Loading...
HomeMy WebLinkAboutMINUTES - 07222003 - C.10 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: MAURICE SHIU, CHIEF ENGINEER DATE: JULY 22, 2003 SUBJECT: APPROVE and AUTHORIZE the Chief Engineer or designee to execute the continuation of the Joint Funding Agreement, dated October 1, 1999 with the United States Geological Survey for stream gauging services in the amount of$8,550 for the period November 1, 2003 to October 31, 2004 and AUTHORIZE the Chief Engineer to make payment. San Ramon Area(District III).(Flood Control District Fund 2505)Project No.: 7505-6178161 SPECIFIC REQUUES7 OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION T. Recommended Action: APPROVE and AUTHORIZE the Chief Engineer or designee to execute the continuation of the Joint Funding Agreement(JFA), dated October 1, 1999, with the United States Geological Survey(USGS)for stream gauging for the period November 1,2003 to October 31,2004,and AUTHORIZE the Chief Engineer to make payment for the Flood Control District's share of the cost. Continued on Attachment: X SIGNATURE: ,. RECOMMENDATION OF BOARD COMMITTEE =A-I�PROVE � TER SIGNATURE(S): ) ACTION OF BO R.D bN ,;JULY 22, 2003 APPROVED AS RECOMMENDED XX OTHER I hereby certify that this is a true and correct VOTE OF SUPERVISORS copy of an action taken and entered on the minutes XX UNANIMOUS(ABSENT IV ) of the Board of Supervisors on the date shown. AYES: NOES: ABSENT: ABS'T'AIN: ATTESTED: .JULY 22, 2003 JOHN SWEETEN,Clerk of the Board G:\GrpData\F1dCtl\Administration\Uoard Orders\2003 BOTS6007-22.01doc Orig.Div: Public Works Flood Control of Supervisors and County Administrator Contact: Malcolm Weston(313-2292) cc: County Counsel CAD By Deputy PW Accounting&Flood Control Auditor—Control-Contracts SUBJECT: Joint Funding Agreement with the United States Geological Survey No.: 7505-6F8161 DATE: July 22, 2003 PAGE 2 II. Financiallmnact: No impact to General Fund. The total cost of the stream gauging program for the period from November 1, 2003 to October 31, 2004 is $17,100. The Flood Control District's cost is $8,550 and USGS's cost is $8,550. The Program will be funded entirely by Flood Control District fund 2505. IIL Reasons for Recommendations and Background: Since 1962, the USGS and the Contra Costa County Flood Control and Water Conservation District have been sharing the operation and maintenance cost of the stream gauge on San Ramon Creek at San Ramon under the USGS's Cooperative Water Resources Investigation Program. Long term,continuous records of stream flow are essential to the calibration and verification of watershed runoff data used by the District's Engineering Division for the design of all drainage improvements in the County. The continuous record collected at this site is also recognized for its unchanged upstream land use over the past 40 years. As a result of this consistency, other agencies also use this stream flow record to calibrate rainfall-runoff models. The Joint Funding Agreement(JFA)language is the same as the previous JFA dated October 1, 1996. IV. Consequences of Negative Action: Non-approval of the agreement would result in the loss of opportunity to obtain shared data used to predict storm runoff and to design flood control improvements.