HomeMy WebLinkAboutMINUTES - 08142001 - C.23 C?
yL
TO: BOARD OF SUPERVISORS Contra
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR «;;;::;;; s Costa
u y. Count
DATE: August 14, 2001 Y
SUBJECT: AUTHORIZE and APPROVE the Public Works Director to execute Amendment No. 1 to the
contract with Shutt Moen Associates increasing the contract payment limit by $15,100 to a new
payment limit of$91,600 for the design of the airfield electrical system and airfield signage
upgrade at Buchanan Field Airport, Concord area. (90% Federal Aviation Administration, 10%
Airport Enterprise Fund)
SPECIFIC REQUEST(S)OR RECOMMENDA'HON(S)&BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Public Works Director to execute Amendment No. 1 to the contract
between Contra Costa County and Shutt Moen Associates for Airport Improvement Program(AIP)#10;and
H. Financial Impact
Amendment No. 1 increases the amount of Shutt Moen Associates contract by$15,100.00,to complete the
final engineering and design of A1P#10. Grant amount increases will be shared by the FAA and the Airport
Enterprise Fund (of which 90% is paid by the FAA and 10% is pa' by the Airport Enterprise Fund).
Continued on Attachment: SIGNATURE:
_RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON AUGUST 1401 APPROVED AS RECOMMENDED&2j_OTHER
I hereby certify that this is a true and correct copy of an action
VOTE OF SUPERVISORS taken and entered on the minutes of the Board of Supervisors on
xx UNANIMOUS(ABSENT ) the date shown.
AYES: NOES:
ABSENT: ABSTAIN:
ICF:df ATTESTED: AUGUST 14 , 2001
C:\My Documents\Word fi1es\B0\3001\bo7-17 Shutt Moen.doc
JOHN SWEETEN, Clerk of the Board of Supervisors and County
Orig.Div: Public Works(Aiiport)
Contact: (David Mendez 646-5722)
Administrator
cc: County Administrator
Public Works Director
Public Works Accounting
Auditor/Coniroller By ,Deputy
Aviation Advisory Convnittee
Federal Aviation Administration
CALTRANS
SUBJECT: AUTHORIZE and APPROVE the Public Works Director to execute an Amendment No. 1 to the
contract with Shutt Moen Associates increasing the contract payment limit by$15,100 to a new
payment limit of$91,600 for the upgrade design of the airfield electrical system and airfield
signage at Buchanan Field Airport, Concord area. (Airport Improvement Program #10).
DATE: August 14, 2001
PAGE: 2
III. Reasons for Recommendations and Backt1round:
On September 27, 1994 the Board of Supervisors approved and authorized the Public Works Director,or his
designee,to accept a Federal Grant from the Airport Improvement Program in the amount of$1,000,000.00
(90%of the total project). The project included purchasing of land,upgrades to the airfield electrical system
and upgrades to the airport signage system at Buchanan Field Airport.
On March 25, 1997 the Board of Supervisors approved a contract in the amount of$76,500.00. Amendment
#1 will increase the contract amount from $76,500.00 to $91,600.00.
The purchase of the parcel of land was completed in May 1995. The final component of this Grant has been
under initial design and review for several years. The FAA is in the final stages of their approval of the
airfield sign plan. However,due to the FAA approval delays the consultant's charge rates have increased by
$15,100.
IV. Consequences of Negative Action:
The airfield electrical and sign system upgrades would not be completed at Buchanan Field Airport.
FIRST AMENDMENT TO AGREEMENT
AIP Project No. 3-06-0050-10
The Agreement heretofore made on March 25, 1996, by and between the County of Contra
Costa (COUNTY) and Shutt Moen Associates, a California corporation (ENGINEER), is
amended as follows:
1. On page 1 of the agreement, paragraph 2, delete the following:
• Medium Intensity Runway Edge Lighting for Runway 1R-19L
2. Under Section 2, Special Engineering Services, delete Item B.1.
3. Under Section 2, Special Engineering Services, add the following:
C. Perform a preliminary evaluation of the existing airport electrical vault. Pre-
pare an itemization of vault equipment, type and rating of regulators, regula-
tor circuit identification, and regulator capacity. Make recommendation on
vault improvements, regulator replacement, and possible circuit modifica-
tions for control of airfield lighting. This item consists of a preliminary analy-
sis in order to plan future improvements and does not include the design of
any recommended improvements.
4. Under Section 4, Compensation for Services, delete Item A and substitute the
following:
A. For the Basic Design Services outlined in Section 1, Paragraph A above, the
ENGINEER shall be paid a fixed fee of Sixty—Seven Thousand Seven
Hundred Dollars ($67,700.00).
5. Under Item 4, Compensation for Services, delete Item D and substitute the follow-
ing:
D. For the Special Engineering Services outlined in Section 2, Paragraph B and
C, the ENGINEER shall be compensated according to the Schedule of Fees
shown in Attachment 1. The estimated fee for this work is Nine Thousand
Nine Hundred Dollars ($9,900.00).
6. To Page 16 of 16, add the following:
27. Construction Contract Provisions. Should any design work covered by this
Agreement result in a Construction Contract between the County and a Con-
tractor, the County agrees to require the Contractor to name Shutt Moen As-
sociates as Additional Insured on insurance policies required of Contractor
and to provide the same Indemnification in favor of Shutt Moen Associates
as the County requires for itself.
