Loading...
HomeMy WebLinkAboutMINUTES - 08142001 - C.122 k BOARD OF SUPERVISORS FROM: TRANSPORTATION, WATER AND INFRASTRUCTURE •... ...... �� +� Contra COMMITTEE _ � Costa DATE: AUGUST 6, 2001 .. ..... " County SUBJECT: UPDATE TO THE MEASURE C-88 STRATEGIC PLAN SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS ACCEPT report from the Transportation Water and Infrastructure Committee on the Contra Costa Transportation Authority's update to the Measure C-88 Strategic Plan. FISCAL IMPACT None to the General Fund. BACKGROUND/REASONS FOR RECOMMENDATIONS On July 19, 2001, the Contra Costa Transportation Authority (Authority) released its draft update of the Measure C-88 Strategic Plan (Strategic Plan)for review and comment (see Exhibit A). The Plan considers programming commitments for Measure C-88 sales tax revenues for the next seven years through 2007. The Plan was previously updated in 1998. The Authority initiated the current update last year, with the objective of using sales tax funds in conjunction with gas tax revenue made available through the 2002 State Transportation Improvement Program (STIP) in order to advance the county's highest priority transportation projects. On August 6, 2001, the Transportation, Water and Infrastructure Committee received a report the Strategic Plan and requested that this report be forwarded to the Board of Supervisors for your information. The remainder of this report from the Committee highlights the major issues raised by the draft Strategic Plan. CONTINUED ON ATTACHMENT: X YES RECOMMENDATION OF COUNTY ADMINISTRATOR X RE7"-,7su TI OF BO RD COMMITTEE APPROVE OTHER SIGNATURE(S): u ervisor John Gioiae sor Donna Gerber ACTION OF BOARD N APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE /UNANIMOUSABSENT AND CORRECT COPY OF AN ACTION TAKEN A ( AND ENTERED ON THE MINUTES OF THE AYES: NOES: BOARD OF SUPERVISORS ON THE DATE ABSENT: ABSTAIN: SHOWN. Contact: Steven Goetz (925/335-1240) cc: Community Development Department (CDD) ATTESTED Public Works Department JOHN WEE EN, CLERK OF THE BOARD OF SUPERVISORS AYAND COUNTY ADMINISTRATOR B - DEPUTY S:ltransportation\strategicplan.bo.doc 'ADOif POSITIONS ON SMART GROWTH LEGISLATION MAY 14, 2001 Page Two BACKGROUND/REASONS FOR RECOMMENDATIONS (continued) New Funding Commitments Proposed by the Plan: The draft Strategic Plan forecasts revenue in 1988 dollars to permit easier comparison with the Expenditure Plan approved by the voters in 1988. The draft Plan proposes to program $39.1 million ($88) in sales tax revenue to help fund projects receiving commitments from the 2002 STIP. This is in addition to commitments of sales tax revenue made in the 1998 Strategic Plan, which programmed funds to FY 05. The draft Strategic Plan proposes to program $11.5 million ($88) in additional sales tax revenue to help fund other high priority projects in the County. These recommendations by Authority staff will leave about$35.6 million ($88)available to program for future projects until the sales tax ends in FY 09. Adjustment of Funding Caps Set in the 1998 Plan: Funding caps were initially set in 1991 by the Authority to compensate for reduced revenue projections. The draft Strategic Plan proposes to adjust these caps, not to account for reduced revenue, but to fund priority projects that did not compete well for 2002 STIP funds. The Authority proposes to reduce the cap for the Commuterway category and raise the cap for the 1-680 Corridor category, thereby transferring $6.9 million ($88) to several Central County arterial projects and the auxiliary lanes on 1-680 which were unsuccessful in seeking STIP funds. These projects are not eligible for sales tax revenue under the Commuterway category, but they are eligible for sales tax revenue under the 1-680 Corridor category. The Authority also proposes to raise the cap for the State Route 4 East category to enable programming an addition $4 million ($88) to help extend a freeway-widening project to G Street in Antioch. This adjustment did not require reducing caps for other categories since the projection of sales tax revenue during the life of Measure C-88 increased by$4 million in the draft Plan. Draft Program of Proiects: Tables are included in Exhibit A that describes when the sales tax revenue will be used on the various transportation projects. Projects sponsored by Contra Costa County are as follows: - No. 1213 Pleasant Hill-Taylor Safety Realignment. This plan updates the schedule and commitment of funds from the prior plan. Funds are programmed for studies only. - No. 1216 Pacheco Blvd. Blum-Arthur. Funds are added, in conjunction with other sources, to fully fund construction of the initial phase of this project. - No. 1219 Iron Horse Trail Overcrossing at Treat Boulevard. This plan updates the schedule and commitment of funds from the prior plan. This project is fully funded. Proiects for Future Strategic Plans: $33.9 million ($88) in uncommitted sales tax revenue remain in the Commuterway and Rail to Eastern Contra Costa categories. Authority staff recommends leaving these funds unprogrammed at this time pending the outcome of the Route 4 Corridor Transit Study. Be aware that the Countywide Express Bus Study is likely to recommend millions of dollars in upgrades to HOV facilities, which could also compete for Commuterway funds. In addition, there may be increasing pressure from other regions in the County to transfer funds from the Commuterway category to other categories in the Expenditure Plan so that other types of projects in other regions could receive sales tax revenue. Process for Review of the draft Plan: Comments on the draft Plan are due to the Authority on September 14. Each Regional Committee prior to that date is scheduling the draft Plan for review. It is likely that some minor projects maybe added to the Plan in areas where funding capacity exists. Some committees may also focus their comments on polices that the Authority should adopt in the Plan that would affect remaining uncommitted Measure C revenue. Also be aware that County staff has reviewed the draft Plan as it affects the County-sponsored projects. If additional information on this matter is needed, it can be scheduled for the Board meeting on September 11th. Exhibit A: July 19,2001 correspondence from the Contra Costa Transportation Authority S:1tra nsportation\stratepicplan.bo.doc EXHIBIT A CONTRA COSTA TRANSPORTATION A UTHORITY COMMISSIONERS: July 19,2001 Irma Anderson To:. Measure C Project Sponsors Chair Donald P.Freitas Re: Update of the 1998 Strategic Plan Vice-Chair Dear Sir/Madam: JenetAbelson The Contra Costa Transportation Authority (CCTA) is in the process of updating.the 1998 Strategic Plan. Enclosed you will find project(s) fact sheets and the Strategic Plan Program Charlie Abrams of Projects as.well as Issue Paper #2,which summarizes the proposed changes. The MariaA.Iegria Program of Projects identifies the amount of Measure C funds programmed and the fiscal Donna Gerber years to be requested. Federal Glover . Please review the attached fact sheets and Program of Projects to ensure the correctness of Wade Gomes the information presented (especially as it relates to fund amounts and schedule).Your comments should be received by the Authority no later than September 14,2001. Millie Greenberg Julie Pierce On a separate but related matter,we would like to remind you that in order to secure Measure C funds for your project,typically the following steps are required: on Tatzin 1. . If seeking reimbursement for design, request appropriation of funds for design by sending the Authority a letter detailing project scope, schedule, financial plan, and Robert K.McCleary Executive Director activities seeking reimbursement. 2. Request peer review at the 35% and 65°o design stages. 3. If seeking reimbursement for construction, request appropriation of funds for construction after the peer review is completed. Please remember to provide ample time for completing the above steps before starting design.or construction of the project. Authority's committees and full board actions of the above steps are required. The Authority's existing policy does not allow for reimbursement for activities that take place prior to the approval of appropriation resolutions. For more details about the appropriation process please refer to Appendix E in the 1998 Strategic Plan. Hookston square Should you have any questions, please call Hisham Noeimi at(925) 256-4731. 3478 Buskirk Ave Suite 100. Sincerely, Pleasant Hill . G4 94523 Robert McCleary PHONE: . 925/407-0121 Executive Director FAX.. Attachments 925/407-0128 C:\WPFrLF5\1-CCrA MTG\2001 MTGS\July 2001\7-181tr to proj5pons HN.doc nttp.-lAff .cctaxet CONTRA COSTA TRANSPOR TA TION A UTHORITY COMMISSIONERS: Irma Anderson July 19, 2001 Chair Donald P.Freitas. Vice-Chair To: Regional Transportation Planning Committees Janet Abelson Re: Update of the 1998 Strategic Plan Charlie Abrams Dear Sir/Madam: Maria.Alegna Donna Gerber The Contra Costa Transportation Authority (OCTA) is in the process of updating the Federal clover 1998 Strategic Plan. Enclosed you will find projects fact sheets and the Strategic Plan Program of Projects as well as Issue Paper #2,which summarizes the program Wade Gomes changes. The Program of Projects identifies the amount of Measure C funds Millie Greenberg programmed and the fiscal years to be requested. Julie Pierce The Authority is seeking formal input from the Regional Committees. Please review .---r on ratzin the attached fact sheets and Program of Projects to ensure the correctness of the information presented. Should you have any questions, please call•Hisham Noeimi at (925) 256-4731. .The Authority should receive your comments no later than Robert.K.McCleary xecutive Director September 14, 2001. Sincerely, Robert McCleary Executive Director attachments Hookston Square 3478 Buskirk AveCA\ypFILES\I-CCTA MTG\2001 MTGSUuly 2001\7=16 Itr to RTPCs HN.doc. Suite 100 Pleasant Hill CA.94523. PHONE:. 925/407-0121 FAX 925/407-0128 http.-1Avm.c6ta.net, 2001 Strategic Plan Issue Paper #2 Programming Policies and Options A. OVERALL APPROACH Because many projects are jointly funded with Measure C and State Transportation Improvement Program (STIP)funds,the Authority decided in January 2001 to consider the adoption of the 2001 Strategic Plan in concert with the 2002 State Transportation Improvement Program(STIP). This delay was appropriate because several of the projects to be included in the STIP are to be jointly funded with state/federal funds and Measure C. Other projects are eligible for funding with either Measure C or STIP funds. Parallel consideration of both programming documents will therefore ensure consistency, while allowing some flexibility in using Measure C or STIP funds for certain projects. .The 2001 Strategic Plan considers programming commitments for the next seven years through FY 2007. The 2002 STIP considers programming commitments through FY 2007. B. ADOPTED REVENUE PROJECTIONS In October 2001,the Authority approved Issue Paper#1, which outlined the overall approach and provided updated revenue projections. Revenues(in 1988 dollars)were forecast to be $753 million over the twenty-year life of the Measure, an increase of$4 million from the 1998 Plan. These projections were based on actual tax receipts to date and assumed that the average inflation-adjusted growth rate in sales tax revenues from FY 1989-90 through FY 1999-00 would be replicated in the next ten years. C. REVIEW OF PRIOR PROJECT SCHEDULES AND COMMITMENTS Consistent with prior.practice, a review of projects that were included in the 1998 Plan was completed last fall. The review of individual projects considered: (1)whether they remained on their original schedule, (2) whether they would need a funding adjustment in the 2001 Plan Update, (3) whether they may be candidates for additional funds in the 2002 STIP, and (4)whether any significant issues had arisen since the 1998 Plan was adopted that might cause the.Authority to exclude the project from the 2001 Plan. The Authority reviewed the staff report in December 2001, and approved the adjustments in schedule and funding for most projects. With respect to the status of two projects included in the 1998 Strategic Plan,the Authority decided the following: EI Cerrito Parking Structure To continue the project(Project 230 1)in the 2001 Strategic Plan---programmed in FY 2003—with a deadline of 24 months for BART and El Cerrito execute binding agreements for a specific parking augmentation project. The Authority also requested the City of El Cerrito to provide progress reports every six months. The draft Program of Projects includes funding for the Parking Structure in FY 2003; the City of El Cerrito made its first progress report in June 2001. Brookwood Off Ramp The authority deferred action on the project(Project 1702) and its subsequent phase, the SR24 Auxiliary Lane Project(Project 1610)until the City reviewed the revised Project Study Report(PSR). (The Authority had previously taken a position that the City would have to use its own resources to re-design the project and secure Caltrans approval, because the City had reneged on its earlier approval of a specific design concept. A revised project study report was developed with Caltrans'assistance). The Orinda city council subsequently met on June 5, 2001 and recommended against any widening of the off-ramp, supporting instead only the auxiliary lane between Gateway and Brookwood off-ramp. The specific Council action was as follows: July 18, 2001 Page 1 of 3 "The council does