HomeMy WebLinkAboutMINUTES - 08062002 - C128 CAW TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: August 6, 2002 ,SUBJECT: CONTINUE the emergency action originally talon by the Board of Supervisors on June 4, 2002 regarding the repair of the erosion along Carquinez Scenic Chive, as recommended by the Public Warks Director, Crockett area. [CDD-CP # 02-02] (District 11) Project No.: 0672-6U2526-02 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUST#F#CAT#CN 1. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 2002, pursuant to Public Contract Code Sections 22035 and 22050, to repair the erosion along Carquinez Scenic Drive, Crockett area. Continued on Attachment: X SIGNATURE: j _j,,RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE ::APPROVE __ OTHER SIGNATURE(S):'? > '-= r ACTION OF B3,dA ONAugmt : 2002APPROVED AS RECOMMENDED X OTHER f` VOTE OF SUPERVISORS UNANIMOUS(ABSENT Nnnp } AYES: Noes: I hereby certify that this is a true and correct copyof an ABSENT: ABSTAIN: action taken and entered on the minutes of the Board of Supervisors on the date shown. NL:mp G:\GrpData\Design\Board Orders\BO 20021Carquinez Scenic Drive Slide Repair Emerg Cont 4.doc Orig,Div:Public Works(Design) ATTESTED: hagmt 6, 2OD2 Contact: s.Lour-313-2245 JOHN SWEETEN, Clerk of the Board of Supervisors c: M.Hollingsworth,Design and County Administrator Public Warks Accounting BST' Deputy SUBJECT: CONTINUE the emergency action originally taker► by the Board of Supervisors on .lune 4, 2002 regarding the repair of the erosion along Carquinez Scenic Drive, as recommended by the Public Works Director, Crockett area. [CDD-CP # 02-02] (District 11) Project No.: 0672-6U2526-02 DATE. August 6, 2002 PACE 2 11. Financiallmpact� The total estimated contract cost is$260,000,funded by Local Road Funds(100%). Ill. Reasons for Recommendations and Background. A. On June 4, 2002, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the erasion and failed pavement. B. Repair status: The project design was put out to bid on Judy 9, 2002 with a four (4) week advertisement. Bids are scheduled to be opened on August 6, 2002. Construction is scheduled to begin on August 26, 2002. IV. Consequences of Negative Action; Non-concurrence of the above recommendation will significantly delay repair of the roadway, prolonging impacts to local access and could result in the loss of the entire traveled way.