HomeMy WebLinkAboutMINUTES - 09212004 - C.14 TO: BOARD OF SUPERVISORS Contra FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR `� OStc DATE: September 21, 2004 sTA---------' County SUBJECT: APPROVE and AUTHORIZE Project Contingency Fund Increase for the Buchanan Field Airport—Electrical Upgrades & Sign Installation Project, Project No. 4855-4685-6X5307, Concord area. District IV SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: APPROVE and AUTHORIZE project contingency fund increase of$20,000 for anew total of$99,128.50 effective September 21,2004 in order to compensate the contractor, St.Francis Electric, for electrical,signage,&plumbing work. FISCAL IMPACT: The project contingency funds are currently insufficient to cover the increased cost. The increase in contingency funds will be funded by 90% Federal Aviation Administration, 5.5% Airport Enterprise and 4.5% CALTRANS Funds. Continued on Attachment: Z SIGNATURE: -` -' RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF BOARD COMMITTEE [APPROVE ❑ OTHER St GNAT URE(S): t a � ' ACTION OF BOA ON SEPTEMBER 21, 2004 APPROVED AS R� COMMENDED JX OTHER ❑ VOTE OF SUPERVISORS ) I hereby certify that this is a true and correct copy of an action xx UNANIMOUS(ABSENT NOiVE AYES: NOES: taken and entered on the minutes of the Board of Supervisors on ABSENT: ABSTAIN: the date shown. MCcrosn G:\GrpData\Const\BO\2004\Approve Contingency Aiport.doc ATTESTED: SEPTEMBER 21, 2004 JOHN SWEETEN,Clerk of the Board of Supervisors and County Orig.Div:Public Works(Construction Division) Administrator Contact: Mike Carlson (313-2320) cc: County Administrator Auditor-Controller Public Works By Deputy P.Edwards,Construction Design Transportation Engineering Contractor SUBJECT: APPROVE and AUTHORIZE Project Contingency Fund Increase for the Buchanan Field Airport—.Electrical Upgrades & Sign Installation Project, Project No. 4855-4685-6X5307, Concord area. District IV DATE: September 21, 2004 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: Additional funding is required to increase the contract contingency amount to pay for contractor extra work items, the extra work items were the result of unforeseen site conditions in the control tower electrical and plumbing systems, replacement of existing taxiway lighting wire due to deterioration, changes to the location of existing signage as required by the Federal Aviation Administration(FAA)and potential fixture relocation ofsignage by the FAA after their final inspection to be performed at a later date. Approval of the contingency fund increase is required to compensate the contractor for the additional work. CONSEQUENCES OF NEGATIVE ACTION: The lack of approval would prevent successful completion of this contract and preclude payment to the contractor for required work.