not support the proposed project to widen the Brookwood Road off-ramp. The council recommends that Caltrans be requested to explore construction of the auxiliary lane as the first step toward achieving traffic safety improvements, rather than as a second phase following completion of the proposed off-ramp widening project. This would eliminate the line of vehicles waiting to exit SR-24 from impeding through traffic moving in the eastbound direction." Contra Costa Transportation Authority staff and Caltrans believe that widening of the off-ramp is a necessary pre-requisite to the auxiliary lane, and an integral component of the solution to the safety and capacity problem at the off-ramp. Nevertheless, at its June 21, 2001 meeting, the TCC made a motion to acknowledge the importance of the auxiliary lane project, and encouraged Orinda to request Caltrans to study the feasibility of the auxiliary lane-only project as an alternative in the supplemental Project Study Report. If the auxiliary only project does solve the congestion and safety issues if could then be eligible for consideration in the 2004 STIP. Given the city council decision, staff recommends dropping the Brookwood off ramp widening project(#1702) from the Strategic Plan. Since the project is currently programmed with a mix of Lamorinda and Southwest Arterials Measure C funds, the Lamorinda Program Management Committee (LPMQ and SWAT would be involved in recommending how to program approximately 5928,000 under the Gateway/Lamorinda Traffic Program Category. In addition, SWAT would also be involved in recommending how to program an additional 5'939,000 available under the Major Arterials-Southwest Region Category. D. ADJUSTMENT OF CAPS SET IN THE 1998 STRATEGIC PLAN Following the recession in the early 1990's the Authority imposed expenditure"caps"on certain project categories to compensate for the reduced revenue projections. Staff now recommends adjusting funding caps as follows: Interstate 680 Corridor: Staff recommends raising the cap from 80%to 87.5% creating $7.5 million (in 1988 dollars)for additional programming in this category. Raising the cap will allow programming of funds for three local arterial projects that TRANSPAC had originally submitted for STIP funding. The additional programming capacity in the SWAT area would be tentatively earmarked for the 1-680 Auxiliary Lane project. (Historically, 1-680 category funds have been split 77%/23% between TRAIVSPAC and SWAT). Specifically the following is included in the Draft Program of Projects.- Project rojects:Project Project Fiscal Year Programmed Programmed Number Amount Amount (1988 $) (Escalated $) Commerce Avenue Extension 1214 FY 2003 2.59M 4.29M Pacheco Boulevard 1216 FY 2003 1.83M 3.03M Alhambra Avenue 1203 FY 2003 3.60M 5.96M I-680 Aux Lane (seg 2) 1106 FY 2008 2.70M 5.32M Contra Costa Commuterway: Staff recommends reducing the cap from 80% to 65%to offset raising the cap on the Interstate 680 Corridor category. This will in effect reduce funding by$6.9 million (in 1988 dollars) —from $36.8 million to $29.9 million. North Richmond/Interstate 80 Bypass (Route 93h. Since the project is completed, staff recommends adjusting the cap to 98.4%to reflect actual project expenditure. July 18, 2001 Page 2 of 3 Route 4 (east): Staff recommends raising the cap to 95%to provide an additional $4 million(1988$)to assist with the next stage of widening of Route 4 east from Somersville Road to"G" Street/Contra Loma in Antioch; additional fund sources would be needed to complete the widening. E. INTEGRATION WITH 2002 STIP PRIORITIES In order to complement the proposed funding in the draft 2002 STIP,the draft Program of Projects includes additional Measure C funds for four state highway projects that also are to be funding with STIP funds 1. Route 4 Railroad to Loveridge 2. Route 4 Loveridge to Somersville 3. I-680/Route 4 Interchange 4. 1-680 Auxiliary Lane Diablo to Bollinger The 2002 STIP recommendations include additional STIP funds(in current dollars)for the following projects that are also to receive Measure C funds in the 1998 Strategic Plan: 1. 1-680 HOV(N. Main to Marina Vista) (Project 1116): $8 million 2. SR4 Widening-Loveridge to Somersville Project 1406): $27 million 3. 1-680/SR 4 Interchange—Phase 1 (Project 1117): $5.5 million 4. 1-680 Auxiliary Lane-Segment 3 (Project 1106): $3.6 million Staff recommends that the 2001 Strategic Plan reflect the following amounts(in 1988 dollars)to complement the proposed 2002 STIP commitments: 1. SR4-Railroad to Loveridge Rd(Project 140513): $13.47 million (funded from the BART Rail Ext. Category) 2. SR-Loveridge to Somersville(Project 140613): $15.07 million (funded from the BART Rail Ext. Category) 3. SR4-Loveridge to Somersville (Project 1406): $1.02 million (funded from the Route 4 East Category) 4. 1-680/SR Interchange(project 1117: $1.24 million to provide for environmental clearance. (funded from the 1-680 Category) 5. 1-680 Auxiliary Lane(project 1106): $8.3 million (funded from the 1-680 category) F. DRAFT PROGRAM OF PROJECTS Staff has prepared a draft "Program of Projects"(attached)which reflects all of the changes described above. Because of the proposed deletion of the Brookwood project, additional programming of$586,000 (1988$) or approximately $939,000 in current dollars is possible in the Southwest Arterials project category. Similarly, the Lamorinda project category has programming capacity of$579,000 (1988$) or approximately $928,000 in current dollars. Staff suggests that SWAT(in conjunction with the LPMC for the latter amount) be asked to develop recommendations as to how these funds should be programmed. Funds also remain in the"Rail to Eastern Contra Costa"and"Commuterway" categories. Staff recommends !eaving these funds unprogrammed at this time pending the outcome of the Route 4 Corridor Transit Study. G. REMAINING ISSUES Following Authority review,the draft program of projects will be circulated to the regional committees for comment. Comments should be received by September 14, 2001. Thereafter,the TCC will review the comments of the regional committees and the final 2001 Strategic Plan will be presented to the APC and full authority for adoption in October 2001. July 18, 2001 Page 3 of 3 7 0 0 N n O 00 W M u 0,? O GD O v r-4 00 Ln ~ Ln 00 O o M M lin• 1,0 O 000 -4 C O M 0 0 0 0 -1 tV o6 a0 O � �c 0 0 0 O o o O N M g cr 4 M O L� p o 0 Z ' a\ O1 O N N "o o un Q x ER to to Efl ffl H} Ef? Ei} ER EE) H3 K-) % Efl 00 i � V v p n M N �I o cq °\ °\ \D . ee. m li y O O rn O N �0 000. O O 14.4 O O o O cV N p, Lf) O Ln M M Cl \10 o 0 0 Cl 0 0 N00 O 00 Ln a\ O L6 Q P. % % % &�4 � % OAT O Itzp O ~ �m m O 0 m N '-4 O � O o o N N .44M O 000 O n '14 00 0� m r-� O o o � rn CV o 4 L� Ln �0 G } O vi uj O\ Ln O\ N O, M 1M M 10 o O p m rq 00 M M \0 N O\ 4 Ln O O t,� O 000 � N �O4 M � IZV N 11 �CC r P-4 ff-? bq to jr, Ef} % ER ER Eft EF-, ER EF} ER H} G �O y Ci e ff y O O O N o 0 0 0 0 0 0 EFt LO Ln to d! Lo O O O n U L� K K 00 O\ m 00 00 00 G \b 000 05 O 00 00 00 ON 00 N � r� 00w 00 O LI Cr) 0 0 0 0 O O V ; N .O H 0ON 0 0 0 0 It O O O O p U 0 +, o a N 0 0 0 0 N 6 0 0 0 y r•� O 0 0 �0 0 0 0 0 m 0 0 0 0 N .� 6�J aLf) M rq 00 O Ln N 00 O\ M C\ O O N 'C M 00 \�O o iri o rn O\ O cc C) y w O R 00 .N "o N V4 a r-1 M N -,t r4 u') O -4 Cf) ff} » csy tq % PFJ- i q Ef} % fA. ER EP EPr ER00 �, •� p v OD 0 O O O O 0o 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 X [ o o c O o o O O (=) o oC:) 0 0 p O o 0 0 0 0 o 0 0 0 0 0 0 'o Q. va p o C, oc o 0 0 0 � 0 0 0 0 00 o Q N 00 -114 ,-, III r-4 'M LO M in CU r. u 00 O 3 ti z N M N M ti G tC w Lr) Ln tf i tl) to m t ) N N K 00 y u Ln Lr) m U) m Ln Ln Ln Ln m m � -0 •'C! P4 O\ m a\ O\ Q` m O\ m O\ M Q\ ¢X ,� E 4) O v Ca o ¢ m cc y � � 16� Q c p R+ U � W , * G y cl 4J o �o 0 3 i * d U +-r ER R Cn z n cacacno w y 'C3 y m O c t ? OD O b U Z o a v Z y i y U y ° v o ° ° L Ea $ n ° U w b bw M co O 'C1 O (v ami C) � p: u � x Q cn y ca o z Cd 0 to Q O X CL G 61 C1. U a O y F" y cu C,3 :3 Zv 0 G 04 •p°"'0 O Cly 5 Zw � c7 uW u° � H �" ° co N N N a0 O O O O at1 O O CO O v 00 M i;>i5{Li`y'? J•i M n Qs u1 n n o0 FD 01 N M <D M O m O O OM1 000 Opo FOD O N O N S '•- M M u7 00 IO O a1 FO a0 M d; VO N t0 N M N J d' N m o co d' co m oo co ID 01 6 o0 1fi .. .. C C Fn — ID iY U] O O O v N n v M O O O FO M M =v a C N FO M N n m d: N N c") 01 N LO N oM0 cn•1 O n P N co 000 m �• ";i ,�. s n 00 o0 O C�iN 1f1 Ld L N n Fq 00 00 to to C .k 00 m O i$P '10 C '01 r N N p n �.a•, p N. 00 co Fes'::;, �;,•;�:�'' o ?LI 0 v O 5— `^ r Ln N rKt _ s LO 1O o 0 o v O Lq N m v 00 co m LO C4 C4 Q 4 5:.�.1• t0 O Ln N O 00 u0 3e�,,��'•;,Fa°2F� M 01 00 N tO O CO Y.•tF?a� " 0 O v N M 00 -. M M O u: mv co co cq :�;<.Tsfr M M tOO tM0 O i ao a: o c o 1n O N O O 00 N N ,< .;�. n � ao cq Ir LO CD Cq eq ru d• ao 0 0 0 0 00 FO M N N A = ;a,. O O v v n v O N p O O ;: O N v v O C O cl co Cq Q7 co n O d' IO — to 00 n - 1l: N 00 0D pyyly r.� ..rp�x gray n:' p m Na,. N t0 n 00 CM00 to M t0 co CO 00 (D Q v 01 • �::•. �y M M tO O Om co M 00 O - v to N O tD n O N O N •�s..Peq r�i;w<'s»;• Opt N FOo M M v l0 t0 v mN N 00 O 00 O mtNO onopp LntO v O 00 00 -1�F�rh R`sa•. 00 cc to 00 1G+:fix=xu:P'•_�: ryas Vis, ',xt•5 r_9 t e•<r:''s . u i s"'ax: :'.. M oj lu s v a"t cCa E fC p m h 0 h�t c N Q; .0 w7 v C .. u I ��. a O C v u D aP m cz.S...".. ,e 4•, > k 2 s° e a a ° F i m s 0 e s O CJ z v D k` a Y m ? m M 9 In ,�s e � ro 0 0 0 o o o 0 o dN• dN o o 5 D A u a x E m 00 m ao ao cay m a G x '� 9 a v c a E E r m (O O FD (0 tD (D 'o d O D ttl D o u d 01 t0 O O O $. 0 u 00 xS m U O 0 U O 0. m O U F �; U a to. o "a?rIos:i- O O O is?O% O .....'':'O::' O '.:;�0 O .r 4:::� O `•''Nn. p[<'.�: M; — — — .:5:..•: .:.;, n'aN'`'N:i'^5!;I''s�;%:N�`qN:.�:N'y"N � .f.°3:x� O iH1. .r �4• 1w1� 4;21!!: ,;='r.. 3 •., ? C s t m i, o r 3�a $ y1 — �'��: W. 3 3L.a^��,�, .� x a..x x"z r:eFt ••V,� � t•"'F 2,;^ ;u6�t T 00 00 T to O M N O T to M N TT O O T T M < 0' O N O N tD M 00 to tD n O n to -� O M m d' e� O M < ; 0 T N CD O n N N O O lip IR . "R N n O N N n O T T M n N t\ N Cl) y m O n 00 O 1D N N to N N p•, < N n — .-� T T u) M M N T T M < tf, < O N 0M NLMV O T T N tD N M t~6., N N M N N tD T eM7 < < n of U1 O� tD N °o 00 In W r.a:ai}f 0 00 C O O O IPI I O 00 tD co ;,r��• O O O 00 LO L COMD n n n in 0 0 0 0o N in N m m o 5y '. 0 T T O 0 0 0LIM 0 0 in co CIM ' '?'.': oo 0 It It yo cq Uo In j ,fl � .. T O to N N O O f�D' ' r< un co 'tj1�v"3' O O O Q: co O M O 1ff � ;hek'� �ak ;;e" ry S:si"a: ry O as-�ra�k3: ..d.:r.. •+ N O M M O O N t3•a �i' * e W N O ^" N N 1 `m'4 !:• ...:.c, yO O IN M M n >O, n n O O 00 LO L: O t1] �'`.''�;•'fs=;h -• '•'� tV T d' O n O It, 1.0O cc O N N D n T T o T N0 tD It, N p M O co O n O CP N tD co < n N 11] n N co O m co 0 IS in 0 n T IS a o o m T o 0 < 00 M — < N o N T < N to < tD T In M co co d' co co n n u: to tD O CO M N < N t0 m 00 N n N N O O n O O N 0 N O n T M tb n N M n n O U7 n n•,.sSky .:E�. N n m 00 O T O O n T M In t0 M to O to t(1 00 CD co N N ' }r O T It 00 M T n T O T < < T n N to N tD '- T N d' N < T tD N N M .('� NN— M N M LL] N n M1f7 T N iy�'xx�9':�3x': M (D y�y, N N y xIi- r -�; ns � fsi ' sEt' C rp O c a > 0 0 _ f: m U W O o 0 „....s a ' a ';SLSCL � ;` � O 3 o to E Caj o n to t+f W u .+ r +' CO y ;;•` E df U m p `o to Rs s w N u It1: v T q O u y :,sr .. r e U .] U u ,� c m a. O F G m r� ;&�. U O `kS 'o o E U L m Z o _ T m A e o o o a o 5 _ < — z�+y;�a t/i c �Tt,i`. U �, 9 s� a u 5 0 � m m m 9 o o 0 o M m to m m U3 U H U F �a to E 4 �• :htit`. ru,:°vn': �p ::::rv. — ��n� — 'S4ix •S,.fid' a�a '�a�iF.i�t�4�&,;;isE'i:•f'.Qpa:,ix:•:s,.: O?'::;'::Oa::.",x: ba � !i•.k-p�.:O+.,..;4,i:y'"`•.'.O,'D3°«&5&?�%�:v,1_'p i •b�d•yo(.VD .y�& v>° ,D S^w yt. . 3 F` _ N M N_ d' 00 O n - O N T (D T £P 0) O T q• F fD O N O 11: a0 n F` T M F` a0 F\ n i_••Kx, M M M N FO N t0 Q N �:'' .N��,A ?• .M1. -• t` N n n M '+ FD M t\ T O O 00 O N N F` N T aq C (� N N to Q 01` T T M N a M M FD T FD n F, N00 O N [_ FA O N T co O N M o T -0 T T .0 t° fD M fD N O aT N N 6 T T < O r O M c M a c e ri iri o ai ci m r. ri Fri a N 00 n a S lrv `t C m_ Go n� Cq o O O c o 0 0 LO �• o Ln 0 o Di Di a to cc to 4 3" co 0 0 o co y ao 00 LO to mco D M T o o O u7 O ci T P. N O -00 00 00 a I4 N v T N N N U0 O N N FL FD Fa tV ': „i •x ci g: .,.. !:; No 0 o m °i c mFri ri ri F Su ,;. ��.�� N N Fn fn') v v tm .....a, F,h � '-' 4�'1 m r N aM0 co 0 N N W N FOD m 00 O N :D a . ap � M _ _ .. ,: €:Y m cq O co co p O r n T fD Qi FD to N co M M } FD N O a0 N T 4 isli:.�=:".1;'1!�!I�S N N LO t, ftiy•@, e?tef F` to d' N n N N V1 T n co <w•.'t,:::.: M r- r, FA to O — N IO CO O .e,��.�.,s.:.'ss....�n..,, ,r"N'a'; 00 .- O .M-� T 00 M a0 w V' M co N m N M :+i M N 0 d' [� N FD f` t- O I� O T co O FO M O T T O T V. F° O M FD M O to M T N O V N O O T T T N FD — N M M O ti.':•,'... fix- Y:3 O M LOO _ %: ;aa�se3>..•;�%�`3i1:,.. ,e.,. :C fix. 14 ;t i 04 ' o :;�2".: nG44 ai,a�*3xs�jw•• L wl- .H< y � C :�;�_��' o og,£:... � O a• c ° p E 'rx �0. a m x c o :;..: C m C a:, x.. \ LO u m s.z. � fi E m � e K m a c O :..... „ » 0 ' -gip maRt.: a 'sv R .., s, > `= _ e 00 Z a J 4 <F n o R in 0 09G o O A a Fn m 'o > Ai' « b °p o ? c �.'+•�?s C P \ �. (S O > p K ,des O 5..: d, C. t9 C N N ��`�rF°"•<�� -'..� ... � a z Fn � � x � aq a m =,:D a x v � ,� 'C cIt cz � °J co m F `. yr m U ran vi vi F a t a P�..,.at�`�^"�;.'.. „::rv.,s ��;.`•n' �'�; ,�.,,rr 3€ :�z ;o N s5:;�;: o �_ i:'f-0 m ri4rA E;:Cq ;?i o o;=�'. r..y. Vit., ���"<;fD::'2v3'',;e•. ..� sC7._ ., ,.,. � n `.r' n m :sj+�. N ;'Fn'.:. .R+.rt.«�: :iii�F �F:R: ';`t"..' :q,;"=• O :•:�..'