Loading...
HomeMy WebLinkAboutMINUTES - 08052003 - C.23 C.23 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on AUGUST 05, 2003 , by the following vote: AYES: SLTERVISORS GIOIAA, UILKEMA., GREENBERG, GLOVER AND DESAULNIER ABSENT; NONE ABSTAIN: NONE SUBJECT. JOINT EXERCISE OF POWERS AGREEMENT BETWEEN THE City of Brentwood and the Contra Costa County Flood Control. and Water Conservation District for improvements within Deer Creek Channel and Basin in Brentwood (Drainage Area 105) (District III) Project No. 7590-6D8481 RELISTED: RELISTED ON SEPTEMBER 09, 2003 1 hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. Attested: AUGUST 05, 2003 John Sweeten, Clerk of the Board Of Supervisors and County Administrator By.--/M4r .� eputy Clerk TO: BOARD OF SUPERVISORS,AS GOVERNING BOARD OF CONTRA COSTA COUNTY AND CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM MAURICE M. SHIU, CHIEF ENGINEERC . DATE: August 5, 2003 SUBJECT: Joint Exercise of Powers Agreement between the City of Brentwood and the Contra Costa County Flood Control and Water Conservation District for improvements within Deer Creek Channel and Basin in Brentwood. (.Drainage Area 105)(District 111)Project No. 7590-6D8481 SPECIFIC MUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and AUTHORIZE the Chair,Board of Supervisors, to execute a Joint Exercise of Powers Agreement (JEPA)between the City of Brentwood(City) and the Contra Costa County Flood Control and Water Conservation District(District)effective August 5, 20103 until completion of project for financing and constructing a joint project consisting of a drop structure, channel and pedestrian improvements within Deer Creek Channel and Basin,Brentwood area. (Drainage Area 105)(District M) ti. Fiscal Impact: There is no financial impact to the General Fund.The estimated total,cost to the District is$29,525, which is to be paid from drainage area fees collected on new developments within Drainage Area Continued on Attachment: X SIGNATURE: ._ RECOMMENDATION OF BOARD COMMITT APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS UNANIMOUS(ABSENT l AYES: NOES: ABSENT: ABSTAIN: EW.cd G:\OrpData\F1dCti\Adtninistration\BmdOrders\2003 BO\Brentwood I hereby certify that this is a true and correct copy of an action Deer Creek Drop JEPA 8-5-03.doc taken and entered on the minutes of the Board of (Trig.Div: Public Warks-Flood Control Supervisors on the date shown. Contact: .Eric Whan(313-2242) cc: County Administrator ATTESTED: County Counsel County Assessor JOHN SWEETEN, Clerk of the Hoard of Supervisors and County Treasurer-Tax Collector County Administrator County Auditor/Controller Public Works M.Avalon,Deputy Public Works.Director By , Deputy Accounting SUBJECT: Joint Exercise of Powers Agreement between City of Brentwood and Contra Costa County Flood Control and'Nater Conservation District for improvements within Deer Creek Channel and Basin in Brentwood. (Drainage Area 1135)(District III)Project No. 7590-6D8481 ]:SATE: August 5, 2003 PAGE: 2 H. Fiscal Impact(continued): 105. This amount includes$23,620 for consultant services to prepare final plans,specifications and estimate for the Deer Creek Basin drop structure.A 25%contingency of$5,905 is included in the total to cover City of Brentwood costs associated with the administration of the consultant services contract, and inspections and material testing performed by the City during construction.For District items of work,actual costs that are determined upon completion of the consulting services contract to exceed original estimates are the financial responsibility of the District. III. Reasons for Recommendations and Background: The Flood Control District desires to remove an existing drop structure from Deer Creek Channel into Deer Creek Basin and replace it with a new gabion drop structure as called out on the District's Drainage Area 105 plan for Deer Creek Basin.The City of Brentwood desires to construct a new pedestrian trail connection down into Deer Creek channel and under Apple Hill Drive to allow an existing trail along Deer Creek to be continuous and unimpeded. Blackhawk Services Company constructed the improved.beer Creek channel in its present alignment as part of their adjacent subdivision work. This work was not done per the approved drainage area plan and was therefore never accepted for maintenance by the Flood Control District.Channel modifications,including minor regrading,are needed to correct inadequacies related to capacity and stability within Deer Creek upstream of the drop structure and basin. Because of the proximity of each agency's desired project,the City and District decided to enter into a JEPA whereby both agencies could realize a savings in time and costs for design,permitting and.construction.The Agreement designates the City as lead agency with the responsibility of entering into and administering a consulting services agreement for preparation of joint project plans, specifications and estimate.The City will initially pay all costs related to work performed by the consultant.Upon execution ofthe Agreement,the District will deposit with the City, funds equivalent to the estimated cost of work to be performed by the consultant with respect to the gabion drop structure as well as a 25%contingency.The District will provide technical support and review and approval of final designn plans, specifications and estimate. B lackhawwk Services Company has agreed to perform the work necessary to correct the Leer Creek channel inadequacies since this work was a condition of approval of the original subdivision approval. Since this work is in the immediate vicinity of the projects desired by the City and District,Blackhawk has also agreed to construct the,gabion drop structure and pedestrian path projects in conjunction with their required work. The final plans,specifications and estimate prepared by the City's consultant will be provided to Blackhawk so that the various project components may be bid and constructed as one. The District will enter into a separate reimbursement agreement with Blackhawk, in accordance with the District's adopted Reimbursement Policy, for costs related to construction of the gabion drop structure. IV. Consequences of Negative Action: If the District does not enter into the JEPA, the improvements will not be built and the District will not realize any cost benefit by having the three projects bid and constructed as one. JOINT EXERCISE OF POWERS AGrREENIENT BETWEEN CONTRA COSTA COUNTY FLOOD CONTROL AND WATER,CONSERVATION DISTRICT AND CITY OF BRENTWOOD 1, Partes: Effective on ,2003,the CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, a political subdivision of the State of California, hereinafter referred to as"DISTRICT",and the CITY"OF BRENTWOOD,a municipal corporation, hereinafter referred to as"CITY",pursuant to Government Code Section 6500 and following,mutually agree and promise as follows: 2. Purpose and Scope of Wo : The DISTRICT and CI'T'Y desire to construct a joint project consisting of a gabion drop structure within Deer Creek.Basin and channel and pedestrian trail modifications within Deer Creek channel(hereinafter referred to as"PROJECT").An existing drop structure will be removed and replaced with a new gabion drop structure from Deer Creek channel into Deer Creek Basin as called out on the DISTRICT's Drainage Area 105 plans for Deer Creek Basin. The pedestrian trail modification will be constructed from the top of bank of Deer Creek channel down into the channel and through the existing Apple Dill Drive culvert to allow the existing trail along Deer Creek channel to pass under Apple Hill Drive unimpeded rather than at grade and across a private road. Channel modifications,such as minor grading,will also be performed to correct inadequacies related to capacity and stability within Deer Creek channel upstream of the drop structure into the basin. The purpose of this agreement is to provide for joint construction of the PROJECT and the apportionment of PROJECT duties and costs between the DISTRICT and the CITY. 3. Resvonsibilities of CITY and DISTRICT: A. The CITY shall perform the following activities: 1) Act as lead agency to manage and implement the PROJECT. 2) Enter into and administer a consultant contract with Berryman&Henigar,Inc. (hereinafter referred to as"CONSULTANT")for the scope of work as outlined in the report titled "Revised Proposals for Deer Creek Channel Modifications&Trail Extension and Gabion Drop Structure"as revised on September 3,2002(hereinafter referred to as"REPORT), attached hereto as Exhibit A and incorporated herein,and as sumnim ized below: a) Project management b) Data collection,utility research and survey work c) Hydrology/hydraulics studies d) Channel modification and pedestrian trail alternative selection and preliminary design e) Preparation of final plans,specifications and estimate f) Provide support during bid solicitation, contract, award and construction 3) Provide information as requested by CONSULTANT and review and comment on all submittals prepared by CONSULTANT in a timely manner. 