Loading...
HomeMy WebLinkAboutMINUTES - 07082003 - C117 ................... .................................................I...... .............. ..............I........I...................................... eel I TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: July 8, 2003 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the San Ramon Creek at Casa Vallecita as recommended by the Public Works Director, Alamo area. [CDD-CP# 03-25] (District 111) Project No.: 7520-689324-03 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUS-nFICATiCN 1. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 17, 2003, pursuant to Public Contract Code Sections 22035 and 22050, to repair the erosion along San Ramon Creek at Casa Vallecita, Alamo area. Continued on Attachment: X SIGNATURE: —RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE PROVE OTHER SIGNATURE(S) ACTION Of so ON July 8, 2003 APPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS I hereby certify that this is a true and correct copyof an UNANIMOUS(ABSENT -r-y action taken and entered on the minutes of the Board AYES: NOES: of Supervisors on the date shown. ABSENT: ABSTAIN: *District III Seat VACANT* NL.,mp G:\GrpData\Design\Board Orders\BO 2003\San Ramon Repair at casaATTESTED: July 8, 2003 Vallecits 2.doc JOHN SWEETEN, Clerk of the Board of Supervisors Orig.D1w.Public Works(Design) and County Administrator Contact: N.Leary-313-2278 c: M.Hollingsworth,Design Public Works Accounting By atz' Deputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 17, 2003 regarding the repair of the erosion along San Ramon Creek at Casa Vallecita as recommended by the Public Works Director, Alamo area. [CDD-CP# 03-251 (District Ill) Project No.: 7520-6139324-03 DATE July 8, 2003 PAGE2 H. Financiallmpact: The total estimated contract cost is$380,000, initially funded by Flood Control Zone 3B Funds (100%). Recovery of project costs from those parties responsible for installation of faulty improvements and failure to maintain improvements associated with Minor Subdivision #105-88 is being pursued by the Flood Control and Water Conservation District. III. Reasons for Recommendations and Bag�groun;d: A. 4n June 17, 2003, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the erosion and failed bank slope protection. B. Repair status: The project design is 65% complete and is scheduled to be put out to bid on Judy 1, 2003 with a ten (10) day advertisement. Bids are scheduled to be opened on July 10, 2003. Construction is scheduled to begin on August 4, 2003. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will delay repair of the creek bank until 2004 resulting in loss of additional creek bank slope protection sending large amounts of silt downstream. The continued erosion could also result in loss of the private Casa Valiecita bridge severely limiting access to three residences.