.;,0:".C. .Fa. a�.i<; c c o c m c mmon °cvn � n .. ado Ci e - °s-i;-;^... m 0 m o to 00 ao o o� N r _ N n — n m cn o o m m m o m N o 0 p'"� 00 n v O? LQ c`'1 v' N 10 O O N Cl. N N M 11v 6 tS O k CD o ase 4 L F F xi`t a 'R AMON z. S& ' n�• O} O O O ;=gyp:. m Ilk. co O 7"yjjS N bSt'jr'tl-Mx '4e. d .. N s=tib; O O co (O �O' O a N N O L61f1 O O O „Cj N � 1vC4 cq IP IIR cl! IN fJ00 m C S.tsf`?4�.�..;r..n�.\ea F=• ,,FY O O n n 0 :":M. in G iii C4 CNI co IlkWMM ";r`:, „; n T o o n o n 3n N O m m O v v C (0 x0 N O !�D N cn Cl) rl 4�'';..,:^:(�S.^••: "VSs= i 00 00 cq .. Om ja. N cNo m N ita N 3t'::s:.s �;3•�P_s. :..,y O 00 30 M. N � [yIDz;,:... N Q rr►►�� ti b'„�c:: k 'arko �t O.,, �i, v , mo co c0 m 0'] c; c0 w>:m' m s CUD, co cc O N v ?: r ' N N �y n ;a yu N �,nA�.: : . `K N 'i•)k;'5;:';;s.<'?=+y7^'g c0 v a0 " to 07 O_ cc N d' — z co n Cn c0 n m 6411& m >"'.i=P:a:;•:�''a?%�m N c0 O N m 0) 0; M m v d' m a'] N v n m c'1 .-07 T < ;':.• c;; }y�,Vs; 00 m n O QI 01 O v n n v, O m m C ..-� Q) m v m N fA O a1 eq R uM0 O O n N c'7 m cN0 O cNA O C Cl) C O m m O O '�>E vs m N 01 0) m N N a7 N 0) ':::�` •.• 4 r� � 'y;L';•``.va,4'a� ??-'ice' ";';`yj1i M •.,.,`•;; W. IMA a h1®�Si: ,a,,E�''yyiy'�Y����.�`a�'°. •'sd'i.7 ,� �+' � `,"'$.4J b0 .w',6i a •� `+•.5*$y't.�,s'r�<< =".+:d •�6 :? NO O N N 'Vaw O $" kit o ° E B > l .'•nit.' ,���b., .: ., u � E a yC,, u� cd��e z«>;:y..�.. l��H � � 'C �G�pp O C �3. .�—oz L .>�."! ca fa O M x A \ Yr In L±O. r }6 c 0 O O =c;F W 'iA{' O G cam.•. a5 co U p. 1: ��'. � m a.;s:�;:U:;•�U �'.0;:U N ��„—a : f,� ..xx: "M:�sT. °;oc �': o ''_� 4 ;;;ss�,.'f-'f.,i,.•�..v��:,;,; •rs � c c . .:m: �;..fp;:.e�.:�:v�. o o ;a.?;�o ,a•:, o� _ rlA''`. •s�1;v f. N N N ';r.'.:V.'::��.Q:' N 3� a«`RVM yslMl.»�"`H1' FS': ^.Yf M t1 � vL.'i'Se:¢y?` ,sY'.::.e' N 'F. :.>,'cA E"'. =v:£A.;:=:'�;•`ys.�:ics<s pp'.+,,.>,..:;n.:. +4F F,a..:.. i>rC:." xyi<3:•,.s :.5t%..�= 4:..'^LS .jN t�•:.ks. :'.>t'. ..,Sas 7 .Lai '.:Mi•"a i.: i Ln Cl) to Cf) to LO CO. n 0) v N N4 m in Cl)00 0 !, y c0 l� v Lq [n N GG 00 Cq co LO LO N N c0 L co co M PJ ,�,e O P P . r ' in [n n rmi cmCl Cln co Ln Ln to r0 ch Fh T: .. - C0 co rax�rco [� AR UT c] e] n: [n P' Sa�a.x•� faa��++ Y�•a/`f/..�'j �;, 1f1 In ML in in W'" Ci cco v d M co •. me� 'i� :-e,��. Cq C7, Ci co In cc M co coco ci Lr F.<1::'€" c7 (D In n Ir O of '•:iro n'. m W p P D N ra.,yz£',ti..a. g 1114. P. a �`-,y�'.•!4' �. RMN ,�. i1'a 3..�^• 9..;S'i. � V O O h a N S-/3 .52�?+�ds':. ds�• 00 M n O O N W 00 n n t0 O lD O to N u7 CD 01 R O to N n O O C M cc n n d1 Ili O tD tD d' R O n LO tD O m C n R R 00 x O N N N O O tD a0 t0 00 a 0] n to tD M tD O '.t Q N — m n C a 0 tD m .^: v to DI N D7 to M In ,J0 Q N t7 to N M v n O t0 t0 N n M R R n N C1 t` N O M N o R N to to N 07 R tD N Of n O O LL] M CD N 01 O V' N N � O to �a' M R N N 'O n CD R CO F 0000 On 00 Go 00 W O r'bC� O N N O en to .. in - � 4ai '+JL4 D 0 • ' asy6a o y.:.: N to ,, y 8 33y:sfa".�.. O N G 5 :.r >. to Op p V) !'.5'Lts3.'yAq, C iy O O O Mae, ysrx; y, y. 00 ��:�:�'�,a• O O a0 to O 1,•':":'%•I :�,��=a' O O to O 1S' l:pYe R C N O tG '`.• yy, (109 on "PeQS,: tFsn,, a C4 to M LO O o iA 3;.ry; o m o y n to C4 R 0; to sri r, ri tri cj Cl) LO V� '£1:::x;4Q'•1� r O oLrl Lm n N M n n N of o 0) o N N to 1 F;,<,,�Yi�sF':a :sxa.a'... ! p flNyq •r 01 Gh ID >. Nin G o N co a 00co 00 a V` �w-j u.� �'r o... rr. — O O n n O N T yO, M M O LO N R LO M y` cD x. r C 00 M n O to N 00 tD N t3 F7 n p Ln a d' .'" O tD to M D) n n 00 O fD O 00 R R ,., in 'd�'S?: "( +� N T N N t'i 01 t0 M ^ JO o tD M n V' o xTp,Wx .`is "...':. N T tD n N m G n to n O CA n to O N M 00 t0 O tD O R coR t n ep O N 0 VO' N O O R O N N a0 N N M t[: N a. 07 O ON ',:L`�.J•a ����"5''"`' �fid;: ::! RSC 'k ccyygg'' yy ^ �: a saw§ ae>1 E i.~ m v _ § CL > tr.•�.'.t.°c'r:c..?y ': �M'. :;i. y m O C stQ c� 06. E 0 c Tisk�e°i•r; G E 4 .a s;V'. t r� ° y E c °' G a° u N x. k �•-; O y a c o c �.:.. D ` r to c th ,�4(, Sa?.,3y�• aU+ U U U y 4 L. 4•ia"6^<Fip?.G..a i.E:„: O tE C i > > U U N f C t0 fU'. U GO y ..b Me vsry w Oa a, O c ' ., �. c to U] c � v 9 € �:.. � z m a — nimm . ,ra- u > c > Q m h ti o d N c c > H 3 }.i+sa� U L to o a' - t•J Cd 0 AM, u a c a C ° rA ,m• a _ �a 'O d' X: C O x U 2 N to F 'o rn U a XU y '. yO r o o �to O CL to 00 00 c CD tO Sx O a2 a a m O UE F �o �� � � e� h•.' r x:;ni.:.°%.cl!s: t1 �w a O N ,:j:=f!!::.`;tT'::"t/t:S�".CD 'h'i:';:00 zY%'OtN O O S O sou O°e'�•S N <"N' N N N.st^N' i:.N :`:N>%N.?.<4V;:• [`I.'<`:�'N, i.�= — — — — — <s;;•:-:; - — a H Gir. sb¢ rys1T'` 4 •�:>; ,��., .-.r. r:s:°j" Baa; y,r �:9 f S .'y: P'f. 07 N n ID t° c 07 n co Cl) N c0 M O O 07 N N O N (0 c O N �y tD 0 d' Q7 — (b 'r O O 07 01 tD — N ^ rl •xz�,, a•Y.'C ..a an0 O 007 O a°IO dN' n p tD N n 0 M t0 n 0 O n n O M M — t0 O N n n 0 (cn M 0 N n M O N n d' M Q1 O M to O N A.e+ u ���:• � � T N � t0 N � 00 � .—. � N n � M M N N N a' Ov N N M N m s`W�S ci 71 rl Gw•�Tti- . m a o 0 000 u :. Mcq M N to to in ui t=Sktivy , 00 : � {S 00ao Oq sm-C. > .F:Y. N N in m tit t0 .. N cq 00 00 C O coto c0 R. " .. O O Mco cot C) ;`.. LO in co a A..F'ru�,fc.NV rcoN uj t6 01 — .3 N 10 00 Ag x: cli CC. LO cl cm N n m (D 00 w cc 4 mt0 IN N N N n NT N N co 0. t, 0 O N MtC C c7 N n n IO O7 O C7O c n O n 01 (p M Y;.�:34A':yc n' .:r.'• >. Ncl N N y, N Q n N ke. F%.agss'd;a^i's•kF`.}�.. co cc n (M N a — ;.z.,,.w. ',a., sA• v a — 0 0 0 o tnc o a 0 c7 o n M M �' C7 o N n c n N n o M o n N o n r) N c0 — m n l� cj — O 07 N Cl) c (O N n N a0 0 t0 O N M M M N p O N •- N cy O tD Uo O t0 0 N v a0 N co co Lam. c n d, Q1 O N N N 07 M N N O e0 N co 00 M v i$' :'tea..... F: ''? � ' NO s'iy,�'(q.sa:aS3g:. '2�•x,`.,Y',., %fir... �;�r:..�."-rl si�:�='�:, -?:Rye ;S�e�' ��[7: `' ❑ O -? �i :Wt;M o µ nccW g E E v v it xrx' cz U W J W O O O O a::.. " . a E E .� O SY' �•"�°>:f�c"",e?';:-:d �,3.!�. to N � t0 ���: _1C to 00 wE M M u Y N ?". ° •t$. ty Q N V O 4. :P, 3 C i E r N :::F:FA W 'S. bU E 4� O O �7 lAdo p Vis' ,o m c� o '� O `yO; ° ,° .y u ° �. ° J U Y: ��;..aa�k'-.x.,.•.�, '::(' .0 v N cs= to 3 }}. -0 .',�.��'�'°,� ??�..'� `oaf; � c > � « N �'ti "> a ;'i.;�' •Oq E o u ,.< m L° o V m` xers fY u ai ° 7 a S o V tom. ; .'i` 'c _ o V 3 3 cc cu a S b �C 7 4? 3 Nc ,°C u�i ro (a E 'r "`3.�yi`;t •Sz:%`` a d, d' d' y, .� G .7 ?f=' y o ❑ ti L° u `'7 Q m —u7 N Okr`<l.. iDj�` et3.'q: p p <T,� .}:V1. r^1v7.. S ".s'.Ot `D��:,p. b ,:':`O r..:<.'.W.�,:�'.D.'°�.O:Y:'•YJ b NY ,O V ..W v ?ar. t �A 4a G 4 M� [LASH•` ..wx-�-+- ..... ...... �...:•. :. :y,,;;:z:�:":..,.... _.✓sA:. s Vis:„ ► wb ra a C° o m o — .� , u�i v n o vni M o N = cNv o o O `!' voi [N`] m n o o OND dN' rn N ...- .. &�£.' n ao N ao eq a to °� a) a °� o o ao n a m . s o to (D a N aD O a Ont QM1 '" n0 O � � _C.: d' � N C4 O O O -n-' to N M .�,.. T N N 00 M n oD N N O Cn O N N !° O CO e' .. O? M n In Cn F COV O J O N COV n M A^ ` cli La .. ,. 'x.... r to 4 00 00 00 00 co �•�..%.�,. O O O O yS � N ai ..o ° o 0 •''.4'»"r'iltf'- 00 o Np N O O p i o 00 0 C"'.< a o 0 0 o c O } N O n co co v y; °o 00 co 0 0 F� La O`f N N N N p p 0 O O n O n N N r Cq p Ji O d,i r C x O O N O O 'yL F N N N v :V O O N !O M m N "V•.,[.Vi:�. M N M m N N A '7 Eta i?ir.J Gk M N O O _ _ M CD C in 00 O O Q 6 O O O C COO v co n O N M M 0+ N Cy ?., ?.. CO 00 N T O O 0) O N CO O O O O n N O C70 N O C0 3«:'H•'�:;#u;;<:)),•�x.'zir?€Sh d' C O M — CO kf? O LO N N O CO co V' O O '';M•.^s's,KF^'.€�:hl,'��7 O O aD N N O O N O N O Q� N O O N M CD a0 n O �, O p v p 01 p O CO O n M 01 O 'I a, n MO n v n CO O �i o: N•::xrLV' 01 N M O 0: 0) --� O O O — O C — to -• CC 0) M n aD O O O s d' .- O M CO v O > co n M > to ,pr, > o N to In o ikyFe�'u33i"a:�`� ViN as �fS�G sc r.;•s g"��`'`,x.'� U u c O ';''{ O r fZ :?z:�` 9 �i?.U' u e: O _ NCL m m u d m m C a CL In cd r 10 :<3Y�•PCA, .k.'yga. N co 1 St m .;�. Se c d en , `sok. o m $ o a v u 4ztGi t m u t4 p a� Ei 3 a "ca 0 a CL ` rr< a 3 g v o o J m (x q m V c t Ar' o a 0 oC? rya o > > c > m x>•..7;.r;S' .:;s',n m Z' �1W 7i -ca cef 5 W �m v v7 o m F y ! 3 w N m v N F "; F x. o"o f:¢.X.., sk.'8:'..FyppS•i ax {� ..:Rl.�, �'•"' <r,M1' y;,iM1 s".Y f< C� i�7s�"' m ,.pp O p t,O-'Q. — — q� v^ i ti 3 yin; ?Sr. — "�r m•4 4.. x� j� ss sr^m� �ei'a1.N A^9cIl,'� .:,..... .........:s,:" .:.....1::.::':s'. :{;::�;:< ::?'s:. (3�.. �y.`R°€&.•',' = t'"=�3�`ita n`c`..1' V" i ••3� :1 O N tD n •• O o Of a0 m0 w,;y. t, 00 00 LL] .�. •., O a O to O 2 Opo O _ p mo wrN; p r� in 00 O a 0 01 O O O 0 111 O Q) ... N 00 n 01 O n N m 00 01 tDto 01 f0 O f� In _ O city to O O N cf100 C1 cD a .. O fD a N CD a to VO' Ln F,�e`�: N N N O F O O F 10to cn �sTN. k ;. O ;;%c0. > n � 3 _ 00 00 00 , s o `0400co 00 _ .. LN 10 co Ln Ln Ln LO 00 cq 00 co Cli i O O s _ ' T . s�y .`•.;..0?'i':C ;Mr''s; O N O O O n n p j i lA 06 CC �'•;>ti. ,'x.^31:((:�;� R N t0 to .07 :,':*\1►w'bS } a a :111 opo N r; "''' O A OWN O G co O O cq t`7 tD a' c; O IIj C1 1"1 �� c`0 O 07 +07 O .. 06 FiE'r<:4 ;rj: l0 1 Cq Lnco to ID ro Cq co o o ;p N �,... •,ate W N o ^ p o sem... '�L• O to L^ nAr".•` ':4ir':,;tYi=�.,,. apo N co s -5:•::i.. Yfos m c m a 'IN n —o LO O'rW }O O N O ;r:.N cOo to N 07 .0 O N a O O 01 p �y V7 O :arty n COa n° AN-MM-M, p a o a x n o 0 o N o 0 `4^- •�'.. O 00 coC d: O p Lh O O O M O fD O O xs;i .S,?:�: ',:;v.�'^: p v p tD O 0) O N O t0 O r O «jN 00 .>;3$,'w+'3e a'i?,r�� ::1 14 r N O 00 ?1 07 p 0j 01 C — O a O C 3:k s.° .i..P�'ai.. O a, r — N LO _ 0'1 .. O n O 00 01 C O v' O vr� p TIP. 01 N mn ID N O a '� Q7 n Q1 O tD — a p p m co ial*fjs: ter' ' 'ri7,tss�!l; 11f`t ;ir x%F•?. t, i.`t :.j3 ,. 5,.. x�•a: :F.,3�3C hv:`.[�!!' O U 1my� ii:N3 y�ySrP�;i N •p a,;.:=;. i33 O .3"€`..:p: •.. 4U i�:iASi L z`�a8 nnAl j C 'a 1.8 lu lE u to � FIN ,o p u Ut,-.'R3 U °'R1' vi 0 Niz rax •• . . a zt O � ,p ...„?;« mN q�. Y OS m N Y i'•£R' k '.• : E e C o D O F u a u m •.6'`.•'.:..,, ::�0. >, 'c� Q � h to ;�tsf.:� � a' wLLj E�eh:�t,:;;',,:�-.' ,••���y��g�,� p 5 a � p m � •ee � w � z a yCL m � eAr6st 00 C� 00 al`'r. '. G _ 9 to N C O Qr G: o GO O ,y O O o (n y t0 O ..iC i u 3 G s c: ? n o — to (n U U I.tN, '. a�3F` LIN ' N N N . '•;:' 'i• !=F` �T'w cq 1• 00 In vi CO N ID 0. Sk r• xTi�,��° � ^r 00 ODin tr • N MT PIR coO i SY:;b;'...tip .•.?:x L 07, to � N LO N 00 in .V. C3• "m:t.t C cq cq LO I LO in CCii� N 'A. n O N ;,;< LO to c�7 In ea N to O T, Ir00o o x Ln LO Lo NMI co pN om. Cl) N p AS'd.'. ice:�y 01 N C7 tC. V. cq TO ;x: g:sssi dC >, C to lcxl { s > c 0 c y•mF,:e.: UI u C F C r:.. �:. v M m n Y � W o0 4 A k a a �a1 a,, �r00i 2001 DRAFT S�RATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY 1-680/BURNETT i'r �' Left turn movement AVENUEI removed NORTHBOUND �o` 1 remnal oved ON/OFF-RAMPS 7\ ' PROPONENT: CONCORD PROJECT 1101 �.• I I inl �71t removed DESCRIPTION: \ �� This project provides new o tim \ �` Auxlliar lane from northbound on/off-ramps from I- //j lad Q,� willow Baas Road. 680 to Burnett Avenue, a L 1l northbound auxiliary lane from ==aoTF cine RD Willow Pass Road, and removes 1 1` the existing northbound off-ramp `I at Concord Avenue. It required the widening of the existing I-680 LEGEND structure over Concord Avenue — —= and the modification of existing EXISTING ® PROPOSED signals on Concord Avenue east ® SIGNAL of I-680. STATUS: Construction completed in 1995. FUNDING SOURCES ($ X 1000): Federal 230.0 State 2,770.0 Measure C $ 1,525.2 TOTAL $ 4,484.9 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/01 Draft Appendix D D 1 �_�9 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY NORTH MAIN STREET BYPASS (LAWRENCE WAY) PROPONENT: ,_� �* � • WALNUT CREE PRO45 gym\ I. .•: DES 1PT y'' New Median ` 11 i ; \\ `1 I N ��\\ Retaining Wall The No` amain Street Bypass `y�\� Closed to Pu611e (Lawrence Way)provides a new 1 New Median one-way roadway from Pine LEGENDVd Widenings,16 1 Street to the northbound I-680 on- a 5 N. Side ramp. The roadway consists of ---- EX S 1 � Retaining Wall two lanes from Pine Street to just R ED it c �� i \ north of Parkside Drive where an ..-•.-_ NEW CONNECTOR ROAD ' ..... ,' `� \ b New Street on-ramp from Parkside Drive (BY CALTRANS) Modify Signal �� to enters,creating a three lane road ® NEW SIGNAL \\X QX to the end of the project. The New Median \ roadway includes a 180-foot-long Retaining Wall \\\ { �\l-Siogna structure over Parkside Drive 1 { with retaining walls on both sides. I Parkside Drive has been widened between North Main Street and the Bypass and a new signal has been constructed at the entrance to the Bypass on-ramp. Two existing signals have been modified on North Main Street and North Main Street has been reconfigured between California Boulevard and I- 680 from its original three lanes in each direction to FUNDING SOURCES ($X 1000): four southbound and two northbound lanes by shifting the median and restriping. Local 2,768.4 Measure C ' 8,520.0 STATUS: TOTAL $ 11,288.4 Construction completed in 1996. Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 2 Appendix D 7/19/01 Draft / 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY STONE VALLEY r ROAD INTERCHANGE MODIFICATIONSL j4 PROPONENT: I �o \ u CONTRA COSTA TRANSPORTATION AUTHORITY ly �►� v� , PR`OJE, 1104 DESCRIPTION; This safety improvement project realigned the existing off-ramps to eliminate a free merge zone at I g Stone Valley Road that presented a hazard for pedestrians,bicycles, and vehicles. The realignment LEGEND �� \ changed the four off-ramps`to "tee" intersections on both sides =___= EXISTING \ of I-680, providing pedestrians PROPOSED and bicycles a safer crossing at each off-ramp and improving vehicular sight distance. STATUS: Construction completed in 1998. FUNDING SOURCES ($ X 1000): Measure CLE ,$)I 964.6 TOTAL $ 964.6 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19101 Draft Appendix D D3 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY 1-680/EL CERRO I BOULEVARD + INTERCHANGE RAMP SIGNALIZATION kv J PROPONENT: ` New DANVILLE s�9�a1 i EL COM M PROJECT 110:5 lzl \" 4o DESCRIPTION: In order to move traffic more efficiently between El Cerro Blvd. lji wal and the 1-680 on/off-ramps,two p � � \ existing stop sign intersections have been signalized. Overall,the project included the design and LEGEND installation of two coordinated — — — EXISTING traffic signals,restriping,new PROPOSED pedestrian ramps to meet ADA requirements,reconstruction of failed pavement sections, pavement overlay and median improvements. STATUS: Construction completed in 1994. FUNDING SOURCES ($ X 1000): Measure C (Esc.