Loading...
HomeMy WebLinkAboutMINUTES - 09112001 - C.24 ATO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS,BLACKHAWK GEOLOGICAL HAZARD ABATEMENT DISTRICT FROM: MAURICE SHIU, PUBLIC WORKS DIRECTOR DATE: September 11, 2001 SUBJECT: RATIFY the decision of the General Manager of the Blackhawk Geologic Hazard Abatement District to issue contract change orders to Siteworks Construction,Inc.,Danville area. (WO#5147) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: RATIFY the decision of William R. Gray and Company, Inc., as General Manager of the Blackhawk Geologic Hazard Abatement District(G.HAD), to issue contract change orders to Siteworks Construction, Inc. for the repair of the Lot 150 Red Pine Landslide Repair and Interceptor Ditch Replacement Project and increasing the payment limit by$9,707.64 to a new payment limit of$69,745.72, Danville area. II. Financial Impact: There is no impact on the County General Fund. The.Blackhawk GRAD is funded through revenues generated by County Service Area M-23. The Blackhawk GHAD will fund 100% of this contract. Continued on Attachment: X SIGNATURE: ,/RECOMMENDATION OF COUNTY ADMINIST TOR —RECOMMENDAT_I.QN OF BOARD COMMITTEE ,, PROVE _OT r. SIGNATURE (S): ti ACTION OF BOARVQ&Sept. 11, 2001 APPROVED AS RECOMMENDEDxx OTHER VOTE OF SUPERVISORS x UNANIMOUS(ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct copy of an action taken and SE sd entered on the minutes of the Board of Supervisors on the date shown. G:iGIpData',SpDisAlioaid Orderst2001`•A9 Septembee.RO 9-II-01 Silmulks.doc Orig.Div: Public Works(Special Districts) Contact: Skip Epperly(313-22531 ATTESTED: September 11, 2001 cc: Coumy Adminisu'ato, County Counsel JOHN SWEETEN, Clerk of the Board of Supervisors and County Blackhawk GI IAD cto William R.Gra_v and Co. Administrator Sitcw•orks Construction By ai Deputy I SUBJECT: RATIFY the decision of the General Manager of the Blackhawk Geologic Hazard Abatement District to issue contract change orders to Siteworks Construction, Inc., Danville area. (WO #5147) DATE: September 11, 2001 PAGE: -2- Ill.. Reasons for Recommendation and Background: A contract was awarded to Siteworks Construction, Inc. on December 13, 2000 in the amount of $60,038.08 to repair a landslide that occurred on the southwest side of the hill below 256 Red Pine Court, as well as a concrete ditch in the vicinity that was also deficient. The decision to award this contract was ratified by the Board of Directors of the Blackhawk GHAD on February 6,2001. Prior to the Contractor being able to mobilize to the repair site, the main access route was compromised, requiring the Contractor to develop alternative access to the work area. Additionally, the Contractor was asked to provide pumping equipment to accommodate the additional pumping distance,and make provisions for demolition and restoration of existing facilities and vegetation affected to gain access. These changes resulted in significantly more cost to the Contractor than was originally anticipated at the time of award of the contract. As a result,it was necessary to provide the Contractor with Contract Change Orders in the amount of$9,707.64 to cover the increased costs. Consequences of Negative Action: The work on this project has been completed. Board action is necessary to allow the General Manager to process payment to the Contractor regarding the above-mentioned work. BLACIUUWK GEOLOGIC HAZARD ABATEMENT DISTRICT BALANCING CHANGE ORDER C PROJECT NAME DATE Lot 150 Red Pine Landslide Repair June 30, 2001 and Interceptor Ditch Replacement Project To:Siteworks Construction, Inc., CONTRACTOR Change requested by: GRAD Construction Superintendent You ars hereby directed to snake the herein described changes from the plant and specification or do the following described work not included in the plans and specifications on this contracL NOTE: This change order is not effective until approved by the General Manger of the GRAD. The Iset percentage shown is the net accumulated increase or decrease from the original quantity in the Engineer's estimate. INCREASE IN CONTRACT ITEMS AT CONTRACT PRICES: Item ✓ 2 2 CYV(3%) Earthwork-Excavation/Fill @ S29.79/CY.............................................