t 4.3 Pot•tiWtrg sutvay reyUlrem8nt5 ro fml- n.n! of 2 PHASE I:FINAL DESIGN 2.1 St imaN entl Pro..I Atl" .1, Ion 2,i,i otM amen!-Finn Dai Phas. 6 44 50 $ 5,384.97 2.1.2 .1 Ad.INM .0 -Ftnal Da.l n Ph.. i6 16 243.52 22 Pr tPtanc 2.2.1 PW-30%Gee n 13 28 47 88 2260.69 222 PMorm SS%Ca. n 10 PB 41 79 s 2W9A8 22.3 Pulorm 90%Dap n 10 25 m 34 69 S 1782.64 2.2.4 Perform F..W.11on R-1- S 2.3 R 'Winne - $ 2A P-.C-ffiw.and Ea19n.tea - f x.d I R-f-of 96u.1ur.2 2.5.t Reed Plan Revlew - S 2.8 FlnW Srido Uchtlu bai n 2.7 sand Submll 400b Elae61CW.,PBbE 10 26 20 6 64 1.853.08 of 8 4 366 Ll e. Al TWO Pta9minary E.Vin Mg end Ph..1 49 1 M 122 1 221 396 JS 9,3741 Ewlmwed t79ect Coat. To:W Direct Leber S 9,334.41 Type of Expanso Amount Anddpdad Rw,es @ 0.0% $ Et: Pnnane $ 1,5WW. Adluette ed TaLmib.r S 9,334 spana. 41 Fxpene.2: fMlarlws $ WO.W sns Eeps 3: Communi.di-beow $ 500.W Cumbined burden.CWerh6ed 193.3% 3 !8,048.32 Eapon,e 4: $ TOW C-N S 27,360.32 Expense 5: S - Expen.a 6'. $ - Totel Ottw Divot Costa $ 2,400M &Penst 7: $ - F.0 12.0% S 3.285.7! EKpan,a 8 $ TOM EOST 1 33,155.85 S PHASE O:CONSTRUCTION SUPPORT 3./ ant Man men!end pr 1 AdmJN,lra- 3.i.1 Pr act meat-C.-I-I-phew mmmmmm AWA 3L 12 xi AMNM.I Nion-C-tn W7 Peas. �tlA 3.2 Remo W to Cont-(.i l.s - #WA 33 P.0-Cansoved nOe. rt 3.3.5 Rw44w Plone AWA 3,3.2 Ravlew Coat RatluoBan IncenlWe Pr awe CRips) XWA 3.•.3 P-d.T.W".al Bu I AWA 3.3.4 A-1-Brei AnW No".of PWaNiw ClWms - #INA 3,3. OWMAs-ulit Pians AWA hen ore A' Told Ph..11 8NlA Eallmaled Dlreel Ccal, ToiW Direst Lwwr MA Typ.M Expen,a Amount AnlWpaed RWso. Eapanea t: S - Adiu.ted Thal Lebo, AWA ZIP-2: $ EKMnee 3: $ - Cc wred&edan r Omh-d E::= AWA EKpwt 4: S - Totd Costs AWA EKpatMe b: $ Eagnea 6: $ - Tntw Ofbr Direst Coate $ - llv-e 7: $ Fes @ 12.0% MA axpan.a 8: $ - C 8 A A 4 PHASE fit:OPTIONAL TASKS A.1 AWA 1.2 AWA Ph...III our MA Tote]Ph..ill I ONl Wl..WE MINI Cos(* T.W Greet I"- MA Type of Eep.. A-i AnYtWpslad RW-.Expense 1: S - Adjusted T.W L.&or MA Expanse 2: S �t Enpen.o3: $ - C-blh dMld na Overhaod ��.--s, AWA Expene.4: $ - T.W Co.,. ANIA Expense 5: $ Exp.n.a fi: S - TOtN Oth.r D6ad Coa4 $ - Expamu 7: $ - Fe.a 12.0% AWA Expetrra 9: $ - A COST A,A Pepe SIX 9 _ Imn Pions Trail OvsrawNn$ Profad No.6$824tRAd73 ee iwn 8eda Man.9ar/ CAW Aeaya TOTAL TASK Arwdsta Eigl- Taannla$R TASK LABOR R.Rase J.Hkaa M..blv�.naa J.Plarinary a t Satu W." Amu $29.W HOUR. CWT 1 PREUMINARY ENOINEERINO 1.1 satM end PIRLtAdn lfttl a 1.1.1 2dm mmi-PrallmiRtw Phan 1.12 got Adnlidaks0on- Ptws 12 Partain OedwMl atudu ---1:2.1 Wit 8 FdxdsUon Md Bei 1.2.2 oroOaakandpel[iea' $ f.3 Pat-haU sury rras+an7F 3 PRAS9 1t FINAL MIEN 2.1 a .and Pt,*(Aar9Nakeifan 2.1.1 W Man •rift p"o Phan 15 a 23 1,129,75 2.1.2 W AftW l e9on-Final Deal n Phu. t8 M 5 418.09 2.2 ftiLttLpow plow 2.2.1 P.