$) , 487.2 a TOTAL $ 487.2 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D4 Append&D 7/19/01 Draft p�p� 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPOR TA TION A UTHORITY 1-680 AUXILIARY / MAP ac�kn LANE DIABLO ROAD TO da pD U A D1A8L0 N yQRT S7J BOLLINGER CANYON ROAD m ♦/ gYOAMORE VALLEY PROPONENT: 1 CONTRA COSTA TRANSPORTATI 'y AUTHORITY., 9 9 PRO T p► 110 DESCR 'tibN: This project proposes to construct auxiliary lanes in the I-680 corridor from Bollinger Canyon Road in San Ramon to Diablo P° Road in Danville. These P° sus improvements include an additional 12-foot lane between OPO sq Fa LP interchanges in the northbound r , and southbound directions, �e 9y°ti retaining walls, and new soundwalls in the corridor. Also included is the structure widening over Laurel Drive between cFq CANYON.: Sycamore Valley Road and e�`O Diablo Road. STATUS: FUNDING SOURCES ($ X 1000): A corridor planning level study was completed in September 1992. A Project Study Report Measure C (Esc. $)' 14,670.0 (PSR) was prepared and approved by Caltrans STIP 9,000.0 in February 2000. Preparation of the environ- STIP (2002 Prop dLocal N, 21,060.0 3,600.0 mental document started in June of 2000. �^ Three construction segments have been identi- Other (TBD) 6,700.0 fied. All segments will be covered in the TOTAL $ 55,030.0 environmental document however, only Seg- ment 1, is fully programmed for construction with combination of Measure C and State ' Measure C funds shown in escalated dollars. funds. Design and construction of Segments 2 Actual commitment is in 1988 dollars as shown in and 3 is proposed to be funded with a combina- Appendix A. tion of Measure C, Local and to be pro- rammed State funds. 7/19101 Draft Appendix D D 5 5 �� 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY FOSTORIA PARKWAY OVERCROSSING \y\ \ \ New signal K PROPONENT: SAN RAMON J,;~^\jh\ \1 \\ 315' TWO SPAN lryo{DD...a00 OVERCROSSING C Of PROJECT NO ;�1 osj0ON 110 L \ Modify existln dI n I II\ o ~\\ DESCkIPTIO,N:''� Gee 11 II \®\, \ \ CL G D The six-lane overpass extends g ,� �I 111 \ Fostoria Way over I-680 \ EXISTING approximately 1,100 feet north of PROPOSED the I-680/Crow Canyon Road ?� �,��I CITY BOUNDARY interchange and has provided new \ \ _� � ® NEW SIGNAL signals at San Ramon Valley Boulevard and Crow Canyon Place ` ��` ��� J00 No new ramps were provided for I- o{��y 680 in any direction. \ \ \ a STATUS: \ \\ Construction completed in 1994. \\\.\ \� \\x`'91 � \ FUNDING SOURCES ($ X 1000): Measure C (Esc.$)' 13,212.4 TOTAL $ 13,212.4 ' Mcasure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 6 Appendix D 7119101 Draft (/ 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY ROUTE 242/ Existing structure CONCORD to e widened. � I AVENUE INTERCHANGE ` O PROPONENT: CONTRA COSTA TRANSPORTATION AUTHORITY /CONCORD PROJE'6iN �4'\ Off-ramp to \/ 1 O; be removed—� LEGEND DESCN: o > 1 Improvements at the State Route � � EXISTM 242/Concord Avenue interchange ® PROPOSED include a new northbound loop �\ ��' SOUNDWALL on-ramp, a new southbound loop \\ ® NEW SIGNAL on-ramp, realignment of the \� existing southbound off-ramp,and construction of northbound and -- \ CDMCORD southbound auxiliary lanes ® AVE between the Concord Avenue and + To bei removed. Grant Street/Solano Way < < Modify signal. interchanges. These q improvements include three new structures and the widening of two others, the widening of Concord Avenue and State Route 242, paving,restriping and new signals at the four off-ramp intersections. FUNDING SOURCES Approximately 8,600 feet of ($ X 1000): soundwall were constructed along ' 6,000.0 Federal both sides of State Route 242 to y State 1,608.0 mitigate existing noise impacts. L __1i ocal 1 9,800.0 Measure GGE sc.$)' 14.961.7 STATUS: TOTAL $32,369.7 Construction completed in 1997. ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/0I Draft Append&D D7 _�C 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY ROUTE 242 1 WIDENING I PROPONENT: 4 �3 CONTRA COSTA I a� TRANSPORTATION AUTHORITY � .` HOZ F 9 r� SO4 4 9p PROJEC 11 ' wqY DES IPTI i This projevidened 3.4 miles of existing State Route 242 from C0Ne0 four to six lanes from I-680 to 0� State Route 4. The improvements 0 included widening the roadway by Z decreasing the median width to eP55 �o allow for one additional lane in each direction, constructing drainage improvements,building soundwalls and restriping. Right-of-way acquisition is not anticipated, since all widening occured within existing State right-of-way. STATUS: FUNDING SOURCES ($ X 1000): The project was advertised by Caltrans in late ' March with construction starting in July 1998. HB 311 500.0 Constriction was completed in early 2001. Measure C 35,567.3 V`K TOTAL $ 36,067.3 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 2 Funding from both the I-680 and commuterway project categories. D 8 Appendix D 7/19101 Draft -� 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY W r I e o t C r e e k _ NO 8 NOV LANE P I r r r n t H i I I r co A � N�r 27 b b < 9 W l o o t C r e e k C o o e o r d 1�1apS &ein9 Upc C)- P l a e a l l BEGIN SB HOV LANE34 \` \ a wxco W C o a e o r a � � BEGIN NB NOV LANE YJ J IN NB HOV TOL ` PLAZA BYPASS LANE 1-680 HOV LANES Structures that require widening include the Grayson (NORTH MAIN STREET TO Creek Bridge, Blum Road and Center Avenue MARINA VISTA undercrossing structures, and the East Martinez Railroad un' erpassing structure. PROPONENT: STATUS: CONTRA COSTA The CEQA/NEPA environmental clearance was T RA N S P O RTAT I O K-\ obtained in December 1999. AUTHORITY . Final design is in progress, by Caltrans, and should be complete by early 2002 PROJECT NO. 1116C Construction is expected to be completed by 2005. DESCRIPTION: This project will provide a new HOV lane on I- FUNDING SOURCES ($ X 1000): 680 in the northbound direction from SR 242 in Concord to the Marina Vista Interchange in Federal /�''� 5,250.0 Martinez. This project also provides an HOV lane STIP _ 31,654.0 on I-680 in the southbound direction from the STIP (2002 - 8,000.0 Marina Vista Interchange in Martinez to North Measure C /'`J 2,202.0 Main Street in Walnut Creek. TOTAL $ 47,106.0 This project is accomplished by minor widening of the right shoulders and restriping I-680 lanes to ' Measure C funds shown in escalated dollars. a combination of 11-foot and 12-foot wide lanes. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/01 Draft Appendix D D 9 sal 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY Y M(3 ps Been U �4c _ =_ - _ TELvt.E - 1-680/SR 4 INTERCHANGE: IMPROVEMENTS FUNDING SOURCES ( x 1000): Measure C (Esc. PROPONENT: STIP (2002 Proposed '5,500.0 CONTRA COSTA TRANSPORTATION TOTAL $ 2,022.0 TRAN �. - AUTHORITY Measure C funds shown in escalated dollars. PROJECT NO: Actual commitment is in 1988 dollars as shown in 1117 Appendix A. DESCRIPTION: Conceptual engineering studies were performed which recommend an ultimate interchange reconfiguration, which can be constructed in fundable stages. The suggested improvement strategy includes a two-loop and two-direct connection freeway to freeway interchange as well as a reconstruction of the interchange at Pacheco Boulevard. STATUS: Conceptual engineering studies were completed:in fall 2000. A Project Study Report(PSR) for the interchange project is expected to be completed by Fall 2001. D IO Appendix D 07/19101 Draft 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY ALHAMBRA AVENUE -' WIDENING a r PROPONENT: f MARTINEZ �� 3 1 i \ �\\sem �• 8 PROJECT-NO: a � rv`gi � war 1203 0 IF DESCRIPTION: AW11 ' Thisro ect widened and p / LYEY DR Cit °/ Cit upgraded an existing two lane arterial to accomodate four lanes from Alhambra Hills Drive to Shetland %P Drive transitioning north of o MacAlvey and conforming to the gE71NAY � existing four lane facility south of EGEND ��� Benham Drive. This project '""`AW r modified five intersections, __= EXISTING ,���%�\�M011r Q including signalization at PROPOSED MacAlvey Drive and the ® NEW SIGNAL installation of new left turn lanes 9 EXISTING SIGNAL Cit °fAfw�tinai sidewalks, bike lanes,retaining city°7—aE:wlf ,o walls, soundwalls, and °tI''i° �.r landscaping. STATUS: Construction completed in 1996. FUNDING SOURCES ($ X 1000): Measure C (Esc.$)' 100-tt 2,117.9 o TOTAL `` ' $ 2,117.9 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19101 Draft App endlr D D I I 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY TAYLOR BOULEVARD/ PLEASANT HILL/ ALHAMBRA ROAD INTERSECTION I �P IMPROVEMENT �P PROPONENT: PLEASANT H 9` PRO NO: 12 .5 DES I.PT,l01�1:� This project widened the intersection of Taylor Boulevard qs . and Pleasant Hill Road to provide SLATER AVE additional capacity for the inter- section. The project includes �a additional left turn lanes, relocation of storm drain inlets, modification of the traffic signal, installation of signal interconnect LEGEND to the adjacent signals,restiiping ids PROJECT LIMITS and other associated work. STATUS: Construction is complete. FUNDING SOURCES ($ X 1000): Measure C (Esc.$)' rFr�: 536.9 C f N •vi., TOTAL KII< $ 536.9 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 12 Appendix D 7/19/01 Draft _30 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY SOUTHIN ROADWAY EXTENSION --_J '-= I � V1 PROPONENT: ��•�,�, 111�� \,�r%a� I WALNUT CREEK \ �Ic LASLOMA9 �o 1= \ Is HIGH SCHOOL PROJECT IyA: DESCRIPTION.: The project-provided a secondary southern access to the core `�� downtown area, a parallel route in the I-680 corridor, and improved '\��ti NIVN01 IS access to 1-680 at Rudgear Road. E Wu O �`�\\�\� \` The City of Walnut Creek split L—— EMTM C�� the project into the following five PROPOSED phases: 1) the channelization of — POESrRIAN OVER CROSSNO San Ramon Creek and theSOLNDWAU construction of a concrete top for use as a roadway surface; 2)the .� construction of a two lane street from Newell Avenue to.Rudgear Road with accommodations for pedestrians; 3) the construction ' ;� \�'� t of a soundwall along the east boundary of the travel corridor; 4) the modification of the existing 1-680/Rudgear Avenue interchange to more efficiently FUNDING SOURCES handle the traffic as a result of the ($ X 1000): extension of South Broadway; Local "'� & 10,013.0 and 5) landscaping between Newell Avenue and Rudgear Measure C (Esc_ t „�� 7,343.7 Road. y TOTAL $ 17,356.7 STATUS: Construction completed in 1996. ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19101 Draft Appendix-D D 13 _�/ '2 001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MONUMENT Add two turn lanes. BOULEVARD/ Add two lanes and I move retaining wall. CONTRACOSTA Add one right turn Ions hk tand one westbound lane. BOULEVARD/ ► % ' � / Rastrip• and B US KI RK AVENUE i realign intersection. PROPONENT: PLEASANT HILL- �� ��� II PROJECT NO: 1210 J® MONUMENT J DESCRIPTION: This project realigned and I j widened Monument Boulevard to accommodate the additional / / traffic from Caltrans'I-680/ — R Monument Boulevard urban W) I / / ti/ � interchange project. This project conform to new interchange. also widened Contra Costa Urban Interchange (by Caltrans). Boulevard between Gregory Lane and Boyd Road, improved Add right turn lane. Gregory Lane,and the Add one lane eastbound. intersection of Buskirk Avenue LEGEND and Monument Boulevard. -___= EXISTING PROPOSED STATUS: I£ NEW SIGNAL Construction completed in 1996. FUNDING SOURCES ($ X 1000): Local 258.0 ;.. °° Measure C (Esc. ., ' +. J'•..t 7,015.4 `,:. y! TOTAL '' $ 7,273.4 i Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 14 Appendix D 7/19/01 Di-aft 7 �� 2001 DRAFT STRATEGIC PLAN-Fact Sleet CONTRA COSTA TRANSPORTATIONAUTHORITY PLEASANT HILL ROAD/ TAYLOR BOULEVARD REALIGNMENT I PROPONENT: I CONTRA COSTA COUNTY == P 15 C T a �o 1 3 KERKoSVN.lN i DES ION: /�'��6' This project consist of realigning o��y the Pleasant Hill Road and Taylor Boulevard intersection. The aSaNt A o,, realignment is a safety measure to G�so reduce the number of accidents /.' SyGio�ti 2 and improve driver comfort. LEGEND STATUS: ®' .PROJECT LIMITS The project involves the County, Lafayette, Walnut Creek and possibly Pleasant Hill. The County has had the project limits surveyed and ready to start preliminary alignment studies. FUNDING SOURCES ($ X 1000): Measure C (Esc.$), SQA' 121.5 Developer Fees oc211F'edetal 3,400.0 TOTAL '-' $3,521.5 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19101 Draft Appendix D D 15 •2001 DRAFT STRATEGIC PLAN-Fact Sleet CONTRA COSTA TRANSPORTATIONAUTHORITY COMMERCE AVENUE EXTENSIONCJ J PROPONENT: I �4e4,r.i, Q CONCORD Q '90"44 Ay !u PROJECT NO: l \ wq°°SrRl4� rum 1014, •�.. 'Y C'1 U DESCRIPTIQ.N:' This proyect.will extend Commerce Avenue between Pine °� Commerce., venae. Creek and Waterworld Parkway. 