4) Consult with the DISTRICT on proposed channel modifications and pedestrian trail alternatives developed by CONSULTANT during preliminary design. . t J 5) Review and accept final plans, specifications and estimate prepared by CONSULTANT after approval of the final plans and specifications by DISTRICT's governing.body. CITY shall submit final plans,specifications and estimate to the DISTRICT for approval by the DISTRICT at least six(6)weeks prior to acceptance by the CITY.The CONSULTANT's estimate for the PROJECT shall be submitted to the DISTRICT in a format that provides line item costs for the gabion drop structure and for the channel and pedestrian trail modifications. 6) Submit accepted final plans, specifications and estimate to Blackhawk Services Company (hereinafter referred to as"BLACKHAW")who will be the responsible party executing an independent contract to construct the PROJECT. 7) Require BLACKHAWK to submit to the CITY a bid(s)for the PROJECT work for review and approval, including a minimum of three(3)bids for the gabion drop structure portion of the PROJECT. CITY shall forward bids to the DISTRICT for review and written approval of costs associated with the gabion drop structure worn prior to the stark of work by BLACKHAWK. 8) Perform all materials testing and inspection required for construction of the PROJECT. 9) Consult with the DISTRICT on all modifications to the plans, and submit all contract change orders or extra work items related to the,gabion drop structure that exceed a ten percent (10%)contingency for the gabion drop structure portion of the PROJECT(contingency based on contract construction cost of the gabion drop structure as approved by the DISTRICT)to the DISTRICT for review and written approval by the DISTRICT prior to BLACKHAWK initiating work on the contract change orders or extra work. 10) Upon completion of the PROJECT by BLACKHAWK,the CITY and DISTRICT shall conduct a final joint inspection of the PROJECT.After the DISTRICT has determined and provided written notice to the CITY that those portions of the PROJECT to be reimbursed by the DISTRICT to BLACK.HAIX (i.e. gabion drop structure)have been completed to the DISTRICT's satisfaction,the CITY shall accept the PROJECT as complete for itself and the DISTRICT. 11)Enter into a flowage and access easement with the DISTRICT in accordance with Section 6.13. below. 12) Amend the"Temporary Right to Enter and Use Flood Control Property"agreement between the City and DISTRICT in accordance with Section 6.C.below. B. The DISTRICT shall perform the following,activities: 1) Provide information as requested by CONSULTANT and review and comment on all submittals prepared by CONSULTANT in a timely manner. 2) Consult with the CITY on proposed channel modifications and pedestrian trail alternatives developed by CONSUL'T'ANT during preliminary design. 3) Review and comment on draft plans, specifications and estimate prepared by CONSULTANT. Comments on draft plans,specifications and estimate shall be submitted to the CITY within two(2)weeks of receipt. ve tf 4) Within two(2)weeks following receipt of bid information from the CITY,DISTRICT shall review and either approve or disapprove, in writing, costs associated with the gabion drop structure work submitted by BLACKHAWK. The determination of eligible construction costs will be based on at least three(3)independent bids. Upon DISTRICT acceptance of the bids, in writing,the lowest bid shall be the basis for determination of the credit and reimbursement amount. The DISTRICT reserves the right to reject the submitted bids or any other proposed value of eligible costs and to calculate costs and the fixed markups using current prices. If BLACKHAWK elects to install a more costly system than as shown on the approved plans, the DISTRICT reserves the right to calculate eligible hosts using current prices for only the facilities shown on the adopted plan. S) Issue a DISTRICT encroachment permit to BLACKHAWK,upon BLACKHAWK°s proper application and satisfaction of all conditions for issuance of the permit,to allow BLACKHAWK to construct the gabion drop structure component of the PROJECT on DISTRICT right of way. 6) Consult with the CITY on modifications to the plans,change orders or extra work related to construction of the PROJECT. DISTRICT shall review and provide written approval or disapproval of contract change orders or extra work submitted by BLACKHAWK related to the gabion drop structure that exceed a ten percent(10%)contingency for the gabion drop structure portion of the PROJECT(contingency based on contract construction cost of the gabion drop structure as approved by the DISTRICT)prior to BLACKHAWK initiating the work on the contract change order or extra work. Should the DISTRICT disapprove of any changes to the plans, change orders or extra work related to the gabion drop structure portion of the PROJECT and the changes are made or work performed,the DISTRICT will not be responsible for reimbursement of any of the costs associated with the work. 7) Upon completion of the PROJECT by BLACKHAWK,the DISTRICT and CITY shall conduct a final joint inspection of the PROJECT. After DISTRICT has determined that the PROJECT has been completed in accordance with the approved final PROJECT plans and specifications,DISTRICT shall provide written notice to CITY of its approval of the PROJECT.The DISTRICT shall not unreasonably withhold or delay its determination of PROJECT completion provided that the work is performed in accordance with the approved final PROJECT plans and specifications. 8) Upon satisfaction of the conditions set forth in Section 6.13. below,accept the dedication of Deer Creek channel on the terms set forth in Section 6.B. 9) Enter into a flowage and access easement with the CITY in accordance with Section 6.13. below. 10) Amend the"Temporary Right to Enter and Use Flood Control Property"agreement between CITY and DISTRICT in accordance with.Section 6.C. below. 4. Financial Responsibility. A. PROJECT Costs. The CITY shall be responsible for all costs associated with the channel and pedestrian trail modification component of the PROJECT and the DISTRICT shall be responsible for all costs, as determined in Section 3.8.4)above, associated with the gabion drop structure component of the PROJECT. 1) CONSULTANT Contract Costs. CITY and DISTRICT acknowledge and agree that all costs for work performed by CONSULTANT as outlined in the REPORT for the PROJECT shall initially be paid for with CITY funds. The DISTRICT shall deposit with the CITY within forty-five(45)days following execution of this agreement, funds estimated to cover the cost of work to be performed by CONSULTANT with respect to the gabion drop structure, as set forth in the REPORT,plus a contingency amount equal to twenty-five percent(25%)of the CONSULTANT's cost for the gabion drop structure,as set forth in the REPORT. Costs incurred by the CITY for administration of the CONSULTANT contract shall be split equally between the CITY and DISTRICT,and the DISTRICT's share of such costs shall be paid for out of the twenty-five(25%)contingency paid to the CITY by the DISTRICT.Costs incurred by the CITY for inspection and material testing on the gabion drop structure portion of the PROJECT shall be the responsibility of the DISTRICT and shall be paid for out of the twenty-five percent(25%)contingency paid to the CITY by the DISTRICT. Within ninety(90)days following completion of the consulting services contract with CONSULTANT"and PROJECT construction by BLACKHAWK,the CITY shall submit to the DISTRICT a final report of the receipt and disbursements related to the work performed by CONSULTANT as well as CITY costs to perforin administration,inspections and material testing.The final report shall be broken out by PROJECT component.The final report shall include a cost summary,copies of all contracts and change orders,invoices and cancelled checks.A final invoice for any additional amount owed to the CITY by the DIS'T'RICT to cover costs associated with the gabion drop structure shall be submitted to the DISTRICT with the final report. Upon approval of CITY's report,the DISTRICT shall pay any outstanding amounts to the CITY within forty-five(45)days following receipt of the final report. If the DISTRICT provided funds in excess of those shown in the final report,the CITY shall refund these monies to the DISTRICT within forty-five(45)days following submittal of the final report to the DISTRICT. 