-h--30%Nitta, S 2.21 Pafa 85%Oeal 28 W 20 103 S 4190.20 2.23 P d.-9U%Cept n 12 24 12 48 1857m 224 Pvfam F-dm-Realm - $ 2.3 -8asd5o.tmos 2.4 Pf -..Ckrrt9Uaa and EeUmHes - $ 25 i R.1-of 81-1- 2.5.1 kuduraa2.5.1 Road Wan Review $ 2.3 Fillw 9L60WINA FJad 5 3 $ b 2A- .40 =Bnm1i1OaFi Total Preliml..y EnphesWq aW ft-i 6eU lugod DOW Coda T.W drool Lw- $ 8,551.95 Type d€.penis Amount AMidpal d R.1-C 0.0% $ Eapenu is T-: 5 woo AdjoatW Tetd Leber $ 8,881.95 E.p4Res 2. RaprWuclial $ 130.W 'p-3: Mall $ 100.00 Can,N-d Sudan a0-f-d 552,tl°i $ 13.044.58 Eap..4: S - Tad C.W 5 21,520.51 en Fxpu 5: $ Eapsnao 8: $ - T.W Other Dirm Ga% It 300.00 E.Penes 1: $ Fait @ 120% $ 2,595.13 Expanu 5: $ - TOTAL COST 3 PHASE It!CONSTRUCTION SUPPORT 3.1 PLbied Mwastwartl and Pr a"od Ad"Nstrdisn 3.1.1 Pr ad to .1-C n jf=tlan Phone #WA 3.1.2 - AdrNNWMi r,•Cone0 a-Phsu pWA 32 Ras d Contradar J. UUu - pWA 3.3 Partsrm CmalrucUan deal t 3.3.1 R.W. Pirw pWA 3.3.2 FWCast RW-.cbm 1-w* alaC.RIPS pWA 3.3.3 P-ld.T-�,MW 4uppwt pWA 3.3.8 Rwim ea1An o*.H.-d Pd-W D.1- pWA 3.3.5 bel A.•8u3t Plane pWA Tetsl Phu.U E.UmetW dyad CoetF Tslet 14-t Lb. pWA Typ.dEapanu Amount AMidpdad Rise Expense t: S Adloe<W Teta]Leber pWA Eapanaa 2 S - Eapsnss3: $ CmWwd flw&n+Overhead 0 WA ap-4: $ - T.W Cael. pWA Eapanee 5: It Eapsnu 3: $ - T.W Other Oiraol Coate $ E.penes 7: $ - F-0 12.0% pWA C7777782rWr ON=] Eapenas 8: $ 141 PHASE III:OPTIONAL TASKS 4.1 NWA 4.2 pWA Paas III T.W - - - - - ToW Pheas Iii p Eetim-sod droll Coat. Tela)Dir-t Leber *WA Type dE".. Amaunl AMIdPMW Rid- E.I.-1: b - Ad)uet d T.WLabor pWA E.peMe 2: $ - FxPsnae3: $ - Combkrod H-len+OsW..d ® IOWA Eap..4: 5 - T.W O.W. pWA Enpeeu 5: $ - zapanae 3: $ - Tdal OIMr street Cwts $ Expenes 7: $ Fee@ 12.0% NWA E.pehea 5: $ - TOTALCOST p Pepe 3 d s Iron Horse Trail Overcrossing Project No.0662-6R4078 Robert Y Chew Geotechnical, Inc. Client: Arup/Contra Costa County Public Works Department Task: Geotechnical Site Investigations Location:Iron Horse Trail near intersection of Treat Boulevard and Jones Road,Pleasant Hill Project: Iron Horse Trail Overcrossing Phase is Final Design Preparation Field Engineering/ Office Engineering Exploration UNIT PERSONNEL RATE HOURS SUB-TOTAL HOURS COST HOURS COST HOURS COST 1 Principal 130 4 $520 $0 0 d 520 2 Project Engineer 90 48 $4,320 14 $1,260 28 $2,520 6 $540 3 Asst.Project Engineer 85 0 $0 $0 $0 $0 4 Staff Engineer 85 