930 s1 den p° The extension parallels SR242 and connects Willow Pass Road with new freeway ramps at Concord Avenue. The project ° improves downtown traffic zaz circulation and enhances access to the I-680/SR242 corridor by ePyy redistributing the traffic currently using the ramps on I-680 at Willow Pass Road and SR242 at Clayton Road. Measure C funds will be used for Construction. STATUS: Project design and environmental work will begin in 2001 and construction is scheduled for 2002-03 . FUNDING SOURCES ($ X 1000): Local 1,700.0 �tri `t� `.: Measure Cis s%.1 4,291_7 TOTAL $ 5,991.7 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 16 Appendix D 7/19/01 D►•aft _ 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY w'• I Phase. 3 Phas.e 2 o � G x L__ co o uU GE-ARY 0 RD)FVT1 Fff a Nt —i^^ w 1 � a h s G EARY ROAD STATUS: IMPROVEMENTS Design for project is complete. Project construction is scheduled for August 2001 with a target date for completion in October 2002. PROPONENT: WALNUT CREEK FUNDING SOURCES ($ X 1000): PROJECT NO: ' 1215 (Phase 2 only) Local s.. ' 2,326.0 Measure C u., ' 1,979.5 DESCRIPTION: This project widens and reconstructs Geary Road TOTAL $ 4,305.5 to provide one through lane in each direction, a two way left turn lane,bike lanes,parking and sidewalks along Geary Road from North Main Street to Pleasant Hill Road. The project has ' Measure C funds shown in escalated dollars. three phases. The first phase is locally funded.. Actual commitment is in 1988 dollars as shown in The second phase is funded by local funds and Appendix A. Measure C funds. The third phase is partially funded with local funds. The City will be pursuing other funding sources for the third phase. The first phase includes the improvements between North Main Street and Pioneer Avenue. In this section there will be two through lanes in each direction. Measure C funds will be used for construction. 7/I9/0I Draft Appendix D D 17 j �;S .2001 DRAFT STRATEGIC PLAN-Fact Sleet CONTRA COSTA TRANSPORTATION AUTHORITY PACHECO BOULEVARD ARTHUR RD WIDENING PROPONENT: CONTRA COSTA COUNTY PROJEC` DE ` RIPTI ONJ This p3ojeet consists of widening Pacheco Boulevard from Blum Road to Arthur Road in the Martinez area. The road serves as - % a local road and a parallel route to Interstate 680. The closure of 680 Solano Way has left Pacheco`` .'J/,' Boulevard as the main north/south connector in the area other than Interstate 680. LEGEND. Y� ® PROJECT LIMITS STATUS: The project is in the design stage. ' Design is 30% complete and 's"t o Environmental work is 65% complete. The County has initiated discussions with the railroad to coordinate the relocation of the railroad overcrossing and is looking at accelerating the project development and environmental process to coordinate this FUNDING SOURCES ($ X 1000): relocation with the I-680 HOV project. Project �' construction may be phased with the initial phase Measure C (Esc.S)' 3025.7 A .'` being the railroad relocation. Project completion Tosco Transportation : '`fig IJIFund 4,000.0 Developer Fees/Loca� ` `� 1,500.0 is anticipated to be Fiscal Year 2003/04. ' 10 TOTAL $ 8,525.7 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 18 Appendix D 7/19/01 Draft 5�3� 12001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY LwM 1••C,15t IP.R 1 �• I WinPOSC�NOM I 1 Z LEN HESTER ORSf I AR 1 CO— ITY PARR I N •• ' LEN NESTER I I Lt,m,c•r.[LI ! COWALI YPAW COOSS"ALP MINA'(SPREE,rOR HOOKSTONRD ._ ��_ — — tosra,c sractl- I I HOOKSTON ROAD T f J ` I 'f •.^P.CJIb. . �� PCV4B—._— :•. . .1 1V lgq.9 OP[Ilu!!1 MAYHEW WAY ' a 1 1 I O III I{ I � UP11W Ill lti� I m IPRp?p5f0 IROa IIaPSr IR�L ALIUn,[NI ` L• 4 � I "oast rn,. E .__..._ PPOPouo 4a•, `I ' lam rwu[HL ' 1 Y BANCROFT ROAD/ STATUS: HOOKSTON ROAD Projects design is 65% complete and construction is INTERSECTION scheduled for Fall 2001. IMPROVEMENTS PROPONENT: CONCORD. PROJECT N 1217 DESCRIPTION: FUNDING SOURCES ($ X 1000): The intersection improvements will consist of installing a traffic signal, constructing curb, gutter, TFCA 150.0 sidewalk, and drainage improvements, and STP/CMAQ �V,, 307.0 reconstructing a portion of the pavement. In State (CMAQ Match) `{. 40.0 addition, Iron Horse Trail (class I trail) will be EBRPD '= `' � 60.0 extended between Mayhew Way and Hookston Measure C (Es9 lk 419.3 Road. This is a joint project between the Cities of Concord and Pleasant Hill,with Concord being the TOTAL $ 976.3 lead agency. Measure C dollars will be used to fund design and a portion of construction. ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/01 Draft Appendix D D 19 5-37 -2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY f F _ W Q . y z. Y a: o OAK BL PARK �. , , � �" \, . INS DR ;VALLEY O LEGEND QQ , .S.I,N`AL . . . _ SUN VALLEY. 13 680 O ; INTER'C.O.NNEG MNS OAK PARK BOULEVARD FUNDING SOURCES ($ X 1000): SIGNAL INTERCONNECT Measure C (Esc.$) ,-�^`� 106.1 PROPONENT: TOTAL 'tK�;�t,��� # $106.1 PLEASANT HILL `ter PROJECT NO.:.... a '`: �� Measure C funds shown in escalated dollars. 1218 Actual commitment is in 1988 dollars as shown in Appendix A. DESCRIPTION: This project interconnects signals for Oak Park Boulevard between Pleasant Valley Drive,North Main and Coggins Drive. A signal interconnect is being installed for North Main with the Caltrans Phase 5 work. This project would tie the signals along Oak Park Boulevard into the network. Signals along Oak Park Boulevard will be coordinated and better managed. STATUS: Preliminary engineering will be initiated in 2001. Construction not likely to start prior to FY 2004. D 20 Append&D 07/19/01 Draft S��8 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY IRON HORSE TRAIL CROSSING AT TREAT BOULEVARD PROPONENT: CONTRA COSTA COUNTY 0-1 ,I n II�I • Ji li LAS JUNTAS WAY ih PROJEC lid Pleasant Hill 121 �� BART station . cc DESC TION: This projeorfsists of , , constructing a bicycle/pedestrian bridge along the Iron Horse Trail ''' TREAT gLyp alignment crossing Treat — - Boulevard in the vicinity of Jones Road. The bridge will provide a ;i.i; JONES grade separation between traffic 1'; RD on Treat Boulevard and traffic on lot; } the Iron Horse Trail. Treat Boulevard provides access to a LEGEND BART station and to I-680. The 6690600 PROPOSED TR'A'IL Iron Horse Trail is a Class I bikeway facility that will ultimately parallel the full length of 1-680 in Contra Costa and provide access to the BART station. STATUS: The project is in the design stage and is included in FUNDING SOURCES ($ X 1000): the Pleasant Hill BART Station Area Specific Plan. ,.0g=x;� The project is supported by the adjacent Measure C (Esc-rS).' 'U ' 1,238.1 neighborhood groups,the Pleasant Hill BART ; •.�.; Station Area Steering Committee, and the East Bay TOTAL $ 1,238.1 Regional Parks District which is the operator of the Iron Horse Trail. With Measure C funds programmed for FY 01/02,the County would ' Measure C funds shown in escalated dollars. proceed with final design and environmental Actual commitment is in 1988 dollars as shown in clearance activities. The County Redevelopment Appendix A. Agency currently has a consultant finalizing a community developed design. Final design expected to start in Fall 2001. 7/19/01 Draft Appendix D D 21 ��9 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY RICHMOND PARKWAY PROPONENT: RICHMOND � PROJECT O'. ', \ I 81v6d .•.. , 5 3� San Pablo Bay M.b lNewWAM,,r,p, DE RIP The R m p , arkway Project is a four to six-lane, limited access a arterial approximately 7.3 miles in '"" "'° P.,,. •' length,linking I-80 near Hilltop Drive to Interstate 580 at two 3 ROW interchanges (Castro Street and �. Canal Boulevard)near the n 1... Richmond-San Rafael Bridge. The project has a landscaped d1Ay /2 center median and controlled \c' O 0.cAm.d access at 16 signalized intersections and six interchanges. ACp ALO ArE . A ■ T 1 CANAL .L1. Q8 STATUS: LEGEND. c,".G M. D.1 Ne YYY BAST S.M.. -0. f W INTERCHANGE seo Construction is complete, on all M SECTION COMPLETED sections except Section 1 B O SECTION NUMBER (South),which is under construction, scheduled for completion in 2001. FUNDING SOURCES ($ X 1000): TBD* 18,000.0 I Measure C funds shown in escalated dollars. Local 28,378.0 Actual commitment is in 1988 dollars as shown in Measure 1 W6 38,510.0 Appendix A. SLTPPs 12,388.0 ' ~. ,� * TBD=To Be Determined Federal r.� W 2,300.0 Measure C (Esc:$)' 87,062.6 TOTAL $ 186,638.6 D22 Appendix D 7/19101 Draft 5- q0 .2001 DRAFT STRAFE GIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY �c I QO QPc,J 91 0 Cq!At Qa i 4 B R •.~ aI� RD ca O LEND e 4 O 3� v __— EXISTING 3 ' PROPOSED PROPOSED BART — - x ROUTE 4/WILLOW PASS - Reconstructed the Willow Pass Road interchange GRADE LOWERING near community of Bay Point; and - Provided sufficient median width between the PROPONENT: eastbound and westbound lanes to accommodate CONTRA COSTA the planned BART extension and two future HOV lanes. TRANSPORTATION AUTHORITY-�_" . . .`�', STATUS: Construction completed in 1995,wetland monitoring PROJECT NO ` will continue through FY 1401/1401 i�\ -- DESCRIPTION: The Route 4/Willow Pass Grade Lowering project was designed to increase capacity,reduce FUNDING SOURCES ($ X 1000): congestion, improve safety, and accommodate the extension of BART to eastern Contra Costa State 1,900.0 County. The project has accomplished the Federal R, ', 3,200.0 following: Measure C 6! 65,401.7 - Widened Route 4 from four through lanes with TOTAL $ 70,501.7 auxiliary climbing lanes to six through lanes; Measure C funds shown in escalated dollars. - Provided auxiliary climbing lanes over Willow Actual commitment is in 1988 dollars as shown in Pass summit; Appendix A. - Reduced the Willow Pass grade from 7.0 percent to 3.5 percent; 2 $27,088,200 of this amount represents the Measure C BART funding contribution to this project. Funded from both Route 4 East and BART categories. 7/19/01 Draft Appendix D D 23 S- W 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY ova I m .``L u o _ 4 BART STATION---"" 0 - � \\ F —� ��.� (— T N J lgr � r LEGEND ---- EXISTRG q ® PROPOSED PROPOSED BART WE w SR 4 (E) WIDENING: BAILEY STATUS: ROAD INTERCHANGE Construction completed in March 1996. PROPONENT: FUNDING SOURCES ($ X 1000): CONTRA COSTA TRANSPORTATIONi��Ja\� Measure C (Esc.$)' ' 76,929 v� �r' � V.:• AUTHORITY /� TOTAL ��r `�� $ 75,929 PROJECT ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in 1402/140 r Appendix A. a $32,901,900 of this amount represents the Measure C DESCRIPTION: BART funding contribution to this project. This project reconstructs the Route 4/Bailey Road Funded from both Route 4 East and BART categories. interchange to accommodate the expansion of Route 4 to eight lanes and to allow for the construction of the new West Pittsburg/Bay Point BART station. West of the interchange,Route 4 is widened from four lanes to six lanes with sufficient width between the eastbound and westbound lanes to accommodate two future HOV lanes and the BART extension to east Contra Costa County. East of the Bailey Road interchange, Route 4 conforms to the existing four lane facility. D 24 Appendix D 7/19/01 Draft ?001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY 'r MCI p 6e.i n sl U PLIajit- - Conform Exist 4 Lane Freeway----. 4_ Restripe Median Shoulder _ r d HOV to AdLanes ro Qa Widen to an 6-Lane Section__ __ Widen to . . o�;!�` I , [Including N6v Lanes) 6-Lane Sectionol BART Station LEGEND !7[•1\ u� __--_.:= EXISTING !�PROPOSED ' -- s•. SR 4 (E) WIDENING: BAILEY ROAD TO RAILROAD STATUS: AVENUE The CEQA/NEPA environmental clearance was obtained in May 1998. PROPONENT: Final design was completed in January 1999 and CONTRA COSTA construction started in June 1999. Construction is TRANSPORTATION--- Scheduled to be complete in September 2001. AUTHORITY,,.—=' PROJECT,NO: 1 _ - 1403/1403B./1403C FUNDING SOURCES ($ X 1000): DESCRIPTION: Federal a,tK (Esr- !1-1 1,224.0 Measure C ,) -"i? 27,956.0 This project will widen the existing highway, from two to four lanes in each direction (including an TOTAL ` �-� � S 29,180.0 HOV lane), between Bailey Road and Railroad Avenue,restripe the existing median shoulder I Measure C funds shown in escalated dollars. between Port Chicago Highway and Bailey Road to Actual commitment is in 1988 dollars as shown in provide an HOV lane in each direction, and Appendix A. provide a wide median to allow for the future 2 11,693,200 of this amount represents the Measure C extension of BART further into EAST County. BART funding contribution to this project. Funded from Route 4 East, BART and Commuterway categories. 7/19/01 Draft Appendix D D 25 s-y� •2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY Ma P Be—,n9 U P (,I-+fC . b \ ,I II ii II II II I � 1 WII 11 II I, 11 II I I I I I I '<I I I I I I I j l I I i t i t I -- id II i' jj I� II ii II II II II I II I.I II II I II> <I II 1 LJ Jl_J II II r �� r�r�--�J�= r����-�L------ <I it ISI I I I I I I 1 I I I to i i/'1 I LJ LMACANTHIAI AYEJ LJI I I I, I I It II J L-J uro fl.J L-J u �A_"�J� L ': �l Ii---- • 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY Alternate 1 Alternate 2 i w o � CALiFORR111 _ CACIFORRIA_ o-° nn o p 5 Be,i n O J Upcl a-i-ed J SR 4 (E) WIDENING: LOVERIDGE ROAD TO STATUS: SOMERSVILLE ROAD The Project Study Report was completed in February 2000. Environmental Clearance has just begun and is anticipated to be complete by in June of 2002. The PROPONENT: Final Design documents are scheduled to be CONTRA COSTA completed by December 2003 and Construction is anticipated to start in February 2004 and to be TRANSPORTATION completed in June 2006. AUTHORITY PROJECT NO: 140611406B FUNDING SOURCES ($ X 1000): DESCRIPTION: Measure C (Esc.