2) PROJECT Construction Costs. It is understood by both parties that BLACKHAWK will be hiring an independent contractor to construct the PROJECT.The DISTRICT shall enter into a separate agreement with BLACKHAWK for reimbursement of eligible costs related to the construction of the gabion drop structure component of the PROJECT. Eligible items of work are those specified on the adopted Drainage Area 105 plan and as shown on the approved PROJECT plans or as otherwise allowed by the DISTRICT. Any claim by BLACKHAWK for payment for work on the channel and pedestrian trail modification component of the PROJECT shall be processed for payment by the CITY.The DISTRICT shall not be responsible for reimbursement of any costs relating to any of the channel and pedestrian trail modification work. 5. Insurance and Hold Harmless: A. The contract documents for the CONSULTANT shall include provisions requiring the CONSULTANT and all of its sub-consultants to(i)provide insurance in forms and limits approved by DISTRICT and CITY, naming the DISTRICT,CITY,and Contra Costa County, their officers, employees, consultants, and agents as additional insures,and, (ii)promise to defend, indemnify and hold harmless DISTRICT, CITY, and Contra Costa County,their officers, employees, consultants,and agents, from liability arising from or in any way related to the work performed under the CONSULTANT contract. The aforementioned insurance policy shall contain a provision that the insurance afforded thereby to the additional insureds shall be primary insurance to the full limits of the policy and that, if any of the additional insureds has other insurance or self-insurance against a loss covered by such policy, such insurance or self-insurance shall be excess insurance only.Before beginning work under the CONSULTANT contract,the CONSULTANT shall submit to CITY and DISTRICT evidence of insurance providing the required coverage and requiring the carrier to give at least 30 days written notice to CITY and DISTRICT of any cancellation,non-renewal or material modification of the policy. B. Neither the DISTRICT,nor any officer,employee,consultant or agent thereof,shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by the CITY in connection with the work delegated to the CITY under this agreement,and, to the extent not covered by the above-described insurance or indemnification,the CITY shall defend,indemnify,save and hold harmless the DISTRICT,its officers, employees,consultants and agents from any and all claims, costs,penalties, fines, expenses,loss and liability, including attorneys' fees, arising out of the willful misconduct or sole negligent acts,errors or omissions,of CITY, it's officers,employees,and agents in the performance of this agreement. C. Neither the CITY,nor any officer,employee,consultant or agent thereof, shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by the DISTRICT in connection with the work delegated to the DISTRICT under this agreement,and,to the extent not covered by the above-described insurance or indemnification,the DISTRICT shall defend,indemnify,save and hold harmless the CITY,its officers,employees,consultants and agents from any and all claims,costs,penalties,fines,expenses, loss and liability,including attorneys' fees,arising out of the willful misconduct or sole negligent acts,errors or omissions, of DISTRICT, it's officers,employees,and agents in the performance of this agreement. D. Nothing in this agreement is intended or shall be construed to affect the legal liability of either party to third parties by imposing any standard of care greater than that normally imposed by law. 6. Acceptance and Maintenance: A. Upon acceptance of the PROJECT by the CITY,the DISTRICT shall own and be responsible for maintaining the gabion drop structure component of the PROJECT. B. It is the intent of the DISTRICT to accept ownership of the Deer Creek channel when the capacity and stability issues within the channel are addressed to the satisfaction of the DISTRICT.Upon completion of the Deer Creek channel modification work to be performed by BLACKHAWR and acceptance of the PROJECT, and if it is determined by the DISTRICT,in its sole discretion, that the work corrected the outstanding capacity and stability issues,and that the remaining"punch-list"items of work previously identified in transmittals to the CITY from the DISTRICT dated January 30, 1997 and October 11, 1999 have been completed and a flowage and access easement across Apple Hill Drive have been offered to the DISTRICT,the.DISTRICT will accept ownership of the Deer Creek channel,excluding ownership of the culvert crossing under Apple Hill Drive and accept the flowage and access easement across Apple Hill Drive. The acceptance of ownership will be accomplished in a manner consistent with the dedication on the Final Map for Subdivision 7642. C. Within thirty(30)days following DISTRICT acceptance of the Deer Creek channel right of way, DISTRICT and CITY shall amend the"Temporary Right to Enter and Use Flood Control Property"agreement between the CITY and DISTRICT,attached hereto as Exhibit B,to include the Deer Creek Channel facility. 7. Agreement Modification: This agreement shall be subject to modification only with the written consent of the legislative bodies of both parties.Neither party shall unreasonably withhold its consent to the implementation and accomplishment of the overall purpose for which the agreement is drafted. 8. ;Restrictions: Pursuant to Government Code Section 6509,the powers of the parties under this agreement shall be subject to the restrictions on such powers applicable to the DISTRICT. 9. Accountability: As required by Government Code Section 6505,both parties to this agreement shall provide strict accountability of all funds received and disbursed for the joint PROSECT. 10. Agreement Termination: Unless terminated earlier through the mutual,written consent of the parties,this agreement shall terminate upon final payment by the DISTRICT of any outstanding costs due to the CITY or refund by the CITY of any overpayments by the DISTRICT as identified in the final report prepared by the CITY as described in Section 4.A. above, and upon execution of a license agreement between the CITY and DISTRICT for operation and maintenance of the pedestrian trail within DISTRICT right of way.Notwithstanding termination of this agreement,the provisions of Section 5.8. and S.C. shall survive such termination, 11. Integration: This agreement contains the full and final understanding of the CITY and DISTRICT relative to the PROJECT and financing of the PROJECT. 12. Notices: All notices(including requests,demands,approvals or other communications)under this agreement must be in writing. The place for delivery of all notices given under this agreement will be as follows: DISTRICT: Contra Costa County Flood Control District 255 Glacier Drive Martinez, CA 94553 Attn:Eric Whan CITY: City of Brentwood 708 Third Street Brentwood,CA 9451.3 Attn:Ken DeSilva 13. Counterparts: The parties hereto recognize and agree that separate counterpart signature pages may be used but that all such pages constitute one and the same agreement. 14. Construction: The section headings and captions of this agreement are,and the arrangement of this instrument is,for the sole convenience of the parties to this agreement. The section headings,captions and arrangement of this instrument do not in any way affect, limit, amplify or modify the terms and provisions of this agreement.This agreement will not be construed as if it had been prepared by one of the parties, but rather as if both parties have prepared it.The parties to this agreement and their counsel have read and reviewed this agreement and agree that any rule of construction to the effect that ambiguities are to be resolved against the drafting party will not apply to the interpretation of this agreement, The recitals are, and will be enforced as, a part of this agreement. 1 S. Further Assurances: Whenever requested to do so by the ether party,each party will execute, acknowledge and deliver all further conveyances,assignments,confirmations,satisfactions,releases, powers of attorney, instruments of further assurance, approvals, consents and all further instruments and documents as may be necessary,expedient,or proper in order to complete all conveyances,transfers, sales, and assignments under this agreement,and do all other acts and to execute, acknowledge, and deliver all documents as requested in order to carry out the intent and purpose of this agreement. 16. Waiver: A waiver or breach of any covenant or provision in this agreement will not be deemed a waiver of any other covenant or provision in this agreement, and no waiver will be valid unless in writing and executed by the waiving party. 