8 $680 $0 2 $170 6 $510 6 Technican 85 0 $0 $0 $0 $0 6 Engineering Draftsperson 85 0 $0 $0 $0 $0 7 Clerical 60 01 $0 1 $0 $0 1 1 $0 LABOR+OVERHEAD+FEE 60 $5,520 $1,260 $2,690 $1,57C OTHER DIRECT COSTS 1 Drilling Permit $300 2 Street Excavation Permit $200 3 Utility Clearance $500 4 Concrete Coringt $760 5 Traffic Control/Lane Closure $1,500 6 Drilling-2 days $2,730 7 Drilling Supplies $500 8 CPT-Day $3,200 9 Cutting Disposal $1,370 10 Handling fee{5%} $550 12 Field Vehicle $280 TOTAL OTHER DIRECT COSTS1 $11,890 TOTAL r $17,410 Page 7of9 Iron Horse Trail Overcrossing Project No.0662-684678 Signet Client: Arup/Contra Costa County Public Works Department Task: Soil lab tests Location:Iron Horse Trail near intersection of Treat Boulevard and Jones Road, Pleasant Hill Project: Iron Horse Trail Overcrossing DIRECT COSTS 1 Corrosion tests $200 2 Moisture content tests (30) $600 3 Sieve analysis(10) $650 4 Compaction tests(4) $660 5 Triaxial UU tests(8) $640 6 Direct shear tests(12) $1,320 7 Consolidation tests(4) $900 TOTAL $4,970 Page 8 of 9 Iron Horse Trail Overcross(ng Project Na.0662-684478 APPENDIX B --Staff Rags* and O.D.C. Rates ., ARUP �~ _�.�.AAUP-ODC Rates Position Name Fully Loaded Rate item Rate Comments Principal J.Eddy $20087 Travel Project Manager I.Barandiaran $153.31 Mileage 36.5 cents per mile Senior Reviewer A.Low $183.46 Car rental $60 per day,estimated Senior Reviewer M.Wilford $254,58 BART $0.30 SF-Ploasant Hill roundtrip Project Engineer 111 $1004110 Reproduction Project Engineer if $76-$100 Plotting $750 E6 full-size sets per submittal Project Engineer i $48-$76 Postage I Civi Engineer 11 $130-$135 Fadex $19 Bay Area letter,estimated CIA Engineers $1004110 CAD Support j Electrical Engineer $90-$100 Drafting contractor $37 !per hour,outside contractor Sr.Geotechnical Engineer D.Koutsoftas $246.96 j t Geotechnical Engineer I i $864116 Cadd Technician j $85-$100 Admin E $54-$65 SC Solutions Position Name ~� Fully Loaded Rate Principal A,Krimotat $172.62 Project Manager T.Ballard $172.62 Project Engineer F.Waggoner $136.65 Project Engineer jJ.Lee $65.64 DMD Architects Position Name Fully Loaded Rate Principal Don MacDonald ; $174.35 Project Manager R.Gannam $90.63 Project Architect T.Yam $62.63 Project Architect A.Kotler $105.63 Admin S.Johnson $6$.67 SFE Landscape Architects Position Name Fully Loaded Rate Principal Phil Singer $136.00 Project Manager IK.Gillespie $86.00 CAD Operator (K.Gillespie $70.04 1 Admin JK.Gillespie $50.00 Fehr&Peers Position Name Fully Loaded Rate Senior Associate R.Rees $165.53 Engineer J.Hicks $88.20 