$)I.' 27,574.9 This project will construct eight through lanes (three STIP (2002 Proposed) 27,000.0 � mixed flow and one HOV lane in each direction) on ITIP 3,000.0TCR 14,000.0 State Route 4 (SR 4) from just west of the Loveridge Road vicinity to the interchange of Century TOTAL � $ 71,574.9 Boulevard Undercrossing and then transition to a six-lane facility(three mixed flow lanes)to just west of the Somersville Road bridge. The project I Funded from the Route 4 East and BART categories. includes reconstruction of the Loveridge Road , Measure C funds shown in escalated dollars. interchange as well as a median wide enough to Actual commitment is in 1988 dollars as shown in accommodate a future BART extension. Appendix A 7119101 Draft Appendix D D27 yS •2001 DRAFT STRATEGICPL4N-Fact Sheet CONTRA COSTA TRANSPORTATION AUTTIORITY Stage 1 Stage 2 Stage 3 I—PG&E Transmission Tower line Unoed (Phsa 1*%IPll 3 Ee) 'eyes 1 1W elbound":;2 usaa propwad routs .. a,it* �\\ F A'bary (oY1I RH IIdIWy - 5Y //� Graphite (.'[T)'HALL* - Sycamore (Curve comeollen' 0„\aa a opo Routs 4 Full movement b st-prede lnttneetlon _ 1 9 ��.a a, �-------•-�---- Franklin hn,nn \ y Galrcoune I t111111 n Potantlal~bour d Potentl.l s1eM dUbnn eeeaes wm�tlon no, Eatbound tome y LA pda,�ed w..sat.nnpmpnwey r. 1 ' ROUTE 4 FREEWAY GAP CLOSURE PROJECT - STATUS: PHASE 1 Construction started on Phase I in July 1999 and is expected to be completed by Fall 2002. PROPONENT: CONTRA COSTA TRANSPORTATIO x1--�'� AUTHORITY .;..:• PROJEC 1501 ` FUNDING SOURCES ($ X 1000): DESCRIPTI Federal 7,500.0 This project is Phase I of a two-phase plan to State 25,167.0 convert Route 4 into a full freeway between Measure C (Es 51,200.0 Cummings Skyway and I-80. Phase I will provide a four-lane, fully divided facility by constructing TOTAL $ 83,867.0 two new westbound lanes north of the existing highway,then converting the existing highway in 1 Measure C funds shown in escalated dollars. that same area into two eastbound lanes. Actual commitment is in 1988 dollars as shown in Appendix A. ' In addition, West County Subregional Transportation Mitigation Program (STMP) funds will be available to supplement Measure C funds ($4,029.0 is anticipated). D 28 Appendix D 7/19101 Draft '=' z_j 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY I Rodeo ow 80 S J 3 de Separation AVE iN t �G Bq r y R A T LEGEA Exisling Proposed HereIle8 ROUTE4/WILLOW AVENUE STATUS: OVERCROSSING Construction completed in 1996. PROPONENT: HERCULES PROJECT-96. JAX 1503 DESCRIPTION: This project is a grade separation (safety)project that FUNDING SOURCES constricts a partial interchange at the intersection of ($ X 1000): Willow Avenue and Route 4. It includes adding Local 411.2 westbound Route 4 on/off-ramps at Willow Avenue Measure C (Esc.$)' 7,318.6 and an eastbound Route 4 acceleration lane from Sycamore Avenue. Also included in this.project is a TOTAL $ 7,729.8 new eastbound Route 4 on-ramp at Bayberry Avenue, to be paid for with local funds. This project provides safety and circulation improvements which ' Measure C funds shown in escalated dollars. will help reduce the accident rate and congestion in Actual commitment is .in 1988 dollars as shown in the vicinity of this intersection. Appendix A. 7/19/01 Draft Appendix D D29 5--q 7 2001 DRAFT STRATEGIC PLAN-Fact Sheet . CONTRA COSTA TRANSPORTATION AUTHORITY MORAGA ROAD , SAFETY IMPROVEMENTS PROPONENTS: — LAFAYETTE j e. IABLO BLVD. PROJECT.NO: MT 1600 DESCRIPTION: �':MORAGA LL .BLVD. Moraga Road Safety Improve- o ments is a series of small projects which will focus on specific safety improvements on Moraga Road in c Lafayette. These improvements BRooK ST o will include: • 'SCHOOL a. Crosswalk warning system at n� ST Hamlin Road/Tanglewood b. Removal of 3 mid-block crosswalks c. Removal of bike lane designation from Moraga sT Road 4f.4 A? Designation of new bike Rt'`s. C? RD routes on School Street, First Street, Brook Street J ,0 / e. Adding a 5-section signal head at the intersection with a Mt.Diablo Boulevard % HAMUIV f. A "safe route to school"plan RD STATUS: FUNDING SOURCES ($ X 1000): (b), (c), (d),and(e) are completed. (a) and (f)will be completed in 2003 concurrently with project Measure C (Esc.$)' 11.4 1612. TOTAL '� $ 11.4 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 30 Appendix D 7/19/01 Draft 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY M., Carpo ot S4,V 7,4 Mq R/;q � I AVL in a ORINDA yyAy � I a PABLO a ti _ _ _ --_ -_- -_- ----- - it - a M - •t ja 'a• ffi _ .., sct - - .- SO*17A s+r CAMINO PABLO CARPOOL STATUS: LOTS & SANTA MARIA Construction has been completed on the park and ride INTERSECTION lot near the Santa Maria Church, the additional turn lane on northbound Camino Pablo to westbound IMPROVEMENTS SR24, and the traffic signal coordination. PROPONENT: FUNDING SOURCES ($ X 1000): ORINDA -060 Measure C (Esc.S), 321.8 PROJECT N8; 1 1 602 ��,-� TOTAL $ 321.8 DESCRIPTION: ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in This item includes the following improvements: A Appendix A. park and ride lot near the Santa Maria Church, the addition of a second lane on northbound Camino Pablo to westbound SR24, signal coordination along Camino Pablo between Santa Maria Way and Camino Encinas. 7/19101 Draft Appendix D D 31 5--q9 •2001 DRAFT STRATECICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MORAGA WAY AT GLORIETTA BOULEVARD AND CAMINO ENCINAS 24 PROPONENTS: ORINDA C9��NO r PROJE p'a� o 1607 1 DESCRIPTION: ° n This project includes: additional N� of a right-turn lane to both northbound Moraga Way and westbound Glorietta Boulevard, moving the northbound Moraga .LEGEND 9� s Way bus stop to the north side of 9 PROJECT LOCATION 990 the intersection, addition of a 1607 CCTA PROJECT NUMBER �= separate pedestrian walkway along the north side of Glorietta BROOKSID Boulevard between Glorietta Court and the relocated bus stop, / 1607 a pedestrian crosswalk across Moraga Way to access the northbound and southbound , Moraga Way through this intersection. T Improvements at the Camino Encinas intersection better channelize traffic through the Brookwood intersection. These improvements are in both the southbound and northbound directions. In FUNDING SOURCES ($ X 1000): the southbound direction, the merge lane length (from two lanes to one)extends to Overhill Road. In the northbound direction, the second northbound Measure C (Esc.$)' 2,113.8 lane begins near Overhill rather than its current TOTAL $ 2,113.8 beginning shortly before the Camino Encinas intersection. ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in STATUS: Appendix A. Construction completed in Spring 2001. D 32 Appendix D 7/19/01 Draft S- Sr) 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MORAGA WAY SAFETY IMPROVEMENTS PROPONENTS: I O RI N DA RHEEM � l ,o e PROJECT NO: , 1608 DESCRIPTION: ° This project proposes to construct some of the recommended features from the Moraga Way q �� Pedestrian Safety Study (1997) as o Z o ,� well as initiate studies necessary o,o \`!1. to analyze traffic flow at 3 oR o intersections along Moraga Way �Ih between Ivy Drive and Glorietta Boulevard. Pv 3 STATUS: �y9` The Moraga Way Pedestrian Safety Study has been completed LEG_ END o� and improvements proposed in this study such as separate °°°°° PROJECT LOCATION walkways and crosswalks are 1608 CCTA PROJECT NUMBER anticipated to move forward in 2001. FUNDING SOURCES ($ X 1000): Measure C (Esc.$)' 74.1 TOTAL $ 74.1 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19101 Draft Appendix D D 33 S- 5 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY Moraga Way/Ivy Drive Roadway Improvement & Signalization Project. RHEEM PROPONENTS: I �a ORINDA �Q PROJECT hhQQ 1609 L "'°Rq�. DESCRIPTION: 9 x � The proposed project will modify q.04 Q `. the intersection to provide a free r o right turn lane from Southbound o 0 0 3 Moraga Way to Westbound Ivy Drive. The existing signal will be replaced and sidewalks will be widened to meet ADA standards. r� STATUS: Project is in the design stage and 9A expected to be completed in Fall 2001. LEGEND.. 0 �.� PROJECT LOCATION `1609 (1609.) CCTA PROJECT NUMBER R � Y FUNDING SOURCES ($X1000): Measure C (Esc.$)' 128_1 TOTAL $ 128.1 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 34 Appendix D 7/19/01 Draft S—5121 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY GATEWAY EB ON-RAMP MERGER WITH AUXILARY LANE 24 1 MATCH ORINDA OFF-RAMP �;�� \\ ����� •'j r^� �`7 WIDENING PROJECT (Pnase 1) END BIKE PATH N ,'c`� — \�✓ J LEGEND EXISTING �� —�--��-- BART TRACKS GATEWAY BLVD. BEGIN BIKE PATH PROPOSED AUXILARY LANE •••••••••••• PROPOSED BIKE PATH Tx SR 24 AUXILIARY LANE Brookwood off-ramp. Phase II was Project 1702 SR-24/Brookwood Off-Ramp. The Orinda City PROPONENT: Council does not support ramp improvements. The CONTRA COSTA Orinda City Council has requested that Caltrans review the auxiliary lane as a stand alone project TRANSPORTATION . without improvements at the ramp. AUTHORITY STATUS: PROJECT NO: Construction is unfunded but future SHOPP cycles 1610 will be pursued. DESCRIPTION: This project proposed to provide an auxiliary lane FUNDING SOURCES ($ X 1000): between Gateway Boulevard Interchange and the Orinda Interchange on eastbound Route 24. This Measure C (Esc.$)' 429.3 will largely be accomplished by restriping of existing lanes and shoulders. The project would TOTAL $ 429.3 also relocate the existing bike lane from Route 24 IDS to a new bike path south of Route 24, ending on Brookwood. The construction cost is estimated at ' Measure C funds shown in escalated dollars. $5.1 million. Actual commitment is in 1988 dollars as shown in The Strategic Plan includes funding Appendix A. only to continue project development. No construction funds are programmed. This project would be the third in a sequence of interrelated projects to improve operations at the 7/19/01 Draft Appendix D D 35 - S.� 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY �F � I of o a BLVD. .... �` � Q.�PLAZ,.. GOLDEN GATE G� �l LEGEND �0000 PROJECT LOCATION 1611 CCTA PROJECT NUMBER „--,.. •` � - - --_ - as MT. DIABLO BOULEVARD CORRIDOR IMPROVEMENTS STATUS: Construction completed in early summer 2001. PROPONENT: LAFAYETTE PROJECT NO: 1611 DESCRIPTION: This project adds a third eastbound through lane to Mt. Diablo Boulevard between Oak Hill Road and Moraga Road. At the intersection of Mt. Diablo FUNDING SOURCES ($ X 1000): Boulevard and Moraga Road, a third southbound lane was added. To the south, Plaza Way and on- Measure C (Esc.$)' 4,080.3 street parking was eliminated to remove conflicting turn movements from this side street. To the east, TOTAL � $ 4,080.3 Golden Gate Way was realigned to restore circulation and access and on-street parking to businesses on Plaza Way. The project includd some landscape work that mitigated loss of ' Measure C funds shown in escalated dollars. existing landscaped medians and park area. Plaza Actual commitment is in 1988 dollars as shown in park was rebuilt using local funds. Appendix A.. D 36 Append&D 07/19/01 Draft J- Z.-q ,2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MORAGA ROAD CORRIDOR IMPROVEMENTS I PROPONENTS: LAFAYETTE, _.:- - - ti fir..• o PROJECT N 1612 ,� [.13LL14V MT p1AgL0 ® �E7,— DESCRIPTION: cc This project will be completed in four phases: / Q MORAGA BLVD' Phase I: Brook Street will be closed es with temporary measures at the X intersection with Moraga Road. The 2 existing signal and crosswalks at this intersection will be eliminated. This is BROOK :ST intended to provide immediate traffic • SCHOOL congestion alleviation to Moraga Road. ST Two months after the closure is in effect,traffic data will be collected to confirm the anticipated benefit. Phase II: A traffic signal will be installed at the intersection of Moraga Road and Moraga Boulevard. The ST signals along the corridor from Mt. l MgRr. Diablo Boulevard south will be LEGEND coordinated with an interconnect so**a PROJECT LOCATION system. Phase III: Right-of-way will be �16CCTA PROJECT NtHNBER acquired to accommodate the realignment of Brook Street with School Street. A pedestrian walkway will be constructed along Moraga Road from Old Jones Hill Road to Rosedale as a safety improvement and to mitigate FUNDING SOURCES the removal of existing bike lanes on ( X 1000): Moraga Road. Measure C (Esc.$)' 1,533.1 Phase IV: Construct realignment of Brook Street with School Street. TOTAL $ 1,533.1 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. STATUS: Phase I: Complete Phase 11: Under construction as part of project 1611. Phase III&N: To be constructed in 2003. 7/19101 Draft Appendix D D37 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY 0 L a f a p e t t Isis �y la ( 24 DIABLO o 3 I 0 r I @ d L-- •! } a 'M�qY" s Bre It/rjelrr,9eNoir s �y C D e S96 Fintz 2414 n n or 14 nHEE 4r ^rF awl 1613 'n 7 E4 � al�g Ii LEGEND "7 M o r a g a O PROJECT LOCATION " 1r 1G13 CCTA PROJECT NUMBER � — ti Cit,o!L.lov.tt. ' lbwn of M...,. 4" c� r MARtm9 y /J • a LAFAYETTE CARPOOL LOTS FUNDING SOURCES ($ x 1000): PROPONENT: Measure C (Esc.$)',,. 275.6 LAFAYETTE - TOTAL f -�" $ 275.6 PROJECT NO: 1613 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. DESCRIPTION: This project proposes to construct two carpool lots. One lot would be constructed in the southerly portion of St.Mary's Road near the Lafayette Community Park. The second lot would be constructed along Deer Hill Road. STATUS: The St. Mary's Road carpool lot is constructed. The Deer Hill Road project will be implemented at a later time pending completion of a preliminary study, neighborhood discussions,and final plans. Construction of Deer Hill Road is not likely to proceed prior to FY 2004. D 38 Append&D 07/19101 Draft 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MORAGA PARK AND RIDE LOT PROPONENTS: MORAGA o o CC u Iti PROJECT N •� 1620 cc \ ` DESCRIPTION: This project proposes to construct '�0 a park and ride facility off Moraga co cq Way near School Street. The ayr9 project will provide a place for � PSP carpools to park and will provide . caye wqy CoQ shelter for those waiting for rides in inclement weather. This 4D location is near an established �o°y casual carpool pickup point, with `' �o BART and CCCTA access for the return trip. Currently the number of carpoolers is limited by the amount of available parking. This project will allow additional commuters the opportunity to participate in this carpooling ` \ activity. STATUS: r FUNDING SOURCES ($ X 1000): Measure C (Esc.