17. Severability: If any term or provision of this agreement is,to any extent,held invalid or unenforceable, the remainder of this agreement will not be affected. 18. Governing Law and Venue: This agreement will be governed and construed in accordance with California law. The venue of any litigation pertaining to this agreement will be Contra Costa County, California. CONTRA COSTA COUNTY FLOOD CONTROL AND CITY OF BRENTWOOD WATER CONSERVATION DISTRICT By: B Chairperson,Board of Supervisors John E. Stevenson,City Manager ATTEST: ATTEST: John Sweeton,Clerk of the Board of City Clerk Supervisors and County Administrator By: By:47�4A Deputy I{ n Diaz,CMS RECOMMENDED FOR APPROVAL: FORM APPROVED: Maurice M. Shiu, By: Dennis Beouher,City Attorney By: Deputy Chief Engineer FORM APPROVED: Silvano B. Marchesi,County Counsel By: Deputy N a. 1� The Power,to Ckww The PowertD Build RECEIVED SEP 18 20 o2 September 3, 2002 Contra Costa County #oad ContrOt And Water Consarrvation bistrict Distribution: Ken DeSilva, City of Brentwood Reference: Revised Proposals for Beer Creek Channel Modifications & Trail Extension and Gabion Drop Structure, prepared by Berryman & Kenigar, Revision date September 3. 2002 The following is a summary of the proposals and the budgets for each item of work. Design of Brentwood Bike Rath & Gabion Drop Structure Item 1 Berryman & Heniger- Scope of Services & Budget for Deer Creek Channel Modifications & Trail Extension. Revision Date 5eptarnber 3, 2002 $77,396 Item 2 Berryman & Henigar- Scope of Services & Budget for Gabian Drop Structure, revised September 14, 2001. Revision Date September 3, 200 $ 23,620 Total (items 1 &2) $ 101,016 K,,GCMt1Cttents%rentwoodlProposels-Sp{Ys\2it01-Appte Nitt Bike Lano\Scops&Budget September'02\Cover Sept-o2.doc 6150 Stoneridge Mall Road,Suite 370,Pleasanton,California 34588 (925)468-74000 ♦ Fax(925)468-7413 ♦ www.bhiine.com 6 A COST ESTIMATE FOR DEER CREEK CHANNEL MODIFICATIONS&TRAIL EXTENSION(Brentwood Bike Path,B8P) &GABION DROP STRUCTURE(CADS) CITY OF BRENTWOOD l CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT Revised: September 3, 2002 May 9,2002 September 14, 2001 ASK I CAD Operator IAdmin Staff TA S j NR8 CAST HRS CC787 NRS COST HRS COST NRS COST HRS COST HouttyRatet 5480 1 $122 92 $85 $55 1.0 Project Management 1.1a Administration-BBP 2 $320 15 $1830 17 450 #.#b Admtnistration-GDS 2 $320 12 $1,464 44 __$1,764 1.28 Project Review Meetings-$SP #5 $1,830 20 $184{1 38 $3870 1.2b Project Review Meetings-GDS 6 $732 8 $7738 14 $1,468 1.3a quality Control-BSP 2 $320 10 $1220 12 $1540 1.3b quality Control-GDS 2 $320 4 $488 6 1.49 Pubic Meetings-SBP 10 $1220 40 $920 20 $2140 1.4b Pubic Meetings-GDS Total Task 1.0 198 $13,560 2.0 Data Coliectlon 2.1a Utility Research-BSP 4 $488 8 $736 12 $1224 2.1b Utility Research-GDS 4 $488 8 $738 12 Si 224 229 Obtain Design Criteria SBP 8 $978 8 738 t6 $1,712 2.2b Obtain Design Criteria-GDS 4 $488 4 $488 2.3a Survey-BSP 4 $488 4 5488 2.3b Survey-GDS 2 $244 2 44 246 Geotechnical investigation-SBP 4 $488 4 $488 2.4a Geotechnical investigation-GDS Total Task 2.0 64 $5,$88 3,0 CERA✓R Environmental 3.1a CEQA&Environmental-BSP 2 $244 2 44 3.1b CPQA&Environmental-GOS 2 $244 2 $244 Total Task 3.0 4 $488 4.0 Prellrninm Design 4.1a Hydrology Study-SBP 10 $#800 32 $3,904 32 52 944 74 ",448 4.2a Hydrology Study-GOS 4.2a Hydrology Report-BSP 2 $320 8 $978 10 $1298 4.2b Hydrology Report-GDS 4.3a Meetings w/City-BHP 8 $978 8 $978 4.3b Meetings w/City-GOS Total Task 4.0 82 S110,720 Pale 1 of 2 -4 t F s �t COST ESTIMATE FOR DEER CREEK CHANNEL MODIFICATIONS&TRAM.EXTENSION(Brentwood Bike Path,SOP) & 13ASION DROP STRUCTURE(CADS) CITY OF BRENTWOOD i CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT Revised: September 3,2002 May 9,2002 September 14,2001 AS,KI 5n'o7neer If I C-0 Operator# Admin 777' TOTR S HRS CsJSF HRS COST HR9 COST HRS CC)ST HRS CC}ST HRS COST M RMm: $ 80 $122 1 $92 65 55 6.0 istna!I}eat#fin 5.te -Prepare Final Hydrology Report-BSP 4 $640 16 $1552 20 $1,840 40 $4,432 5.2b Prepare Final Hydrology Report-GDS 5.2a 50%PS&E-BSP 16 $1952 60 $5 520 20 $1,300 96 $8 772 5.211 50%PS&E G OS 16 $1952 20 $1,840 36 P'792 5.32 909E PS&E-BSP i6 $1952 50 $4 600 20 $1 300 10 $550 96 $8,402 5.3b 90%PS&E-GOS 8 $976 10 $920 4 $220 22 $2118 5.4a Fhal Plans-68P 5 $800 16 $1,952 40 $3,680 20 $1300 10 $550 91 $8 282 5.4b Fina!Plans-GDS 2 $320 4 $488 4 $368 4 $220 14 $1,398 rani Task 5.0 395 $37,182 6.0 Advertise 7 AWard€*wiod 8,12 I Advertise/Award Period-SBP 16 $1,052 8 $736 24 $2 688 13.lb AdveMse/Award Period-GDS 8 $876 4 $368 12 $1344 Total task 8,0 38 $4,032 7,0 consdmado►t support 71a Construction Support-SSP 16 $1,952 16 $1,472 8 $520 40 $3,944 7Ab Construction Support-GDS 8 $976 8 $736 16 1 712 Tota{Task 7.0 5g $5,0g8 TOTAL LABOR 31 $4,960 294 $35.868 334 $30,728 68 $4,420 26 $1,540 735 #77,f+18 SUBCONSULTANTS: ACCT,NO. TYPE NAME FEE Geotschnical-BSP Terrasearch Inc. $023 Surveys-BBP Triad/Holmes $6,877 Surveys-GDS Triad/Holmes $6 000 SUBTOTAL FOR SUBCONSULTANTS $117,500 OTHER DIRECT COSTS: ACCT.NO. TYPE FEE Direct Costs K 000.00 MlleNe Prints Copies,Com sr&Communication Fees SUBTOTAL FOR OTHER DIRECT COSTS $fi t}Dp T OTALP�R(�O•JECT COST $101,016 �IN.] 11tlFA-7.�.1. BBP Brentwood Bike Path GDS Gabion Drop Structure f mpored for CNy of Brentwood,Parks Department A Centro Caster County Flood Control Dhhtef Bike Lane Extension of Apple Hill Esh los d Aablon Drop Structure Prepared By;Joubin Pokpour,P,E.A Gray tlshlro,P.E. bnw..h ni^I ^i SCOPE OF SERVICES LEER CREEK CHANNEL MODIFICATIONS & TRAIL EXTENSION CITY OF BRENTWOOD Revised September 3, 2002 May 23, 2002 June 21, 2001 October 5, 2001 The following Scope of Work outlines that individual work task items and deliverable work products will be provided for the duration for the project; Perform activities necessary to plan, direct, and coordinate the work of the project team and provide progress reporting. The project management and administration tasks will include all phases of the project. 1.1 Administration • Supervise, coordinate, and monitor design for conformance with City of Brentwood and other governing agency standards and policies. • Prepare a monthly progress report and invoices. • Prepare a project schedule and monthly updates. 1.2 Project Review Meetings • Attend monthly project review meetings with applicable City and District personnel (3 meetings assumed). • Attend site field review meetings (2 meetings assumed). 1.3 Quality Control Program • Implement quality control procedures during project studies and preparation of deliverables. 1.4 Public Meetings • Assist City with preparation of meeting exhibits (2 meetings assumed). .1 Perform utility research at Apple Hill Road to obtain record information of existing utilities. Page 1 of 4 Scope of Services Deer Creek Channel Modifications&Trail Extension City of Brentwood Revised September 3,2002 May 23, 2002 June 21,2€304 October 5,2004 2.2 Obtain design criteria including, but not limited to, creek flow rates and design water surface elevations from Contra Costa County Flood Control District. 2.3 Perform control survey and design survey of the project site and obtain cross sections of Deer Creek channel within project limits upstream of Apple Hill Drive for a distance of 1000 lineal feet for backwater calculations and obtain cross sections of Deer Creek channel downstream to the existing drop structure 2.4 Perform geotechnical investigation and develop geotechnical recommendations for the design of the law flow cut-off wall at the Apple Hill under crossing. 3.1 CEQA and Environmental Permitting of the project will be performed by others. Berryman & Henigar will insure that any special requirements of the environmental process are incorporated into final construction documents. 4.1 Prepare preliminary hydrology study and HEC-RAS calculations for proposed changes to the existing box culvert and channel to provide capacity for the 100- year design flow (flows to be provided by the District). 4.2 Prepare preliminary letter report with finding and recommendations of culvert and channel modifications. 4.3 Attend up to three meetings with City staff to review and refine the culvert, trail and channel modifications. 5.1 Prepare final hydrology study and HEC-RAS calculations for proposed changes to the existing box culvert and channel for 100-year design flow in report format per the Districts requirements. 