7. In the attachments to the agreement, Attachment 1, Page 3 of 3, delete Project No.
3, Runway 1R-19L Lighting.
8. In the attachments to the agreement, delete Attachment 2, Schedule of Fees dated
September 1, 1996, and insert the attached Schedule of Fees dated March 1, 2000.
Except as specifically modified by this Amendment to the Agreement, all terms and condi-
tions of the Agreement, as amended, shall remain in full force and effect.
COUNTY OF CONTRA COSTA, SHUTT MOEN ASSOCIATES
CALIFORNIA
BY �� BY
Titrin ipal
Date /2/310! Date
NAC1ients\CC0\Contract\CC0 A1P-10.amendLdoc
SHUTT MOEN ASSOCIATES
SCHEDULE OF FEES
Classification Hourly Rate
Principal Engineer $130.00
Associate Engineer $115.00
Engineer IV $ 95.00
Engineer III $ 85.00
Engineer II $ 75.00
Engineer I $ 60.00
Principal.Planner $130.00
Senior Planner $ 95.00
Planner III $ 80.00
Planner II $ 60.00
Planner 1 $ 50.00
Senior Technician $ 75.00
Technician IV $68.00
Technician III $60.00
Technician II $ 55.00
Technician I $45.00
Administrative Analyst $ 50.00
Senior Word Processor $46.00
Word Processor $ 40.00
Survey Equipment; $80.00 per day.
Subsistence: Actual subsistence costs will be charged for overnight site visits.
Per Diem: Per Diem shall be charged as appropriate. Per Diem will be established at a mutually agreed upon rate.
Transportation: As detailed below:
1. Airline travel—coach class air fare.
2. Owned vehicles at$0.40/mile.
3. Owned aircraft: Bonanza F33 $120.00 per hour
Piper Archer $90.00 per hour
4. Other, including rented vehicles, at actual cost.
Supplies and Materials: Costs of telephone,supplies, blueprints,photostats, printing,binding, and other expenses
incurred by each assignment are furnished on the basis of invoiced cost plus ten percent(10%).
Subconsultant Services: Furnished on the basis of actual cost plus ten percent(10%).
March 1,2000
Buchanan Field Airport
Revised Engineering Services Cost Estimate
AIP 3-06-0147-04
14-Mar-01
BASIC DESIGN SERVICES
Meetings With PG&E/FAA/County
Principal 10 Hours @ $130.00 $1,300.00
Engineer IV 24 Hours @ $95.00 $2,280.00
Aircraft 2 Hours @ $120.00 $240.00
Subtotal $3,820.00
Inventory Existing Electrical
Principal 4 Hours @. $130.00 $520.00
Engineer IV 32 Hours @ $95.00 $3,040.00
Senior Technician 24 Hours @ $75.00 $1,800.00
Aircraft .1 Ea. @ $120.00 $120.00
Subtotal $5,480.
Design New/Modify Signs
Principal 8 Hours @ $130.00 $1,040.00
Engineer IV 32 Hours @ $95.00 $3,040.00
Senior Technician 32 Hours @ $75.00 $2,400.00
Subtotal $6,480.00
1 of 3
Design New/Modify Electrical Service
Principal 8 Hours @ $130.00 $1,040.00
Engineer IV 32 Hours @ $95.00 $3,040.00
Senior Technician 40 Hours @ $75.00 $3,000.00
Subtotal $7,080.00
Specifications & Bid Documents
Principal 8 Hours @ $130.00 $1,040.00
Engineer IV 32 Hours @ $95.00 $3,040.00
Clerical 24 Hours @ $40.00 $960.00
Expenses 1 Hours @ $530.00 $530.00
Subtotal $5,570.00
Bidding
Principal 4 Hours @ $130.00 $520.00
Engineer IV 20 Hours @ $95.00 $1,900.00
Clerical 8 Hours @ $40.00 $320.00
Aircraft 1 Hours @ $120.00 $120.00
Subtotal $2,860.00
Electrical Subconsultant
MTH Engineers 1 Hours @ $33,100.00 $33,100.00
SMA Mark-up 10% Hours @ $33,100.00 $3,310.00
Subtotal $361410.00
TOTAL BASIC ENGINEERING $67,700.00
2of3
SPECIAL ENGINEERING
Evaluate Existing Regulators and Vault Room (Contract Item 2.C.)
Principal 8 Hours @ $130.00 $1,040.00
Engineer IV 24 Hours @ $95.00 $2,280.00
MTH Engineers 1 Hours @ $2,300.00 $2,300.00
Senior Technician 16 Hours @ $75.00 $1,200.00
Clerical 4.5 Hours @ $40.00 $180.00
Subtotal $7,000.00
East Side Electrical Service & REIL Problem (Contract Item 2.13.)
Principal 8 Hours @ $130.00 $1,040.00
MTH Engineers 1 Hours @ $1,000.00 $1,000.00
Senior Technician 8 Hours @ $75.00 $600.00
Clerical 7 Hours @ $40.00 $280.00
Subtotal $2,920.00
TOTAL SPECIAL ENGINEERING $9,920.00
GRAND TOTAL $779620.00