$)'•', ? TOTAL $ ? ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7 Lamorinda Regional fees are anticipated to supplement Measure C funds potentially up to $268,000. 7/19101 Draft Appendix D D 39 _ 5 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY L a t a y 24 oua�a 7° ' I 1` i P?Ey •�r � �? 0 I d 24 o ° 1621' 4' �✓ �� Lnfe oleo RHEEN`` �P } ti 10 � ey �'Z• 1621%1721' LEGEND 0 8 g g it l0000 PROJECT ATI N CCTA PROJECT NUMBER o o x ��a(Le(e otl ' s o n of No:nYe e Hq Oq MARY'S / � 5i I`•SI YffJ;l..; t � '••.Ccll/jl,••• z ST. MARY'S ROAD - PHASE II FUNDING SOURCES ($ X1000): PROPONENT: Measure C (Esc.$)' , 799.3 LAFAYETTE TOTAL $ 799.3 PROJECT NO: ' Measure C funds shown in escalated dollars. 1621 ` ' Actual commitment is in 1988 dollars as shown in Appendix A. DESCRIPTION: This project completed unfinished improvements planned in the original Measure C project(1711). The project stabilized roadway embankments at various locations, and re-configure two intersections that provided turn lanes and correct adverse horizontal alignments. Other improvements included shoulder work,minor drainage, and a walkway gap closure on Glenside Drive between Reliez Station Road and the Lafayette Moraga Regional Trail. STATUS: Construction is complete. D 40 Appendix D 07/19/01 Draft 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MORAGA ROAD: STRUCTURAL & 0'CONNOR. SAFETY STUDY PROPONENTS: LAFAYETTE I MgRYS I s PROJECT NO: \. � HA. '1622 MRD ��N 162.2 DESCRIPTION: MORAGA This project involves structural. RI • hIF,OCK-.RD �i�••��•••••��v•�••.. and safety improvements along ao the corridor. Items of work wF�4 include:Access improvements at •' intersections,shoulder work, potential slope stabilization, •' pavement rehabilitation,removal LEGEND of safety hazards, and related .• improvements. Siff* •v�•• PROJECT LOCATION ....• • 1622 OCTA PROJECT NUMBER • o STATUS: :MADRONE o • DR Improvements from the Lafayette/ Moraga town limits to Rimrock Road are completed. The •��•+.. remainder of the work is scheduled for 2003 in conjunction NADP with work on project 1612. GRP VAP i �F FUNDING SOURCES ($ X 1000): Measure C (Esc.$)' 226.2 TOTAL $ 226.2 ' Measure C fun shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A.. 7/19101 Draft Appendix D D 41 r 2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY ST. MARY'S ROAD "EI" IMPROVEMENTS 9EECHW000 DR \�.. STATION AD PLEASANT E.Pavemuro ent Overlay e of Intersection. Olt PROPONENT: LAFAYETTE / PROJECT NO: . / -o.moms sl pews and 1711 �e�Distance. L Realign Curve and Stabilize Slope y 4P DESCRIPTION: at Varian Locations _ North Leg to This project constructed SOUd*K nd circulation, drainage, and safety ; Left Right T ,rns and Northbound improvements in nine phases QRel*we Bus stop, i Replace storm Drains along the length of the existing and Provide Tern Lana.— $ two-lane roadway corridor. The ! '"B.Leh Turn Lama corridor includes the following F ff \ LEG E4D A Improve Drainsoe and roadways: 1) Olympic Boulevard cautnxt walkway. G from Pleasant Hill Road to Reliez AL—s EXISTINXISTIN ED F.StabilimRadws creek Be*, Station Road, 2) Reliez Station ' •.........^°.^^. EXISTING TRAIL � Restigi Roadway and Road from Olympic Boulevard to ��' COfa""ct Walkway. Glenside Drive; 3) Glenside Drive from Reliez Station Road to St. :___—K Realign Road and Stabilize Mary's Road; and 4) St. Mary's \ Bank Road from Glenside Drive south to the city limits. Major widening and realignment g� was not required. Items of work r � limit city included left-turn lanes, access / limit Ilne. improvements at intersections, shoulder work, drainage, a. walkways, and slope stabilization. - STATUS: FUNDING SOURCES ($ X 1000): Construction completed in 1995. Ao Measure C (Esc.$)1, 3,793.3 TOTAL $ 3,793.3 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 42 Appendix D 7/19/01 Draft J— �n� 2001 DRAFT STRATEGIC PLAN-Fact Slieet CONTRA COSTA TRANSPOR TA TION A UTHORITY SAN RAMON VALLEY BOULEVARD IMPROVEMENTS PROPONENT: DANVILLE f `��ti��FEZ WAY i PROJECT NO: 1715 '�. N9 ization DESCRIPTION: This project realigns and modifies VL the signals at the intersection of San Ramon Valley Boulevard, o sot+ Railroad Avenue,Hartz Avenue, and Hartz.Way;provides signalization at the intersection of Hartz Way and Front Street; and - widens San Ramon Valleyn�s ave cr Boulevard from Sonora Avenue LEGEND to Town and Country Drive. The project also includes raised ---- EXISTING ROADWAY median turn pockets, pavement. 11�011 ROADWAY IMPROVEMENTS replacement and overlays, _ restriping,and frontage improvements. The overall project provides four continuous lanes from the San Ramon Valley Boulevard/Railroad Avenue/Hartz Avenue/Hartz Way intersection south to Podva Road. FUNDING SOURCES ($ X 1000): STATUS: Construction completed in 1996. Local 175.0 Measure C (Esc.$)' 1,884.2 TOTAL $ 2,059.2 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7119/01 Draft Appendix D D 43 '2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY SAN RAMON I VALLEY rte: ,'1i `�� BOULEVARD J IMPROVEMENTS - P �\ .r� HART2 AVE' PHASE 2 ' Op94p0 9 Sp�pR4 PROPONENT: AVE DANVILLE ESTATES OR OAK C .i ti PROJECT NO: 1716 N � . �\DESCRIPTION: PROJECT — .6801, Thisro ect would install new v ;I' '• P J stop bar loops on San Ramon i RE Valley Boulevard (northbound SYCAMO9 and southbound) at Sycamore =Rp =: =, Valley Road and the entrace to the Livery&Mercantile. The project will also replace four(4) pDA'R CT '4F signal poles, add emergency o vehicle preemption at both RD intersections, upgrade controller ',';`,, software and illuminate street name signs. Measure C funds o will fully fiend construction. OC 0..p� NO �9 4 STATUS: FUNDING SOURCES ($ X 1000): 65%design in complete. Construction in anticipated in FY 2002. Measure C (Esc.$)' 214.2 TOTAL $ 214.2 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. D 44 Appendix D 7/19/01 Draft 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORI-TY P p � I 1 ROAD AN N =__----_ CROW CANYON ROAD This project is funded from a combination of funds IMPROVEMENTS including TEA-21 funds, STIP monies, local funds and City development fees. Measure C funds will be mainly used.for construction of climbing lane and PROPONENT: turn lanes. CITY OF SAN RAMON STATUS: PROJECT NO: " Construction of all the above work is complete. 1718 DESCRIPTION: FUNDING SOURCES This project provided the following improvements ($ X 1000): for Crow Canyon Road from west of Bollinger Canyon Road to the San Ramon City limit: TEA-21 485.0 STIP 100.0 1. Mitigation of chronic exisiting peak period Local 119.0 E 207.0 C traffic congestion by providing an extended Measure ( westbound climbing lane and eastbound turn channelization. TOTAL $ 911.0 2. An asphalt concrete overlay on Crow Canyon Road from Bollinger Canyon Road west to the City of San Ramon city limit. Measure C funds shown in escalated dollars. 3. Construction of a raised median west of Actual commitment is in 1988 dollars as shown in Bollinger Canyon Road. Appendix A. 4. Traffic signal modification. 5. Street lighting. 6. Minor street widening that provides an additional eastbound through right tum lane at the intersection. 7/19101 Draft Append&D D 45 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY SAN RAMON VALLEY BOULEVARD / I DR WIDENING - �`�► �� '�� PHASE I PROPONENT: Phase't 1� SAN RA M O N (4 Lanes) o 11 I, New Signal PROJECT NO: m �1 .1720 1 p&VALLEY� C!*D ---= EXISTING DESCRIPTION: Phase 2(a Lanes) 7 i� � PROPOSED Phase 1(2 Lanes This project widens San Ramon With Left Tern Lane) ® NEW SIGNAL Valley Boulevard between Alcosta 9 Boulevard and Montevideo Drive. O �1l The project is being developed in two phases. The first phase included N X11 widening of the roadway from two to four lanes at the extreme north and south ends of the project, and Phase 1(4 Lanes) realignment of the roadway and it 1 Realignment utility undergrounding at the south \ end. Other work includes interim Acosu �JL1�Z���—___City of Saa Ramon relocation of overhead utilities along -- Alameda County the middle section of the project, installation of a traffic signal at Pine Valley Road;and construction of medians,turn pockets and landscaping throughout. Adjacent developers constructed concurrent frontage improvements and collector street intersections at the north end of the project. The second phase will include the balance of the widening from two to four lanes along the middle begin north of Pine Valley Road in the spring of 1998. section of the project and undergrounding of the remaining overhead utilities. FUNDING SOURCES ($ X 1000): The first phase was funded entirely from the Measure C Local 1,813.0 Southwest Arterial category with matching State-Local Measure C (Esc.$)' 7,037:3 Transportation Partnership Program funds. The second '� phase will be partially constructed by developers,and by . City development fees with a minor contribution from TOTAL, $ 8,850.3 Measure C funds controlled by the City. ' Measure C funds shown in escalated dollars. STATUS: Actual commitment is in 1988 dollars as shown in Constriction of the first phase was completed in the Appendix A. summer of 1997. The second phase is currently under design. Partial developer constriction is expected to D 46 Appendix D 7/19101 Draft i — e.,2{ 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY CAMINO PABLO %, (SAN PABLO DAM ,T ;,� LEGEND CORRIDOR) ° ___ _= EXISTING ALIGNMENT NEW ALIGNMENT PROPONENT: 0 ® NEW SIGNAL ORINDA o ~ PROJECT ��„ li. 1801 k , -9 \ DESCRIPTION: _^aR l Camino Pablo is the southeast `os portion of the San Pablo Dam Corridor, and is used as a link between the Richmond area and °" central Contra Costa County. It I \\\ �l \ New Signals is often used to bypass traffic0 congestion on the I-80 corridor and has high peak-hour volumes New Intersection creating local congestion in the City of Orinda. Frontage Road—�I\� The Camino Pablo project +�\ _ improves and realigns Camino Pablo in Orinda as a two-lane roadway and provides left turn i i lanes and separated pedestrian and bicycle paths. STATUS: Construction completed in 1996. s FUNDING SOURCES ($ X 1000): Measure C (Esc.S)' 5,057.9 TOTAL $ 5,057.9 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/01 Draft Appendix D D47 j '� 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY BART Tracka� ,......., ,1 4 In,u....,�.m..��.,.` u,e i. u� 'r,,,n�r '*. w PASS 71 O• ,} ..+„ use• ,„'_��' OAO �Eq, i i••a North Concord/ 4.�s; v0 Martinez \ ¢ BART Station \ c +�'6••. C'r� .i.. a•I O ,c•� ai •; � ,Y� )MAGAZINE\ OW PASA Be aint U. S. NAVAL BART9tetion / way R N RO C\ $• � Coocar - BART St 'on i LEGEND BART TRACKS f ---- CITY LIMIT BOUNDARY ;r 7 WATER WAY(Canal/Creek) Sign K-A—M 11101 BART EXTENSION TO PITTSBURG/BAY POINT STATUS: Extension is now operational. Revenue service for the North Concord/Martinez station began in PROPONENT: December 1995 and revenue service for the new BAY AREA RAPID TRANSIT station at Bay Point began in December 1996. DISTRICT (BART) PROJECT NO: FUNDING SOURCES ($ X 1000): 2101 € . BART Funds 39,800.0 1h.� r1 DESCRIPTIOItI: San Mateo 86,800.0 Construction of the 7.8-mile extension from State 103,000.0 Concord to Bay Point includes BART stations at Prop. 108 35,000.0 North Concord and Bay Point. Prop. 116 �?�� 35,300.0 Bridge Toll Fun IDS49,800.0 The project extends BART from the existing Measure C (Esc.$)I•2 75,617.9 Concord Station, via Port Chicago Highway to a new station located adjacent to the existing North TOTAL $ 450,517.9 Concord/Martinez Park and Ride lot. From there the alignment enters the State Route 4 median. Measure C funds shown in escalated dollars. State Route 4 has been modified to accommodate Actual commitment is in 1988 dollars as shown in the BART tracks including providing an acceptable Appendix A. grade (3.5%) over the Willow Pass summit. The 1 $59,990,100 of this funding represents the BART project terminates at the new Pittsburg/Bay Point share of the Willow Pass Grade Lowering and Bailey station at Bailey Road. Road Interchange projects. D 48 Appendix D 7/19101 Draft /_ J — (”) & . 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION AUTHORITY LEGEND — — — EXISTING ra PROPOSED EXISTI ® SIGNAL G I P an Idem Y Ill O a SYCAMCM VALLEY RgAD 1-680/SYCAMORE FUNDING SOURCES ($ X 1000): VALLEY ROAD PARK & RIDE State 405.0 Local 767.2 Measure C (Es, 2,411.4 PROPONENT: �. DANVILLE TOTAL $ 3,583.6 rd1k' r PROJECT NO: Measure C funds shown in escalated dollars. 2206PR/2206 '�.;;�' ""� Actual commitment is in 1988 dollars as shown in Appendix A. DESCRIPTION: Z Funded from both the Commuterway Fund category and the Carpool, Vanpools and Park & Ride Lots The Park-and Ride lot provides approximately 240 category. parking spaces, a bus transfer station and a car pool staging area located at the north east corner of I- 680/Sycamore Valley Road interchange. The Park and Ride lot was constructed in right-of-way owned by the Town and was served by both BART and County Connection buses.The interchange on the east side of the freeway was modified to a diamond configuration with restriping and island median changes to Sycamore Valley Road. STATUS: Construction completed in 1998. 