HomeMy WebLinkAboutMINUTES - 08082000 - C13 TO- BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS,BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT FROM: MAURICE SHIU, PUBLIC WORKS DIRECTOR DATE: AUGUST 8, 2000 SUBJECT: CONTRACT AWARD RECOMMENDATION; LANDSLIDE REPAIR PROTECT, HOLE #6, LAKES COURSE BLACKHAWK COUNTRY CLUB, DANVILLE AREA. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION L Recommended Action: AUTHORIZE the General Manager to AWARD a contract for furnishing labor and materials for the repair of a landslide on the sixth fairway of Blackhawk Country Club's Lakes Course to Environmental Golf,Inc., Calabasas, California in the amount of$745,321.56; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of$745,321.56 and$745,321.56 respectively. DIRECT the General Manager of the Blackhawk Geologic Hazard Abatement District(GHAD)to prepare the contract for the project. AUTHORIZE the General Manager to sign the contract on behalf of the Board subject to the General Manager having reviewed and found sufficient all required documents, including the contract signed by the contractor,the aforementioned surety bonds, and a certificate of insurance. AUTHORIZE the General Manager to issue one or more contract change orders, as may be required and without further Board action,up to a cumulative total equal to ten percent(10%)of the final contract or $74,532.16. AUTHORIZE the General Manager to execute License Agreements with the e Blackhawk Country Club and the Blackhawk Homeowners Association. A ,, Continued on Attachment:X SIGNATURE: _RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE —APPROVE —OTHER SIGNATURE(S): ACTION OF BOARD ON AUGUST 8, 2000 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS X UNANIMOUS(ABSENT NONE ) AYES: NOES: ABSENT: ABSTAIN: SE:cs g:\Grpdata\Spdist\BoardOrdm\Canyon LakesGHAMAwwdContract.doc Orifi.Div: Public Works(Special Districts) Contact: Skip Epperly(313-2253) 1 hereby certify that this is a true and correct cc'. County Administrator county Counsel copy of an action taken and entered on the BlackitwkGHADdoWilliantR.Gray mid Co. minutes of the Board of Supervisors on the Envirournerttal Golf,Calabasas,CA date Shown. Blackhawk HOA, a;�i Danville,CA ATTESTED: AUGUST 8, 2000 PHIL BATCHELOR, Clerk of the Board of Su visors a Administrator By® '' + deputy SUPSECT: GRAD CONTRACT AWARD RECOMMENDATION; LANDSLIDE REPAIR PROJECT, HOLE#6, FALLS COURSE, DANVILLE AREA. DATE: AUGUST 8, 2000 PAGE: -2- II Financial Impact: No impact on the County General Fund.The Blackhawk GHAD is funded through revenues generated by County Service Area M-23. The proposed contract is consistent with the anticipated FY 99/00-program budget. III. Reasons for Recommendation and Background: A landslide occurred in the slope adjacent to the sixth fairway on Blackhawk County Club's Lakes Course during the winter on 1998/99. The landslide is within the boundaries of the Blackhawk GHAD. The adopted Plan of Control authorizes repair of the landslide. Funds for the repair were included in the GHAD's approved FY 1998/99 Program Budget. Repair was deferred because of a relatively low priority in comparison with other landslides within the GHAD and due to a planned renovation of the golf course. Renovation of the golf course is now underway. The GHAD completed an analysis of the landslide and identified a repair strategy. Because the selected strategy requires the placement of fill on the fairway of the golf course, the General Manager has been coordinating with the Blackhawk County Club and their contractor, Environmental Golf,Calabasas, California. A project that both economically repairs the landslide (to the satisfaction of the GHAD) and provides a betterment to the golf course has been identified. The GHAD will be responsible for repair the landslide and the Country Club will be responsible for all final grading as well as repair of the golf course irrigation system and replacement of turf damaged during repair of the landslide. The GHAD's Civil Engineering consultant,David Evan Associates of San Ramon, California,has prepared plans for the repair project. DMC Engineering of San Ramon, a consultant to the GHAD,prepared the contract specifications and developed a detailed engineers estimate of the cost. Can June 27, 2000,the Board of Directors waived contract procedures of the Blackhawk GHAD and authorized the General Manager to negotiate a contract for the repair with the Country Club's contractor, Environmental Golf,Inc. of Calabasas,California. The General Manager has successfully negotiated a proposed contract with Environmental Golf and is recommending that the Board of Directors authorize him to award a contract in the amount of$745,321.56 for the work. In addition,the General Manager is recommending that he be authorized to issue contract change orders up to 10%of the proposed contract, as may be required,without further action by the Board. License Agreements providing the CHAD with sufficient rights to enter upon and repair the landslide as well as necessary indemnification are being negotiated and will be executed with the Blackhawk Country Club and the Blackhawk Homeowners Association before work begins on the project. Consequences of Negative Action: The landslide could not be repaired this season and the GHAD, and the cost of repairing the landslide would likely increase significantly because of the need to repair anticipated damage to the golf course which would otherwise be the responsibility of the Blackhawk Country Club. FADATA\CHAD files\HlackhawkWajor Projects\Hole 6_Lakes Course-Blackhawk Country Club\Board of Directors\BO-recommend award of contract.doc