$59.58 6 46 LF(9%)Concrete Interceptor Ditch @$81.00/LF...........................................$3,726.00 DECREASE IN CONTRACT ITEMS AT CONTRACT PRICES.- Item RICES:Item ✓ 3 10 LF�-15%)Underdrains-Rock Drains @ $43.22/LF.............................................$432.20 4 18 LF (-10%)Underdrain-Discharge @$13.85/LF.................................................$249.30 DEC1fEASE IN FORCE ACCOUNT WORK —Estimated arriouzii per-Change Order#1 dated 6/18/01: $6,600.00 Actual final cost for Force Account Work: $6,336.06 Decrease in amount allotted to contractor for Force Account Work.................................$263.94 TOTAL INCREASE $2,840.14 BYREASON OF THIS CHANGE- 0- WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED. We,the undersigned contractor,have given careful consideration to the change proposed and hereby agce,if this proposal is approved that we will provide all equipmcn%furnish all ntarerials.except as may otherwise be noted above,slid perform all cervices necessary for the work abov specified,aTid will accept as full payment therefor the PTicvo shosm ubovc. Submitted:--'Alht YApproved: :��Y--A —Zcfutrucdon Superintendent General Mansgcr Date: -7 D Accepted by Contractor Date If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified GABlackhawk\Major Projects\150 Red Pine\Cottstrution Contracts\Balancing Change Order.doc I I BLACKHAWK.GEOLOGIC HAZARD ABATEMENT DISTRICT CONTRACT CHANGE ORDER NO. 2 Project Name: Lot 150 Red Pine Landslide Repair Date: June 18, 2001 and Interceptor Ditch Replacement Project To: Siteworks Construction,.Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the General Manager ofthe GRAD. Desaifninn of work to be daue,estimate of quantida,and pricy to ba paid She bdwom addidanal work st conrna prier,ogrud prim and force account-Unlcu dherwisc 2Md.l rates for rental of oquipmmt cava only such time as Upipmmt a actually used aadno allowaneowill be made for We time. Charrgeroqucst dbyCmLAwction.appaintcnd=oftbcGtIAD. AD.TU.S'TMENTS EV COMPENSATION AT AGREED PRICE. In lieu of off-site disposing of concrete spoils as a component of composite item of work#6,provide on-site disposal in accordance with Engineer's direction. A lump sum credit of $ 1,612.50 (per Siteworks letter dated May 3,2001), will be applied to offset the total number of units paid at the original unit price for the composite item of work#6,as follows: Item#6-Concrete InterceptorDitch 616 if installed @$2.6177=$(1,612.50) Estimated Decrease: $1,612.50 Total Estimated Cost Decrease$1,612.50 or Increase BYRElSONOFTHISCM&GE -0 - WORKINGDAYS=NSIONOFTB.&MUBEALLOR-D. We ihe hmdarsignad come aor have given careful eocsiderzion to dhe change proposed and hereby upee,iflbia proposal is approved,that we will provide all equgmhaa,furnish all materials,eKLV as miy Acrwisv beetled above,and perform all services neonsary for the work above specified, and will uoovt us full payment therefor the prices shown above Submitted: Date: b �Consfzuction Su inter Approved: Date: O . Gf Cvral mmga Date: 7 S o Accepted by Contractor If the Contractor do"not sign acceptance ofthir order,hie arturtion a directed to the requirements trf the specification or to proceeding snrh the ordered work andfiling a warren proresr wAM the rime tharcin ipoci/iad. Cr\Alackhswk\Major Projects\150 Red Pme\CaaAndioo C®tom\tbangc Order 07.doc