TO EOAR�3 OF S ERVISORS
FROM, J, MICHAEL WA1✓FORD, PUBLIC WORKS DIRECTOR
TEAT . AUGUST 17, 1999
SUBJECT: CONTRACT AWARD RECOMMENDATION:
KENSINGTON PEDESTR:AN FLASHER, PROJECT NO. 0662-6fZ4022-99,
KENSINGTON AREA
SPECIFIC REQUES:(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
Ie
-RECOMMENDED ACTIQNa
AWARD fine contract for furnishinglabor and materials for the subject project to Richard A. Heaps
Electrical Contractor,Inc.,the icer bidder,who has also rnet the requirements of the County's Disadvantaged
Business Enterprise Contract Co-i pliance Program, in the amount of$48,215.00 and at the anit prices
submitted; and REQUITE the contractor to present surety bonds for Payment and Faithful Perforrnance in
the a .ounts of$48,215.00 and 548,2.15.00, respectively,
DIRECT tine Public `forks Director to prepare the contract for the project..
AUTHORIZE the Public Works Director to sign the contract on behalf of the Board subject to the Director
laving reviewed and found sufficient all required documents,including the ccs tract signed by the contractor,
the aforementioned surety bonds, and a certificate of in.surane.
Continued on Attachnientt 2L Yes SIGNATURE.
RECOMMENDATION OF BOARD COMMITTEE
APPROVE —OTHER
SIG1'' 11 RE IS
AC's 90N O BOARD ON ASC ST ��� X99 �'�'RC�vEt3 AS RECC�15�i6�E1� E�X,_OTHER_
VOTE OF SUPERNrtSORS
X JTNANIMOUS(ABSENT
AYES. NOES;
A SETN7T; ABSTAIN-.—
R31
BSTAIN-.R3 ki
G:\GR?DATA\CONS".1\30\1999108-AJG;JST\17-K7-F.TJJ','
Orig.DIM,Public Works(Construction)
Contact; Mike Carlson(925)313-2320 i hereby certify hat Cat this is a true and correct copy of an
CC: County Admin action taken and entered on the minuf s of the Board of
Auditor-Controller
Public Works Supervisors on the date shown.
Accounting,R.Gilc:,rist
-Conspsuction-R.Bruno AUGUST J-7, 1999
Design ATTESTED:
ESTED:
S.B.E.
703 Market St. PHIL BATCHELOR, C al,k of the Board of Supervisors and
San Francisco,CA 94103-1000 County Administrator
Con.rac'or
By s Deputy
SUBJECT; CONTRACT AWARD RECOMMENDATION:
KENSINGTON PEDESTIRAIAN FLASHER,PROJECT NTO.0662-6R4022-99,KENSING-1 ON AREA
BOARD DATE: AUGUST 17, 1999
PAGE 20F2
1. RECQMME' DDD ACTION: (contimied)
AUTHORIZE the Public Works Director to sign any escrow agreernents prepared for this project to permit
thesubstitution of securities for moneys withheld by the County to ensure perform ance under the contract,
pursuant to Section 22300 of the Public Contract Code.
DIRECT that, in accordance with the project specifications and/or upon the -execution of the contract by
the Public Works Director, any bid bonds posted by the bidders be exonerated and any checks or cash
submitted for bid security be returned.
Pursuant to Public Contract Code Section 41114, the Board DELEGATES its functions under Public
Contract Code Sections 4107 and 4110 to the Public Works Director or his designee.
Pursuant to Section 6705 of the Labor Code, the Board also DELEGATES to the Public Works Director
or to any registered civil or structural engineer designated by him the authority to accept detailed plans
showing the design of shoring,bracing, sloping or other provisions to be made for worker protection during
t1rcIrIch excavating covered by that section.
DECLARE that, should the award of the contract to be invalidated for any reason, the Board would not
-o the second listed bidder or any other bidder, but instead would
in any event have awarded the -contract t
have exercised its discretion to-reject all of the bids received. Nothing herein shall prevent the Board from
reawardilng the contract to another bidder in cases where the successful bidder establishes a mistake, -refuses
to sign the contract or fails to Amm;sh required bonds or insurance(see Public Contract Code Sections 5100-
5107).