5.2 - 5.4 Prepare 35%, 90%, and Final PS&E submittals. Final design documents will be submitted in hardcopy and electronic format. Specifications will be prepared in City of Brentwood format using City boilerplate contract documents. This work effort will include: Page 2 of 5 Scope of Services Door Creek Channel Modifications&Trail Extension City of Brentwood Revised September 3,2002 May 23, 2002 June 21, 2004 October 5,2001 • Prepare, design and draft grading, drainage arta paving pians for proposed trail improvements located at and adjacent to the Apple Hill ander crossing. • Prepare, design and draft plans to modify existing culvert crossing under Apple Hili Drive and potential channel upstream and downstream to accommodate proposed pedestrian trail use of existing under crossing. • Provide City with reproducible copies of plans and specifications for reproduction and distribution to bidders. • Berryman & Henigar assumes that no grading modifications and grading plans will be required for the channel between the Apple Hill Road culverts to the Gablon Drop Structure, and are not part of this scope of work. Should the preliminary design find that channel modifications are required between the Apple Hill Road culverts and the Gabion Drop Structure, an additional scope of services will be prepared under a separate cover. • Perform bid analysis and prepare letter to recommence award of the construction contract. • Respond to requests from City representative for information and clarification of plans and specifications and assist the Client in resolving construction-related Issues. Questions and reviews of the City's landscape plans will be directed to the City as appropriate. • Assist the City's projecticonstruction manager in review on contractor submittals and shop drawings for general conformance with the requirements of the contract documents (assumes a maximum of six construction submittals and/or shop drawings). • Perform intermittent job site visits to observe the general progress of the work and determine its general conformity to the intent of the plans and specifications (.assumes a maximum of four job site visits). Page 3 of 5 Scope of Services Deer Creek Channel Modifications&Trail Extension City of Brentwood Revised September 3,2002 May 23,2002 June 21,2001 October 5, 2001 • Provide earthwork inspection and testing for conformance to the soils engineer's specifications. Provide one set of reproducible regard drawing reflecting the field changes documented by the City's construction inspector and contractor. K\CIVAC11OntsNarenfwoomproposals-SOQ'sl20Dt-Apple Hill Bike EanelSaope&Budget September=Scop"hannet ModlflcaUtrns-Sept-02.doc Page 4 of 5 r COST ESTIMATE FOR DEER CREEK CHANNEL MODIFICATIONS&TRAIL EXTENSION CITY OF BRENTWOOD Revised. September 3,2002 May 9,2002 September 14,2001 A KM-8-014 i P T FO R Pqq21p3i g4nesr Senior SNAnser. n mer ii TOTALS a7 NRS COST_ NRSC{3ST HRS COST FIRS COST NRS COST NRS COST ran n.ss: $160 $122 $92 $65 $yrs 1.0 Project Mamsgsarent 1.1 Administration 2 $320 15 $1,830 17 $2150 1.2 jProject RwAw MestrQe I i5 $1,8301 20 $1,B401 35 $3.670 1.3 Quality Control 2 $320 10 $1220 12 $15401 1,4 PuM Meetings 10 $1,220 t0 $920 20 140 Total Task 4.0 ;#,Soo 2.0 Dats 0*4* tm 2.1 Utility Research 4 $488 8 $736 12 1224 2.2 Obtain Design Criteria 8 $976 8 $736 16 31712 2.3 Survey 4 $488 4 $466 2.4 fxeoteamlc;al investigation 4 $488 4 $488 Total Tssk 2.0 36 $3,E112 3.0 L'E03A&&nvtromnon#s1 2 $244 2 $244 4.0 PretimftwW Design 4.1 Hydrology ftdy 10 $i 800 32 $3,904 32 $2,q44- 74 $8 448 4.2 Prepare HydrtriogyRtport 2 $320 8 $976 10 $1296 4.3 M w9 C#y 6 $976 8 $975 T*W"task CO 92 $10,724 $.0 Final Design 5.1 Prepare Final Hydrology Report 4 $640 16 $1952 20 $1,840 40 $4432 5.2 50-6 PS&E 16 $1,952 60 K'520 20 $1,300 96 $8,772 5.3 90%PS&E 16 $t 952 50 $400, 20 $1300 10 $550 96 $8,402 5.4 Final Plans 5 $800 16 $1 952 40 $3,680 20 $1 300 10 $550 91 $8 282 TotaE Task 5.0 323 $29 888 6.4 Adirertlse f Aura!Periard 16 $1,952 8 $736 F 24 $ 888 7.0 jC.r,%Vucftn 8,,pp-d ie $1,9521 16 $1,472 8 $5201 r 40 $3,844 TOTAL LABOR 26 $4,000 216 $26,352 1 272 $25,024 68 $4,420 20 $1,100 609 $60,8" SUBCONSULTANTS: ACCT.NO, TYPE NAME FEE Oeoteohnioai Tenassaroh Inc. $4823 Surve Tried!Holmes $6877 SUBTOTAL FOR SUBCONSULTANTS $115001 OTHER DIRECT COSTS: ACCT,NO, TYPE PEE Direct Ctseta $5 000,00 Milesoe,Prints copies,pqLnpu#ejr&Communfcation Fees IS FOR OTHER DIRECT COSTS $5,000 TOTAI PROJECT COST $771390 Prepamd for City of Brentwood,Parks t>epadmont Bike Lane Wonsfasn of Apple HN Estates Prepared By.loubin Pakpour,P,E.3 Garry Ushtro,P.E. SCOPE OF SERVICES GABIt3N DROP STRUCTURE CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT Revised.- September 3, 2002 May 23, 2002 October 5, 2001 The following Scope of Work outlines the additional services required to add Contra Costa County Flood Control District's Gabion Crop Structure design to the improvement plans for the Brentwood Bike Path Project. The scope of work outlines individual work task 'items and deliverable work products that will be provided for the duration of the project: Perforin activities necessary to plan, direct, and coordinate the work of the project team and provide progress reporting. The project management and administration tasks will include all phases of the project: 1.1 Administration • Coordinate design for conformance with City of Brentwood, Contra Costa County Flood Control District (CCCFCD) and other governing agency standards and policies. • A single monthly progress report and invoices will be prepared for the Bike Path Project and will include the work for the Gablon Drop Structure. • A single project schedule and monthly updates will be prepared for both projects. 1.2 Project Review Meetings • Attend a project meeting regarding the Gabion Drop Structure with applicable City and CCCFCD personnel (1 meeting assumed). • Attend site field review meeting (1 meeting assumed). 1.3 Quality Control Program • Implement quality control procedures during project studies and preparation of deliverables. 1.4 Public Meetings Page 1 of 5 r Scope of Services Gablon Drop Structure Contra Costa County Flood Control District Revised September 3, 2002 May 23,2002 October 5, 2001 +� We have assumed that no public meetings are required for the Gabion Drop Structure, therefore, no time has been included for attending public meetings. 2.1 Perform utility research at Apple Hill Subdivision (7462)and Tuscany Subdivision (7474) to obtain record information of existing utilities near the existing drop structure and detention basin. 2.2 Obtain design criteria including, but not limited to, creek flow rates and design water surface elevations from Contra Costa County Flood Control District. 2.3 Perforin control survey and design survey of the project site and obtain cross sections of the existing drop structure. The limits of survey will include the upstream end of the existing drop structure to 300 lineal feet from the downstream end of the existing drop structure. 2.4 We have assumed that no geotechnical investigations are required for the Gabion Drop Structure and that the CCCFCD's Gabion Drop Structure design Is structurally complete. 3.1 CEQA and Environmental Permitting of the Gabion Drop Structure will be performed by others. Berryman & Henlgar will insure that any special requirements of the environmental process are incorporated into final construction documents. 4.1 Per CCCFCD, the preliminary hydrology study will not include the gabion drop structure, since CCCFCD is satisfied with the expected performance of the proposed drop structure. Modifications to the channel may be required between the Apple Hill Road culvert and the gabion drop structure, and will be identified in the preliminary design of the City's portion of this project. Therefore, no time has been included the in the preliminary design task for the gabion drop structure. Page 2 of 5 Scope of Services Gabion Drop Structure Contra Costa County Flood Control district Revised September 3,2002 May 23,2002 October 5, 2001 5.1 Per CCCFCD, a final hydrology study for the proposed gablon drop structure is not required. No time has been included for the final hydrology study for the gablon drop structure. 