CAD Operator M.Johnstone $84.97 Admin J.Flannery $73.38 'The Staff Rates Shown herein are for the time period June 1,2004 to March 31,2005.The rates may be adjusted annually on April 1 to reflect ARUP's adjustments to individual compensation.Such annual adjustment shall be equal to ARUP's actual changes in hourly rates.Prior to a change of rates,and prior to each subsequent annual change,ARUP shall give the Public Agency at least 30 days advanced written notice of the change.In no case should the average of all adjustments in a given year Mil exceed five(5)percent,or an individual adjustment will exceed eight(8)percent. Page 9 of 9 REVISED APPENDIX C -- Key Personnel and Subconsultants ARUP shall assign to this contract the following key personnel including key subconsultant personnel: Name Position Firm Principal J. Eddy ARUP Project Manager 1. Barandiaran ARUP Senior Reviewer A. Low ARUP Senior Reviewer M. Wilford ARUP Project Engineer ill A. Thompson ARUP Project Engineer III A. Mole ARUP Project Engineer ii S.Wren ARUP Project Engineer 11 C. Cho ARUP Project Engineer I J. Pisano ARUP Project Engineer I M. Coats ARUP Civil Engineer It J. Karn ARUP Civil Engineer II P. Thompson ARUP Civil Engineer I G. McInnes ARUP Civil Engineer I E. Lam ARUP Electrical Engineer J. Edling ARUP Sr. Geotechnical Engineer D. Koutsoftas ARUP Geotechnical Engineer A. Kammerer ARUP Geotechnical Engineer M. Sabbagh ARUP Geotechnical Engineer A. Pena-Iguaran ARUP Principal A. Krimotat SC SOLUTIONS Project Manager T. Ballard SC SOLUTIONS Project Engineer F. Waggoner SC SOLUTIONS Project Engineer J. Lee SC SOLUTIONS Principal Don MacDonald MACDONALD ARCHITECTS Project Manager R. Gannam MACDONALD ARCHITECTS Project Architect T. Yam MACDONALD ARCHITECTS Project Architect A. Keller MACDONALD ARCHITECTS Admin S. Johnson MACDONALD ARCHITECTS Principal Phil Singer SFE LANDSCAPE ARCHITECTS Project Manager K. Gillespie SFE LANDSCAPE ARCHITECTS Senior Associate R. Rees FEHR& PEERS Engineer J. Hicks FEHR&PEERS CAD Operator M. Johnstone FEHR& PEERS Admin J. Flannery FEHR& PEERS In the event that ARUP desires to replace any of the above-listed key personnel, ARUP shall provide the Public Agency a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any other additional information requested by the Public Agency. Proposed substitutes shall have comparable qualifications to those of the persons or firms being replaced. The Public Agency shall notify ARUP within 7 calendar days after receipt of all required information of its decision regarding the substitutions. Page 1 of 1