11 FINANCIAL IMPACT:
The protect,including engineering and appropriate overhead charges, is funded by Hazardous Elimination
I
and Safety(83%) and Local Road Funds (17%).
III RECOMMENDAII_ON/BACKGROUND'
The plans and speciftations were approved and the project advertised for bids by the Board of Supervisors
on june 22, 1999. The bids were received and opened at 255 Glacier Drive, Martinez, California, on July
27, 1999. The construction bids received were as follows:
1. Richard A. Heaps Electrical Contractor, linc. —......................................................$48,215.00
2. Continental Electric— ...... ........... ................--............. .........$48,933.00
3. Mike Brown Electric Co......... ........ ....... ...-..... ............—...... ........ .......$54,668.00
4. gown & Feslerinc. ..............................................................................................$66,490.00
The Engineer's estimated construction cost was $30,000,00.
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: AUGUST 17, 1 gg
SUBJECT: APPROVE CONTRACT CHANGE ORDER NO.2 FOR THE ARTHUR ROAD WIDENING
PROJECT, PROJECT € O. 0662-6R4162-99, MARTINEZ AREA
1, Recommended Aeflo :
APPROVE Contract Charge Order No. 2 in the approximate amount of $16,000.00 and
X 7HORIZE the Public Works Director to execute it in order to compensate the contractor, Carone
and Sons, Inc. for utility line potholing on both sides of Arthur Road,
Its Financial j act:
T ero#eot contingency funds are sufficient to cover the change order costs. The ourceof funds
is oieno Way Closure Mitigation Fund (100%).
continued on attar r?ant: �x yes SIGNATURE:
RECOMMENDATION of COUNTY ADIMIMSTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
iGNAT€ `:
AC`�I�i� Off: BOAKU UM Ai-I-mopv'L�3 AO M �UMMu 0T im��
VOTE OF SUPERVISORS i hereby certify that this is a true and correct copy of an action
A mro (ABSENT
T®�} taken and entered on the minutes of the Board of Supervisors
AYES: NOES: on the date shown.
ABSENT: � ABSTAIN:
Contact: Mike Carlson, (925)313-2320 ATTESTED: AUGUIST 17, 1999
PHIL BATCHELOR, Aeric of the Board of Supemlisors and
Orig. DIS.: W(Contrr) County Administrator
cc: County Administrator
E p A
Auditor-Controller
By % - 9 Deputy
Public Works
- Accoun'ing, R. G6;ichrist
Construction. R. Bruno
- Design
Contractor
RB:kj
G AGPPDATA=%,'8nB0\1999108-AUGUST\17-ARW-GC0.0QC
SUBJECT": ARTHUR ROAD WDENING PROJECT
PROJ. NO. 4662-684162-99, MAS o(NE-Z AREA
DATEAUGUST 17, 1999
PAGE: 2 OF 2
The total of Contract Change Order No. 2 is greater than 10% of the original contract, thereby
requiring Board approval.
Without approval, the contractor will not receive payment for work done under Contract Charge
Order No. 2.
TO: BOARD OF SUPEE RVISOR
S
FROW J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: AUGUST 17, 1999
SUBJECT: REJECT BIDS RECEIVED ON JULY 13, 1999 FOR THE DELTA ROAD BRIDGE
REPLACEME:NT PROJECT, PROJECT NO. 0662-684216-95. KNIGHT EN AREA
1. _Recommended Acflon:
REJECT all bids received on July 13, 1999 for the Delta Road Bridge Replacement Project and,
DIRECT that any bid bonds posted by the bidders are to be exonerated and any checks or cash
submitted for security shall be returned.
11, FinanLclal Impa .
None.
Continued on Attachrnent,,. X SIGNATURE:
OR
RECOMMENDATION OF BOARD COMMITTEE
—APPROVE —OTHER
SIGNATURE(S):
ION OF BOARD ON AUGUST 17, 999 APPROV OMMENDED_X_OTHER
VOTE OF SUPERViSORS
_X_ LiNANiM0US (ABSENT___)
AYES: -- NOES;—
ABSENT:—ABSTAIN--
RB:kj
GA_'rPData\C0r1St1,80\1 GM08-Augusftl 7-DRSRreject.doc I hereby cert;fy that this is a true and correct copy of an
Contact: Mike Cadson, (925)313-2320 action taken and entered on 'he minutes of the Board of
Orig. Div: Public Works (Cons ruction Division) supervisors on the date shown.