5.2 -5.4 Prepare 50%, 90%, and Final P5&E submittals for the Gabion Drop Structure and include the PS&E documents with the Bike Path Project PS&E documents. Final design documents will be submitted in hardcopy and electronic format. Specifications will be prepared in City of Brentwood format using City boilerplate contract documents. This work effort will include: • Obtaining the CCCFCD's microstation details of the Gabion Drop Structure and adding the details to the Bike Path Project plans. The CCCFCD's signature block will be included on the gabion detail sheet. • Grading and drainage design of the proposed Gabion Drop Structure to conform to the existing banks. We have assumed that the elevations provided by CCCFCD will provide adequate channel slope between the culverts at Apple Hill Road to the proposed gablon structure. Em • Perform bid analysis and prepare letter to recommend award of the construction contract. • We have assumed that the Gabion Drop Structure and Brentwood Bike Path will be constructed as one project. Construction support services for the Gabion Drop Structure will be combined with the construction support services described in the Beer Creek Channel Modifications & Trail Extension proposal, dated June 21, 2001. Additional time has been included to support the Gabion Drop Structure portion of the project. • Despond to requests from City and CCCFCD representatives for information and clarifi'cati'on of plans and specifications and assist the Client in resolving Page 3 of 5 t ` Scope of Services Gablon Drop Structure Contra Costa County Flood Control district Revised September 3,2002 May 23, 2002 October 5, 2401 construction-related issues. Questions and reviews of the City's landscape plans will be directed to the City as appropriate. • Assist the City's protecticonstruction manager in review on contractor submittals and shop drawings for general conformance with the requirements of the contract documents (assumes one construction submittal and/or shop drawing). • Perform intermittent job site visits to observe the general progress of the work and determine its general conformity to the intent of the plans and specifications (assumes one job site visit). • Provide one set of reproducible record drawing reflecting the field changes documented by the City's construction inspector and contractor. K:iCivthClientslStantwoodkProposxts-SOQ`*12441-Appt6 HI#81ku UnalSoope 6 Budget September'42tSaape.Drop Structur*-Sapt-02.doc Page 4 of 5 r _ - 4 a + COST ESTIMATE FOR GASION DROP STRUCTURE CONTRA COSTA COUNTY FLOOD CONTROL DISTRICT Revised: September 3,2002 May 8,2002 September 14,2001 TASK I Principal EnoIneer Senior En Enter n near Ik C rator dm YOT HRS COST HRS C05T HRS COST HRS COuf HRS COST HRS COS3 Ho Rats: $1B0 $122 $92 $86 $bb 1.0 Pro}tctManagamartt 1.1 Administrattcn 2 $320 12 $1484 14 $1764 1.2 "at Ros"w Meetings 8 $732 a $738 14 $1,404 1.3 qua*Control 2 $320 4 $488 8 f60t! 1A, Pubic Meet}ngs Total Task t,0 34 060 2.0 Data G4tieotion 2.1 Milly Research 4 $488 8 $736 12 $1 d 2.2 Obtain Design Criteria 4 $488 4 $qgg 2.3 Survey 2 $244 2 $344 2.4 GeottohrdcalInvestigation TatalTask 2.0 1s $1,968 0 IMA&Envtronmtntst 2 $244 g 5244 4.0 Preliminary Design 4.1 Hydrology Study 42 Pmw*Hydrology Report 4.3 M"Ungs Yd City TOW Task 4.0 8.0 final Design 5.1 Prepare Final Hydrology Report 5.2 80%Ped E is $1,952 20 $1 840 36 $3 7a2 5`3 909i E 8 $676 10 _ $820 4 $220 22 $2118 5.4 Final Finns 2 $320 4 $488 4 $388 4 $220 14 _$1,396 TOtab Task 6.0 72 $7,304 O jAdvorflaw I Award Period 8 $876 4 $388 12 $1,3411 7.0 0'ona2roo0on Support 4 8 sale 8 sm15 -777M TOTAL LABOR 8 #960 78 $9,518 82 $6,704 8 $440 f54 $f6,620 SUSCONSULTANTS: ACCT.NO. TYPE NAME FEE sways Triad/Holmes $6,000 SUBTOTAL FOR SUBCONSULTANTS $6,000, OTHER DIRECT COSTS: ACCT.NO. TYPE FEE Direct Coats $1,000.00 Mileage,Printf Co its Computer 8 Communication Fees SUBTOTAL FOR OTHER DIRECT COSTS $14000 TOTAL PROJEFT COST $23,620 Prepared for Contra Cast*County flood Control Divirlel Additional Sarylcas to add Gablan Drop Siruclure to the Bike Path Project at Apple Hill Estates Prepared Syr loubin Pokpovr,P.E.d Gary Ush",PIA t, r ; t 1 RIGHT TO 1ENTER.ANIS USE FEC}OD CONTROL PROPERTY '4�' BETEEN THE CONTRA COSTA COUNTY FLOODWATER CONTROL & T 1 ATER CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD 1, PARTIES: Effective , the Conga Costa County Flood Control& Water Conservation District,apolitical subdivision of the state of California,hereinafter referred to as "District," and the City of Bentwood,a California municipal corporation,hereinafter referred to as the"City" or as the"Permittee," agree as follows, 2, PERMISSION GRANTED:District hereby grants to City,permission to enter upon and use those lands more commonly known as District Facilities(District Facilities)within or upon which City improvements have been constructed,generally described in the list attached hereto as Exhibit "A," and made a part hereof,which property shall hereinafter be referred to as the "Premises," Permission is granted pursuant to the terms and conditions of this RIGHT TO ENTER AND USE FLOOD CONTROL PROPERTY BETWEEN THE CON'T'RA COSTA COUNTY FLOOD CONTROL & WATER. CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD, hereinafter sometimes referred to as"Agreement," 3. PURPOSE*District acquired fee title to the land comprising the Premises for use as a flood control detention basins and drainage water conveyance.facilities,hereinafter sometimes referred to as"District Facilities,"and.has constructed the District Facilities to capture and hold water during periods of heavy rain for gradual release or creep improvements for the conveyance of drainage water. Any and all rights granted or implied by this Agreement is subordinate to the use of the Premises as flood control detention basins and creek improvements for drainage water conveyance, as well as to all other uses of the Premises by District. The purpose of this agreement is to allow City's use of the Premises,subject and subordinate to the District's use ofthe Premises as detention basins and creep improvements for drainage water conveyance,and for any related or flood control use. District's use may cause a temporary,extended or permanent interruption in the City's permission to enter upon and use the Premises.District's use may be for the purposes of channeling,impounding and otherwise controlling the flow of drainage waters,as well as performing any other activities,and constructing or maintaining any facilities that the District may be required to perform,construct or maintain by other agencies at a Federal,State,Regional or Local level,including but not limited to, water quality and quantity control activities (such activities and those ancillary thereto being hereinafter referred to as "flood control"). 4. TERM:The term of this Agreement is one(1)year,commencing on the above effective date. This Agreement may be terminated as provided in Section 20,Termination. 5. CITY'S USE OF PREMISES: The Premises shall be used by City for recreational purposes such as sports fields, parks, trails, landscaping, pedestrian bridges and vehicular bridges. City's exact use of the Premises is subject to the written approval of the District's Chief Engineer which shallbe in the form of ari "Encroachment Permit for Use of District Right of Way." City shall provide, at City's sole expense, its own equipment, and other personal property necessary or convenient to its use of the Premises. + R.IGHT TO ENTER AND USE FLOOD CONTROL PROPERTY BETWEEN THE CONTRA COSTA COUNTY FLOOD CONTROL&WATER. CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD 6. PAYMENT OF DISTRICT's COSTS:The following paragraph will take effect and shall be prorated from date of enactment of the Contra Costa County Flood Control and Water Conservation District Common Use Facility Policy by the Contra Costa County Board of Supervisors. In each case where DISTRICT must prepare, amend and review documents for change and management of any and all issues this Agreement including default and/or enforcement of the terms of the Agreement and/or the City's use, City shall pay to DISTRICT in each such case an amount equal to one hundred percent (100%) of District's actual out-of-pocket costs of required on the part of DISTRICT in connection therewith. The costs will be based on the current Contra.Costa County Public 'Works Department Charge-taut Schedule at the time of the request. 7. LAWFUL CONDUCT:City agrees that its use of the Premises is subject to,and that it will obey and observe,and that it will use due diligence to require all persons entering upon the Premises to obey and observe,all terms of this Agreement and all applicable laws,ordinances,orders,rules, permits, regulations and requirements relating to the Premises whether federal, state, or local in origin. City shall be responsible for paying all Tines,penalties,or charges which may be levied for violation of laws,ordinances,orders,rules,permits,regulations,and requirements arising out of the operations of City or its employees or agents. City shall not commit,suffer,or permit any nuisance in or about said Premises. 