HomeMy WebLinkAboutMINUTES - 11291983 - 1.25 THE BOARD. OF SUPERVISORS
CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on November 29, 1983 , by the following vote:
AYES: Supervisors Powers, Fanden, McPeak, Torlakson, Schroder
NOES: None
ABSENT: None
SUBJECT: Right of Way Acquisition
Lower Pine-Galindo Creek
Project No. 7520-688668
Concord Area
The Board of Supervisors as the Governing Body of the Contra Costa County
Flood Control and Water Conservation District ORDERS THAT the following Right
of Way Contract is APPROVED, and the following Temporary Construction Permit
is ACCEPTED:
Grantor Document Date Payee Amount
Yvonne R. Giannini Temporary 11-8-83 Yvonne R. Giannini $405.00
and Joseph Giannini Construction and Joseph Giannini
Permit
Right of Way 11-8-83
Contract
Payment is for 2,414 square feet of temporary construction area.
The County Public Works Director is AUTHORIZED to execute the above
Right of Way Contract and Temporary Construction Permit on behalf of the District.
The County Auditor-Controller is AUTHORIZED to draw a warrant to the
payee in the amount specified to be forwarded to the County Real Property Division
for delivery.
1 hereby ow"the fhb to•tm and comet copy of
on action taken and entered on the minutse'ef 1110
bard of Supervisors on the dote chow".
ATTESTED: 9 ----
J.R. OLSSO Y, COUNTY CLERK
and ex officio Clerk of the Board
Orig. D t.• Public Works (RP)
cc: EERY Auditor-Controller (via R/P)
P.W. Accounting
B01129.T11
� � 31
THE BOARD OF SUPERVISORS
CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on November 29. 1983 by the following vote:
AYES: Supervisors Powers , Fanden,, McPeak, Torlakson, Schroder
NOES: None
ABSENT: None
SUBJECT: Right of Way Acquisition
Lower Pine-Galindo Creek
Project No. 7520-688668
Concord Area
The Board of Supervisors as the Governing Body of the Contra Costa County
Flood Control and Water Conservation District ORDERS THAT the following Right
of Way Contract is APPROVED, and the following Temporary Construction Permit
is ACCEPTED:
Grantor Document Date Payee Amount
Bay Area Rapid Temporary 11-17-83 Bay Area Rapid $100.00
Transit District Construction Transit District
Permit
Right of Way 11-17-83
Contract
Payment is for 55,244 square feet of temporary construction area.
The County Public Works Director is AUTHORIZED to execute the above
Right of Way Contract and Temporary Construction Permit on behalf of the District.
The County Auditor-Controller is AUTHORIZED to draw a warrant to the
payee in the amount specified to be forwarded to the County Real Property Division
for delivery.
1 Mnbl►oMIMy t1+at 1Me N a trw endoonw.KooPY�
an action won and entered an 1110 a""01114
Board of BupeMsors on the dab ahowa.
ATTESTED, 41 a_9 l E'?
J.R. OLSSC, . COUNTY CLERK
and ex Officio t„jerk of 1h0 Board
Orig. Dept.: Public Works (RP)
cc: County Auditor-Controller (via R/P)
P.W. Accounting
B01129.T11
32