7/19/01 Draft Appendix D D 49 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY L Existing a —,low AGG661 Station 4 3 prop d Bus -rransie Ares Bridge U PhsfiG 3 -------...... CoSP site Xv--�.". L���j, �dddd"``� O 0 P\ .4 Bridge phase 2 IPA 2gl MARTINEZ INTERMODAL pedestrian bridge over the tracks. (Measure C isnot FACILITY funding Phase 3.) STATUS: PROPONENT: The new Amtrack station is nearly complete and the MARTINEZ new passenger boarding platforms are under con- struction. The station landscaping is also under PROJECT NO: construction and will be opening in the Fall of 2001. 2208PR/2208 DESCRIPTION: The Martinez Intermodal Transit Facility is planned to be constructed in three phases. Phase I FUNDING SOURCES ($ X 1000): will consist of 175 parking spaces, a new bus Federal (ISTEA/TEA-2 I/TEA) 4,500.0 0 .M. State (TCI) 3,300.0 facility, including apprp1hkately ten new bus bays BART 2,000.0 ts, creek landscaping/ with canopies,bicik Measure C Esc. 4,700.0 ga miti t1on a . dVotnFrol, acquisition of the ( STIP 4,900.0 -" existing stat�ioSd bus turnaround site fora City (Minor Capital o 100.0 carpool/vanpool staging area, and site preparation Prop.116 3,400.0 for the new station. Phase 2 includes a new station, TFCA 300.0 new platforms,trackwork,external passenger Union Pacific 4,700.0 waiting area, creek pedestrian bridge, and HRGC (via PUC) 200.0 passenger amenities. Phase 3 includes additional SLTPP 1,400.0 land acquisition north of the tracks,new road access to the north lot (both east and west), TOTAL 29,500.0 approximately 425 additional parking spaces and a D 50 Appeyidbc D 7119101 Draft 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPOR TA TION A UTHORITY SAN RAMON / I INTERMODAL TRANSIT FACILITY ' I I TR I Q PROPONENT: I a I I SAN RAMON l� I EXECUTIVE --�� ��-- PROJECT NO: - _ _ PARKWAY I i 1 r - � 2209PR/2209 I i Car Pool Parking I DESCRIPTION: I I The Intermodal Transit Facility provides approximately 54 I parking spaces, and agi all weather I O I r Tr ster Area I I public transit u ? . ch o I accom. t �nsit vehicles. i z The ci .1?located at Camino Ramo" Executive Parkway in 8,19 Ranch. The intent of the I I I facility is to provide a transfer I I point for buses and carpools in I I I order to reduce the number of single occupant vehicles on the I road. I I STATUS: I I Construction completed in 1996. HIM FUNDING SOURCES ($ X 1000): Federal (ISTEA) 900.0 State (TSM) �A eic 116.6 Measure C (Esc.$ '? �'° 1,047.7 TOTAL $ 2.,064.3 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 2 Funded from both the Commuterway Fund category and the Carpools, Vanpools and Park & Ride Lots category. 7/19/01 Draft Appendix D D 51 5 '�'9 + •2001 DRAFT STRATEGICPLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY EL CERRITO PLAZA BART STATION PARKING I STRUCTURE Fe P Cerrito Del Norte BART Station I r PROPONENT: 61 C e r r i t o EL CERRITO BART Station k Parking Lot PROJECT NO: 2301 --ei.Cerrito Plan BART Sfat:on DESCRIPTION: _:r;�:•�:!� .-�.��}�—Shopping Center The project includes a new y parking structure near the El gen �ranaratn Sar 1 , It Cerrito Plaza BART Station that will provide approximately 400 new spaces. The parking garage so is to facilitate a joint development l Berkeley project as part. 'kie� m `Jath Be+"Keiey revitalizatiorl�ie N Cerrito BAF T Station C. % Y Plaza,-. pl 6riter. As ' curre'tl, eirvisioned,the spaces will be incorporated into a residential/commercial structure J in the Plaza Shopping Center. The Measure C funded spaces will be dedicated to BART patrons in the peak period,but available for shopping center patrons in the off peak. The City wishes to use the parking structure as a catalyst to help FUNDING SOURCES ($ X 1000): trigger additional economic activity in the vicinity of the Measure C (Esc.$)'?z 6,536.9 station and the El Cerrito Plaza sTOTAL $6,536.9 hopping area. ' Meas'' re C f6ffds shown in escalated dollars. Actual ommitment is in 1988 dollars as shown in STATUS: Appendr �C. The City is exploring the joint developement Z In addition, West County Subregional Transportation project as part of the revitalization of the El Cerrito Mitigation Program (STMP) funds will be available to Plaza Shopping Center. The Authority has supplement Measure C funds ($459,000 is anticipated). established a deadline of December 31, 2002 for the City and BART to execute binding agreement with the developer and property owner. D 52 Appendix D 7/19/01 Draft S --7(0 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY IRON HORSE Pleasant `asant I M ems° TRAIL e PROPONENT: EAST BAY REGIONAL Walnut Creek PARK DISTRICT 24 (EBRPD) PROJECT NO: 3101 ` Alamo'•. aTONE r M° This project installs signals, striping, and signs the Iron Horse Trail cro ;!e s in Danvill ,�.�aE e' Danvill t amon; it 0_1�1 _ videi'al funding for the GE provides g LEGEND overcrossing at Ygnacio Valley ................... TRAIL Road in Walnut Creek; it �`- completes the trail paving in °►M�' southwestern Contra Costa ° County down to the Alameda/ Contra Costa County line; and it provides fencing on the portion of sao trail adjacent to the San Ramon San Ramon Royal Vista Golf Course. STATUS: Construction completed in 1994. FUNDING SOURCES ($ X 1000): Federal (TEA) 640.0 Local (Measure A 85.9 Measure "C ' 714.6 TOTAL $ 1,440.5 Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/01 Draft Appendix D D 53 5-- 7/ • 2001 DRAFT STRATEGIC PLAN-Fact Slteet CONTRA COSTA TRANSPORTATIONAUTHORITY WALNUT CREEK CHANNEL TRAIL PROPONENT: EAST BAY J� S° ��•, REGIONAL PARK DISTRICT (EBRPD) �1\110 .,—Walnut Channel CTraisl PROJECT NO: 3102 TO BE COMPLETED ��• PARTLY WITH • MEASURE C FUNDS. - -,�� CONCOFM AN DESCRIPTION: This trail starts at the northern terminus of the Iron Horse Trail and runs along the Walnut Creek Channel northward to connect y with the Delta DeAnza Trail. The LEGENDTOBE;COMP,LETEQ WITKOTHER FUNDS. multi-use path is. foot wide ��,•„��, a i EXISTING paved hiking Aail. ••••••• PROPOSED TRAIL 01��� The CrConcord has secured 3” '�''t`�. Transportation Development Act -u .(TDA) funds to.supplement the East Bay Regional Park District n �� Proposition 116 grant and Transportation Enhancement Act (TEA) funds, in addition to Measure C funds. EBRPD is the lead agency for the project and is 11 coordinating with Concord and the County. ` EW goes STATUS: Construction of the trail is complete except for FUNDING SOURCES ($ X 1000): undercrossings at Willow Pass Road,Diamond Boulevard, SR242 and Concord Avenue, and the State 600.0 parallel pedestrian bridge over the channel at Federal1 10.0 Concord Avenue. The undercrossing and pedestrian Measure C (Esc.$), 406.1 '0'V V;� % bridge at Concord Avenue has been bid and the m;v. construction contract has been awarded.Measure C TOTAL $ 1,116.1 will partly fund the construction of the pedestrian bridge over the channel at Concord Avenue. Measure C funds shown in escalated dollars. Construction will start in April of 2001 and should be Actual commitment is in 1988 dollars as shown in completed by Fall 2001. Appendix A. D 54 Appendix D 7/19/01 Draft s= 7 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATION A UTHORITY RELIEZ VALLEY ROA® TRAIL PROPONENT: LAFAYETTE PROJECT NO: 310313103G L AVE DESCRIPTION: \ This project is a portion of a 3 multi-jurisdiction effort between Lafayette, Contra Costa County LEGEND and Martinez to buila bicycle trail from Pleasa ' i Road in Jro 00019 PROJECT LOCATION Lafayette t ra Valley 31Q3 CCTA PROJECT NUMBEF Road/ Avenue in Martine. e Lafayette portion of the project is being funded by N Measure C and will extend the tu existing pathway along Reliez Valley Road beyond Silver Dell Road and to the City limit. This extension will provide a safe connection for pedestrians and Up.E LN bicyclists north of Silver Dell Road to connect with the path to be completed by Contra Costa g County and transverse four jurisdictions. STATUS: FUNDING SOURCES ($ X 1000): The project design phase started in August 2001. Measure C (Esc.$)1.2 260.2 TDA 120.0 CMAQ 500.0 STIP 107.0 Local 183.5 TOTAL $ 1,170.7 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. ' Funded by Lamorinda Traffic program and Regional Bicycle and Pedestrian Trail categories. 7/19/01 Draft Appendix D D 55 7 4 r 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY ST. STEPHENS TRAIL PROPONENT: _ AITARIyeJ ORINDA L PROJECT NO: - 3106/3106GL DESCRIPTION: This project created a bicycle path and pedestrian trail southeast of State Route 24 along the freeway right-of-way and &I, tra Costa County. SanitaV0.1exi ict fee �i strip. I sting paths Ik0 /// ?.��'� %� D TRAIL on Ca Pablo Road and St. �\ l�`\ �,+j�J F.R. / Stephens Drive. Existing ��`� �\ , 'Uri•r•it7J� topography and trees were � ' preserved as much as possible. � . rya�,� �—_�i� ; LEGEND Trees that had to be removed ------- ✓ 1�<>°•J -__—' -------= EXISTING were either be relocated or mitigated within the right-of-way. i �/ ✓/ �`)��''o I; PROPOSED TRAIL 7 t STATUS: Constriction is complete. ;1 i J FUNDING SOURCES ($ X 1000): Federal (TEA) 200.0 State (TDA) 105.0 Local (TFCA Gr 160.0 Measure C (ESC-0 1,183.9 TOTAL $ 1,648.9 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 2 Funded from both Gateway/Lamorinda Traffic And Regional Bicycle and Pedestrian Trail Categories). D 56 Appendix D 7/19/01 Draft = 7// ­2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY TO BE FUNDE�p BY ME ASURE C.—_ ROAD WILLOW PASS A cc .ry J 2CCSlq• ANAL TRA C n c o r d in COMPLETED W LEGE 101 .................. PROPOSED TRAIL TO BE.FUNDED... BY OTHER.SOURCEsi SO DELTA DE ANZA TRAIL STATUS: The trail is essentially complete except at its easterly PROPONENT: end between Hillcrest and Neroly Roads. Private EAST BAY REGIONAL PARK development adjacent to that section is conditioned to construct that segment of the trail. Construction of the DISTRICT (EBRPD) signalized at grade crossing near Neroly Road is anticipated in 2003. PROJECT NO: 3108 DESCRIPTION: FUNDING SOURCES ($ X 1000): The Delta De Anza Trail connects Central and Eastern Contra Costa County. The trail has nine Local 440.0 sections, and is the result of a coordinated effort of State 300.0 the East Bay Region g rk District,the County, Measure C (Esc.'42"i 415.7 u and the Cities ,sbuand Antioch. It will TOTAL 1,155.7 provide acc, 4fAmber of community, Sla recreational facilities, as well as y V the Ba 1nt BART station. Measure C trail funds Measure C funds shown in escalated dollars. will be used to contruct and signalize at grade Actual commitment is in 1988 dollars as shown in railroad crossing near Neroly Road. The remainder Appendix A. of the trail will be funded with proposition 116, State, County,Developer,Measure AA and Measure C (from the State Route 4/Bailey Road Interchange project) funds. 7119101 Draft Appendix D D 57 '5 2001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY � o r`a w � O �'1 v Uj V l I Verde A. Elementary U) School_ m Q � North Richmond- Y Ball Park . i ........ Davis'; ?�: ••• Do via Pn rk Marsh ¢ 4 y I at Observation N I $ cr Platform j� Z IZI San 0 I _ a Pablo L / 5 BayMeasure "C•' Project--i LEGEND t• % PROPOSED TRAIL a WE d a. WILDCAT CREEK REGIONAL TRAIL STATUS: Design for the railroad crossing is complete. However, changes to the project requested by the City PROPONENT: of San Pablo have significantly increased the EAST BAY REGIONAL PARK construction cost resulting in a$1 million funding DISTRICT (EBRPD) shortfall. EBRPD is investigating additional sources of funding to complete the project. Construction is PROJECT NO: not likely to proceed prior to 2004. 3109 DESCRIPTION: The Wildcat Creek Regional Trail provides a FUNDING SOURCES ($ X 1000): pedestrian/bicycle connection between the San Francisco Bay Trail and the Ridge Trail in the:East Federal 1,326.0 Bay. East Bay Regio Park District is State 250.0 constructing a 1.= zrltion along the shoreline Local 631 .5 near the o Iitcat Creek which will Measure C (Esc. ' 556.9 connectie0,11.1—s of Richmond and San Pablo and provide a rink to the Richmond Parkway. Measure TOTAL $ 2,764.4 C funds will supplement the Corps of Engineers, Coastal Conservancy, Environmental ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Enhancement,and EBRPD Measure AA funds to Appendix A. construct a bridge over the SP and AT&SF railroad tracks. D 58 Appendix D 7/19101 Draft 1001 DRAFT STRATEGIC PLAN-Fact Sheet CONTRA COSTA TRANSPORTATIONAUTHORITY MARSH CREEK I TRAIL CROSSING N New Signalized Crossing AT STATE ROUTE I 4 Z Z �—•--Existing Trail 0N 4 PROPONENT: _ GRANT ST Q SUNSET RD EAST BAY New Trail—►;— REGIONAL PARK t _ r� DISTRICT (EBRPD) Existing Trail ap4e,' Gb PROJECT NO: 3110 HAVENWOOD AVE DESCRIPTION: O � Marsh Creek Trail links the Delta 9 9 De Anza trail to thof w LEGEND Brentwood an E � ••••••.......•••. PROPOSED TRAIL uninco. .. ey area, and bGteeg provid ass to the Santa Joaquin River shoreline. This SAND CREEK project will provide a safe RD crossing at State Route 4, by moving the trail to an existing intersection, and providing a traffic signal. STATUS: East Bay Regional Park District has completed the trail realign- ment and construction in 1997 of the two bridges over the canal. FUNDING SOURCES ($ X 1000): Local774.4 Measure C (Esc.$ 5i, 400.1 011W, i TOTAL $ 1,174.5 ' Measure C funds shown in escalated dollars. Actual commitment is in 1988 dollars as shown in Appendix A. 7/19/01 Draft Appendix D D 59