8. MAINTENANCE, ALTERATIONS, AND SURRENDER OF PREMISES: City is responsible for all repairs and maintenance associated with City's use of the Premises. City shall not make any alterations to the Premises without the prior written consent of District's Chief Engineer, which permission may be revoked at any time if necessary for or in fin-therance of detention basin, creeks, water conveyance and/or flood control purposes. Upon such revocation, City shall immediately remove such alteration. Upon the expiration or termination of this Agreement, any alterations made shall remain on and be surrendered with the Premises,except that District can elect to require City to remove any alterations that City has made. If District so elects, City, at its sole. cost,shall restore the Premises to the condition existing just prior to City's use ofthe Premises under this or any other agreement. 9. NO DISTRICT DUTY REGARDING PROPERTY: District shall have no duty to guard or secure, and no liability for any loss of or damage to, goods,property,facilities and equipment of City or of third persons, located upon Premises irrespective of the cause of such loss or damage, including,but not limited to,flooding. Subj ect to the terms of this Agreement,City may provide,at its own expense,such security as it may deem necessary for the security and protection of its goods, property,facilities and equipment,provided such security measures do not interfere with the District Facilities use of the Premises.City shall designate in writing to District a representative who shall be responsible for the day-to-day operation and level of maintenance, cleanliness and general order. 2 RIGHT TO ENTER AND USE FLOOD CONTROL PROPERTY BETWEEN THE CONTRA COSTA COUNTY FLOOD CONTROL&`NATER CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD 10. HOLD HARMLESS AND INDEMNIFICATION: City shall defend,indernnify,save,and hold harmless District and its boards,agents,officers,and employees from any and all claims,casts, and liability for any damages,sickness, death or injury to person(s) or property,including,without limitation,all consequential damages,from any cause whatsoever arising directly or indirectly from or connected with the operations of or use of the Premises by City or its officers,agents,employees, contractors,subcontractors,public or invitees hereunder,save and except clai y RIGHT TO ENTERO AND USE FLOOD CONTROL PROPERTY BETWEEN THE CONTRA COSTA COUNTY FLOOD CONTROL &WATER, CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD 14. WASTE,POLLUTION AND HAZARDOUS SUBSTANCES: City shall not commit,or suffer to be committed,any waste upon the Premises,or any nuisance or other act that may pollute or contaminate the Premises or the watershed of which the Premises is a part. City is prohibited from applying, storing or disposing, or otherwise permitting the application,storage or disposal of,any pesticide or hazardous substance upon the Premises without having first obtained written permission from the District, which may be denied in District's sole discretion.As used herein,"hazardous substance"means any substance,material or waste which is or may become designated,classified or regulated as being"toxic,""hazardous"or"pollutant"under any federal, state or local law, regulation or ordinance. City is further prohibited from using any pesticide or hazardous substance anywhere on the Premises in an unsafe or careless manner or in any manner that is contrary to the manufacturer's instructions as they appear on the label or are further modified by the District. City must satisfy any and all pesticide application permit requirements as may be required by Federal, State or local regulations or agencies. Should any discharge,leakage,spillage,emission or pollution of any type occur upon or.from the Premises due to City's use or occupancy of the Premises,or City's use,release,or disposal of any pesticide or hazardous substance,City,at City's expense,shall test,remedied,repair,remove,clean and detoxify all property affected thereby, to the satisfaction of District (insofar as the property owned or controlled by District is concerned)and any governmental body having jurisdiction there over. City, to the maximum extent permitted by law,shall indemnify,hold harmless, and defend District and each of its employees,agents,attorneys,officers,divisions,related agencies and entities, affiliates, successors and assigns, from and against all liability; claim, demand, cause of action, damage, cost or expense (including, without limitation, any fines, penalties,judgments, litigation costs, attorneys' fees, consulting, engineering, and construction costs, all costs of any required or necessary testing,remediation,repair,removal,cleanup and detoxification of the Premises,and all costs for preparation of any cleanup, remediation , closure or other required plans) incurred by DISTRICT as a result of City's breach of this section, or as a result of any such discharge,leafage, spillage,emission or pollution,regardless of whether such liability,cost or expense arises during or after the lease term. 15. WATER QUALITY CONTROL BOARD REQUIREMENTS: City shall conform fully to the requirements of the California Regional Water Quality Control Board Central Valley Region (Order No. 5-00-120)NPDES Permit No. CA0083313 regarding waste discharge requirements for Contra Costa County Flood Control and Water Conservation District,Contra Costa County,the City of Brentwood and two other cities that formed the Contra Costa Clean Water Program adopted by the California Regional Water Quality Control Board, Central Valley Region, on June 16, 2000. This permit regulates storm water and non-storm water discharges associated with activities within DISTRICT rights of way. City shall develop, implement and maintain a Facility 4 RIGHT TO ENTER.AND USE FLOOD CONTROL PROPERTY BETWEEN THE CONTRA COSTA COUNTY FLOOD CONTROL&WATER R CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD Pollution Prevention Plan(FPPP),describing the pollution prevention practices associated with activities on facilities located on the Premises. The FPPP will accomplish compliance by implementing Best Management Practices (BMPs) described in the Contra Costa Clean Water Program countywide 1999 Storm Water Management Plan(SWMP). 16. 'WAIVERS: No District waiver(including any written authorization by District's Engineer) at any time of any of the terms, conditions, covenants, or provisions of this Agreement, shall be deemed or taken as a waiver at any time thereafter of the same or any other term,condition,covenant or provision,nor of the strict and prompt performance thereof. 17. NON-DISCRIMINATION:MINATION: City shall not discriminate,or allow any discrimination against or segregation of any person or group of persons on account of race, age,color,sex,creed,religion, national origin, or ancestry, or any basis protected under the law,in the use, occupancy,tenure, or enjoyment of the Premises. 18. PRIOR AGREEMENTS:This Agreement replaces any and all other agreements between the parties concerning the Premises. 19. LIMITATIONS OF USE. District shall have the right, in District's sole discretion, to suspend, limit, or modify City's use of the Premises,including requiring City to remove any of its Facilities,improvements,equipment or other property,or to restore the condition ofthe Premises,as necessary or in furtherance of detention basin, water conveyance, creeks and/or flood control purposes, or for the safety of the public. Should such suspension, limitation or modification of City's use of the Premises be necessary, District shall provide City thirty(30) days' prior written notice,except that if the District's,in its sole discretion,determines that an emergency exists,may require City to immediately remove its facilities,improvements, equipment or other property, or District may immediately do so in which case City shall reimburse District's costs of such removal. Nothing in this agreement requires District to provide prior notice to City as a condition ofDistrict's entry, alteration and use of the Premises for detention basin, creeks, water conveyance and other flood control purposes. City understands that District's use of the Premises for detention basin, creeks, water conveyance and other flood control purposes is paramount, and City's use of the Premises for recreational,vehicular and pedestrian purposes may continue only if it such use does not interfere with or increase the costs of,District's operations associated with the Premises. District and City have determined, and City hereby acknowledges, that the use proposed by City for the Premises might not always be compatible with District's flood control operations even if City keeps and observes the covenants City has agreed to keep and observe. Silt will be removed only when it impacts the flood storage capacity.Typically,the storage capacity will not be impacted until twelve (12)inches of silt is deposited in a basin and will be removed at the sole discretion and decision of the District. The City may, at their own expense, remove silt as necessary with District approval which shall be in the form of a"Encroachment Permit for Use of District Right of Way" As a courtesy, District will endeavor to provide to City, advance notice of any District maintenance or other activities that District is aware could disrupt any recreational,vehicular and pedestrian use of the Premises. 