THE BOARD OF SUPERVISORS
CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order of September 26,2000,by the following vote:
AYES: SUPERVISORS GIOIA, UILKEMA, DESAULNIER, CANCIAMILLA AND GERBER
NOES. NONE
ABSENT: NONE 2000/462
RESOLUTION NO.
SUBJECT: Approving Plans and Specifications for
Site Improvements at Los Medanos Health Center
2311 Loveridge Road,Pittsburg
(CP#98-11)
Budget Line Item No. 6973-4604
Authorization No. 0927-WH604B
WHEREAS plans and specifications for Site Improvements at Los Medanos Health Center,
2311 Loveridge Road, Pittsburg, have been filed with the Board this day by the Director of
General Services; and
WHEREAS plans and specifications were prepared by Claudia Falconer Architect; and
WHEREAS the cost estimate for the initial construction contract is $60,000.00; and
WHEREAS the Board has obtained the general prevailing rates of wages, which shall be
the minimum rates paid on this project; and
WHEREAS the Board has previously found on February 18, 1998 that the project is a
California Environmental Quality Act(CEQA) Class 1 a Categorical Exemption, and the Director
of Community Development has filed a Notice of Determination with the County Clerk.
IT IS BY THE BOARD RESOLVED that said plans and specifications are hereby
APPROVED. Bids for this work will be received on November 2, 2000 at 2:00 p.m., and the
Clerk of this Board is directed to publish a Notice to Contractors in accordance with Section
22037 of the Public Contract Code, inviting bids for said work, said Notice to be published in
CON'IItA COSTA TIMES . The Director of General Services is
directed to mail notices to the construction trade journals specified in Section 22036 of the
Public Contract Code at least 30 days before the date of opening the bids.
IT IS FURTHER RESOLVED that the Director of General Services, or his designee, is
AUTHORIZED to issue bid Addenda, as needed, for clarification of the contract bid
documents, provided the involved changes do not significantly increase the cost estimate for the
initial construction contract.
Orig. Dept.: General Services Dept. -Architectural Division
cc: General Services Department
Architectural Division
G.S. Accounting
File: 345-9802/A.5
Auditor-Controller
Community Development
D. Foley
Health Services Department(Via AID)
Consulting Project Manager(Via AAD) l hereby certify that this is a true and correct
COPY of an action taken and entered on the
SJAb minutes of the Board of Supervisors on the
elate shown.
ATTESTED: SEPTEMBER 26, 2000
PHIL BATCHELOR, clerk of the Board
of Supelyisors,and County Administrator
By
Deputy
HAI998\3459802f8L0o2400b.doc RESOLUTION NO. • 2000/462