Loading...
HomeMy WebLinkAboutMINUTES - 07232002 - C90 fe TO BOARD OF SUPERVISORS FROM: MAURICE SHIU, PUBLIC WORKS DIRECTOR DATE: July 23, 2002 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 18, 2002 regarding the repair of the erosion along Wildcat Canyon Road, as recommended by the Public Works Director; APPROVE the Plans and Specifications for the project; AUTHORIZE the closure of Wildcat Canyon Road to through traffic, excepting emergency vehicles, at the project site, Orinda area. [CDD-CP # 02-03) (District li) Project Nos.: 0672-6U2550-02 & 0672-686387-02 Specific Request(s) or Recommendation(s) & Background & Justification 1. RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 18, 2002, pursuant to Public Contract Code Sections 22035 and 22050, to repair the erosion along Wildcat Canyon Road, Orinda area; APPROVE the Plans and Specifications for the project; AUTHORIZE the closure of Wildcat Canyon Road to through traffic, excepting emergency vehicles, at the project site. Continued on Attachment: X SIGNATURE: ' j,,RECOMMENDATION OF{COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE y,,APPROVE OTHER SIGNATURE(S). ,s ACTION!OF BOW ON APPROVED AS RECOMMENDED X OTHER July 23, 2002 VOTE OF SUPERVISORS I hereby certify that this is a true and correct X UNANIMOUS(ABSENT I ) copy of an action taken and entered on the AYES: NOES: minutes of the Board of Supervisors on the ABSENT: ABSTAIN: date shown. NL:mp G:1Grpflata\Design\Board Orders\1303 2002\Wildcat Canyon Rd slide Repair 3.doc ATTESTED: July 23, 2002 Orig.Div: Public Works(Design Division) John Sweeten, Clerk of the Board of Contact: Neil Leary (313-2278) Supervisors and County Administrator C: E.Kuevor,CAO Auditor-Controller Community Development , e PW Accounting... Construction By eputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on June 18, 2002 regarding the repair of the erosion along Wildcat Canyon Road, as recommended by the Public Works Director, APPROVE the Plans and Specifications for the project; AUTHORIZE the closure of Wildcat Canyon Road to through traffic, excepting emergency vehicles, at the project site, Orinda area. [CDD-CP # 02-03] (District Il) Project Nos.: 0672-6U2550-02 & 0072-6R6387-02 DATE: July 23, 2002 PAGE: 2 11. Financial Impact: The total estimated contract cost is $744,000, funded by Local Road Funds (100%). III. Reasons for Recommendations and Background: A. On June 16, 2002, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the erosion and failed pavement. r' B. Repair status: The project design was put out to bid on July 9, 2002 with a four (4) week advertisement. Bids are scheduled to be opened on August 6, 2002. Construction is scheduled to begin on August 26, 2002. The closure of Wildcat Canyon Road will occur on weekdays for the duration of the project, estimated to be eight weeks. The Closure request is due to the size of equipment anticipated to be used to construct the project versus the limited width of road available to perform the work. Additionally routing traffic through this work site would seriously hinder the Contractors productivity and which may cause the project to be partially completed when next winters storms arrive. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will significantly delay repair of the roadway, prolonging impacts to local access and could result in the loss of the entire w„ traveled way.