5 RIGHT TO ENTER AND USE FLOOD CONTROL PROPERTY BETWEEN THE CONTRA COSTA COUNTY FLOOD CONTROL &WATER. CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD 20. TER?vHNATION: This Agreement may be terminated as follows: A, Anytime upon mutual written agreement of the parties. B. By City upon providing District fifteen(15)days written notice. C. By District upon City's default under this Agreement. City shall be in default of this Agreement if any of the following occurs: 1) City fails to comply with any provision of this Agreement,including failing to comply any written notice or instruction from the District,fallowing the provision of thirty(30)days' written notice from District pursuant to this section. 2) If, following multiple breaches of this Agreement, City commits a material breach of this Agreement after notice from the District. Such notice shall specify what conduct will constitute a material breach of this Agreement. For purposes of this Subsection C, District, in its sole discretion, shall determine whether City has committed a breach or cured a breach, and/or whether City is in default of this agreement. 21. NOTICES: All notices given under this Agreement shall be served by enclosing the same in a sealed envelop addressed to the other party,certified mail postage prepaid,addressed as follows: 22. To District: Contra Costa County Public Works Department Real Property Division Principle Real Property Agent 2.55 Glacier Drive Martinez, CA 94553 To Permittee: City of Bentwood 708 Third Street Brentwood, CA 94513 or to such other address as either party may designate by written notice to the other. Notice is effective two business clays from the date of mailing. 23. NO THIRD PARTY BENEFICIARIES:Nothing in this Agreement is intended to confer on any person or party, other than District and City, any rights or remedies under this Agreement. 24. NO MODIFICATION: This Agreement shall not be modified or amended except in writing agreed upon by both parties. 6 RIGHT TO ENTER AND USE FLOOD CONTROL PROPERTY BETWEEN THE CONTRA COSTA COUNTY FLOOD CONTROL&WATER. CONSERVATION DISTRICT AND THE CITY OF BRENTWOOD DISTRICT: PERMITTEE: CONTRA COSTA COUNTY FLOOD CITY OF BRENTWOOD CONTROL&WATER CONSERVATION DISTRICT By: B Maurice Shiu, Chief Engineer Date: By: LA (Date signed) Recommended for Approval: Date: t, - (Date signed) By: Real Property Agent Approved as to form: Silvano B.Marchesi, County Counsel By: Deputy County Counsel DB eh 0,V3mDataihealPmp12003-Pilea\03-21Srentwood Right of Entry agreement 03-20-03.doe 3127/03 7 r , EXE•IIT"A" DeteL.t on Basins (District fee title w/ City park and/or playing fields) • Dry Creek Basin(Creekside Park)—Park facility(tot lot, trails,picnic tables) t + Deer Creek Basin—Sports field,trail Creeks (District fee title w/ City trails and landscaping) • Sand Creek—Fairview Avenue to Minnesota Avenue • Deer Creek—Fairview Avenue to Bristow Middle School • Dry Creek—Fairview Avenue to Dry Creek Basin(Creekside Park) Creeks (District fee title w/ City pedestrian bridges) • Sand Creek @ Surnmerwood Park • Marsh Creek @ Homecoming Park • Marsh Creek west of Hwy 4 • Marsh Creek @ Valley Green Drive • Marsh Creek @ Creekside Park Creeks (District fee title w/ City vehicular bridges) ({These facilities require permanent easement rights. We are confirming the right of way statusfor each. If easement documents have not been processed for a particular facility, thea it shall be covered by the Temporary bight of Entry until such time that the easement documents are processed. An updated list is forthcoming:)) • Sand Greek--Fairview Avenue + Sand Creek—Minnesota Avenue + Deer Creek—Fairview Avenue + Deer Creek--Minnesota.Avenue • Veer Creek—San Jose Avenue • Dry Creek—Arlington Way +' Dry Creek--Claremont Drive • Marsh Creek @ Balfour Way • Marsh Creek @ Dainty Avenue + Marsh Creek @ Central Boulevard • Marsh Creek @ Sand Greek Road • Marsh Creek @ Sunset Road 9:1gmdata12]dctllcurdevicitiesTrentwood\Brentwood TROE ExhibitA,doc 3/27103 OW* Affiliated Risk Mammon A 120 18th Strsot'Sub 288,$8081080to,:* COPY 1818148141436 �. lax 1818g1r�Q"�. �.� .�.. t =f LIABILITY CERTIFICATE 0bC VJaMQE2)003 ADDITIONAL COVERED PARTY CERTIFICATE NUMBER. 12002 - gBilYisf isit�r.;±r CERTIFICATE HOLDER: CONTRA COSTA COUNTY FLOOD CONTROL&WATER CONSERVATION DISTRICT ATTN: PRINCIPLE REAL PROPERTY AGENT PUBLIC WORKS DEPARTMENT,255 GLACIER DRIVE MARTINEZ,CA 94553 COVERED PARTY: CITY OF$RENT104000, DESCRIPTION OF COVERED ACTIVITY: IT IS HEREBY AGREED THAT CONTRA COSTA COUNTY FLOOD CONTROL&WATER CONSERVATION DISTRICT,ITS DIRECTORS,OFFICERS,AGENTS AND EMPLOYEES ARE NAMED ADDITIONAL COVERED PARTIES AS.RESPECTS THE CITY OF BRENTWOOD'S AGREEMENT WITH THE DISTRICT WHICH GRANTS THE.CITY THE RIGHT TO ENTER AND USE FLOOD CONTROL PROPERTY,DESCRIBED IN EXHIBIT A OF THE AGREEMENT, FOR RECREATIONAL PURPOSES SUCH AS SPORTS FIELDS, PARKS,TRAILS,LANDSCAPING,PEDESTRIAN AND VEHICULAR BRIDGES,BUT ONLY INSOFAR AS THE OPERATIONS DESCRIBED IN THE AGREEMENT ARE CONCERNED. MEMO POLICY NUMBER: CARMA 2002-1 OCL EFFECTIVE DATE: 5/8/2003 LIMITS: $4,000,000 EXPIRATION DATE: 6/30/2003 (per occurrence) EXCESS OF:$1,000,000 THE FOLLOWING COVERAGE IS IN EFFECT: Bodily injury and property damage coverage provided herein is as broad as general liability ISO form CG001, edition 11-88 and CA 0012,edition 8-92. This Is to certify that the coverage listed above has been issued to the Covered Party named above for the policy period Indicated, notwithstanding any requirement,term,or cdnditEon of any contract or other document with respect to which this certificate may be issued or may pertain. The coverage afforded as described herein is subject to all the terms,exclusions, and conditions of the memorandum of coverage of the California Affiliated Risk Management Authorities,which is available for your review upon request. Pursuant to section(c)of the definition of"Covered Party"in the memorandum of coverage,the certificate holder named above is an additional covered party for covered claims arising out of the covered activity stated above and is subject to the limits stated above. Coverage is in effect as stated above and will not be canceled,limited, or allowed to expire except upon 30 days written notice to the certificate holder. Date: 5 N Renewal: No Risk Manager. s a 102 IM Met We 200,Swoeft CA 85M tole]= -fax IN) Muo COPY LIABILITY CERTIFICATE OF COVERAGE ADDITIONAL COVERED PARTY CERTIFICATE NUMBER, 2003 - 3 CERTIFICATE HOLDER: CONTRA COSTA COUNTY FLOOD CONTROL&WATER CONSERVATION DISTRICT ATTN: PRINCIPLE REAL PROPERTY AGENT PUBLIC WORKS DEPARTMENT,255 GLACIER DRIVE MARTINEZ,CA 94553 COVERED PARTY: CITY OF BRENTWOtOD DESCRIPTION OF COVERED ACTIVITY: IT IS HEREBY AGREED THAT CONTRA COSTA COUNTY FLOOD CONTROL&WATER CONSERVATION DISTRICT,ITS DIRECTORS,OFFICERS,AGENTS AND EMPLOYEES ARE NAMED ADDITIONAL COVERED PARTIES AS RESPECTS THE CITY OF BRENTWOOD'S AGREEMENT WITH THE DISTRICT WHICH GRANTS THE CITY THE RIGHT TO ENTER AND USE FLOOD CONTROL PROPERTY,DESCRIBED IN EXHIBIT A OF THE AGREEMENT, FOR RECREATIONAL PURPOSES SUCH AS SPORTS FIELDS, PARKS,TRAILS, LANDSCAPING,PEDESTRIAN AND VEHICULAR BRIDGES, BUT ONLY INSOFAR AS THE OPERATIONS DESCRIBED IN THE AGREEMENT ARE CONCERNED. MEMO POLICY NUMBER: CARMA 2003-1OGL EFFECTIVE DATE: 7/9/2003 LIMITS: $4,000,000 EXPIRATION DATE: 6/30/2004 (per occurrence) EXCESS OF: $1,000,400 THE FOLLOWING COVERAGE IS IN EFFECT: Bodily injury and property damage coverage provided herein is as broad as general liability ISO form CG001,edition 91-88 and CA 0012, edition 6-92. This is to certify that the coverage listed above has been issued to the Covered Party named above for the policy period Indicated,notwithstanding any requirement,term,or condition of any contract or other document with respect to which this Certificate may be issued or may pertain. The coverage afforded as described herein Is subject to all the terms,exclusions, and conditions of the memorandum of coverage of the California Affiliated Risk Management Authorities,which is available for your review upon request. Pursuant to section(c)of the definition of"Covered Party"in the memorandum of coverage,the certificate holder named above is an additional covered party for covered claims arising out of the covered activity stated above and is subject to the limits stated above. Coverage is in effect as stated above and will not be canceled,limited,or allowed to expire except upon 30 days written notice to the certificate holder. Date: 516/2003 Risk Manager: Renewal: No