,SUBJECT: CONTINUE the emergency action originally talon by the Board of
Supervisors on June 4, 2002 regarding the repair of the erosion along
Carquinez Scenic Chive, as recommended by the Public Warks Director,
Crockett area. [CDD-CP # 02-02] (District 11) Project No.: 0672-6U2526-02
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUST#F#CAT#CN
1. Recommended Action:
DETERMINE that there is a need to continue the emergency action taken by the
Board of Supervisors on June 4, 2002, pursuant to Public Contract Code Sections
22035 and 22050, to repair the erosion along Carquinez Scenic Drive, Crockett
area.
Continued on Attachment: X SIGNATURE:
j
_j,,RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
::APPROVE __ OTHER
SIGNATURE(S):'? >
'-= r
ACTION OF B3,dA ONAugmt : 2002APPROVED AS RECOMMENDED X OTHER
f`
VOTE OF SUPERVISORS
UNANIMOUS(ABSENT Nnnp }
AYES: Noes: I hereby certify that this is a true and correct copyof an
ABSENT: ABSTAIN: action taken and entered on the minutes of the Board
of Supervisors on the date shown.
NL:mp
G:\GrpData\Design\Board Orders\BO 20021Carquinez Scenic Drive Slide
Repair Emerg Cont 4.doc
Orig,Div:Public Works(Design) ATTESTED: hagmt 6, 2OD2
Contact: s.Lour-313-2245 JOHN SWEETEN, Clerk of the Board of Supervisors
c: M.Hollingsworth,Design and County Administrator
Public Warks Accounting
BST' Deputy
SUBJECT: CONTINUE the emergency action originally takerâ–º by the Board of
Supervisors on .lune 4, 2002 regarding the repair of the erosion along
Carquinez Scenic Drive, as recommended by the Public Works Director,
Crockett area.
[CDD-CP # 02-02] (District 11) Project No.: 0672-6U2526-02
DATE. August 6, 2002
PACE 2
11. Financiallmpact�
The total estimated contract cost is$260,000,funded by Local Road Funds(100%).
Ill. Reasons for Recommendations and Background.
A. On June 4, 2002, the Board of Supervisors declared an emergency and
authorized the Public Works Director to proceed in the most expeditious manner
to repair the erasion and failed pavement.
B. Repair status:
The project design was put out to bid on Judy 9, 2002 with a four (4) week
advertisement. Bids are scheduled to be opened on August 6, 2002.
Construction is scheduled to begin on August 26, 2002.
IV. Consequences of Negative Action;
Non-concurrence of the above recommendation will significantly delay repair of the
roadway, prolonging impacts to local access and could result in the loss of the entire
traveled way.