CC' County Admin- EE. Kusvor
Auditor-Controlier ATTESTED: AU(TUST 17, 1999
Pw: Accounting PHILBATCH�--' OR, Clerk of the Board of Supervisors and
Construction-R. Bruno
Design County Administrator
Project Bidders-via PL;b';ic Works
By Deputy
C-
REJECT BOARD ORDER FOR
Delta Road Bridge Replacement Project,
Prof, No.: 0662-6R4216-95, Knightsen Area
BOARD DATE., August 17, 1999
111 Reasons for Recommendations and
Rejection of all bids is in the County's best interest, and the Public Works Department
recommends that all bids be rejected. Pursuant to Public Contract Code Section 20393, as well
as the Notice to Contractors, the Board in its discretion may reject all bids.
IV. Consef
uencAg _Negative Action:
-q_ _q
None.
C'4
TO. BOARD OF SUPERVISORS
FROM, J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: AUGUST 17, 4;999
SUBJECT: AMENDMENT NO. 2 TO THE CONSULTING SERVICES AGREE::MEN-71 WITH NOLTE
ASSOCIATES, INC. FOR THE CANO TASSAJARA ROAD REALIGNMENT
PROJECT, PROJECT NO. 0662-6R4185497, TASSAJARA AREA
1, Recommended Action:
APPROVE and AUTHORIZE: the Public Works Director to execute Annendment No. 2 to the
Consulting Services Agreement with Nolte Associates, Inc. for the Camino Tassajara Road
Realignment Project, in the Tassajara area.
If. Financlajjnpact-
There will be no impact to the County General Fund, The $129500,00increase viii be funded by
the Tassajara AOB (100%)
Confinued on attachment: X yes SIGNATURE:
RECOMMENDATION OF (;UUN I Y AUMINR5 I,-,A�UN
RECOMMENDATION OF BOARD COMfid-17`SEE
APPROVE OTHER
SIGNA'r 4 R ° l:
A 6 ^ B ARt3 -c z 9 APPROVED AS RECOMMENDED– OTHER—
VOTE OF SUPERVISORS
X UNIANIMOUS (ABSENT__)
AYES: NOES:
ABSENT: ABSTAIN:
Contact: Mike Carison, (925)313-2321 1 hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the board of
Orig. Dive: PW o n s t r) Supervisors or.the date shown.
cc: County Administrator
AuditomController
PubIic Works ATTESTED: 9
AUGUST 17, 199
- Accounting, R. Giichnst PHIL BATCHELOR, Clerk of the Board ofSupervisors and
- Construction, R. Bruno County Administrator
- Desigr,
Contractor By Deputy
G:11sRPOATA\CONS'RBQ11995108-AUGUSnl,7-,';-,RR(0SA-AD2)D0C
SUBJECT: APPROVE AMENDMENT O. 2 TO CONSULT;;NG SER` CES AGREEMENT WITH N ?LTE ASSOCIATES,
INC. FOR CAMINO TASEAI;I,SRA ROAD REALIGNMENT PROJECT
DATE: August 17, 1999
PAGE: 2 of 2
round*
The Board of Supervisors on June 15, 1999 authorized the Public Works Director to execute a
Consulting Services Agreement with Nolte Associates, Inc. to provide construction management
support for the Camino Tassajara Road Realignment Project.
The current agreement provides Resident Engineering services for 45 working days or 360 working
hours, whichever occurred first. Due to the contractors current schedule, and delays caused by
the utility companies, the 360 working hours have been exceeded.
IV.
If the Consultant Services Agreement with Nolte Associates, Inc. is not approved, it may result in
the consultant not being paid for sem4ces rendered.
BOARD OF SUPERVISORS C.6
FROM: J. MICHAEL. WALFORD, PUBLIC WORKS DIRECTOR
DATE: August 17, 1999
SUBJECT- Approve Consulting Services Agreement with Terrasearch Inc. for Geotechnical
Se ice on the Christie Road Slide Repair Project, in the Rodeo area.
Project No,: 0672-686351-98
ROUND AND JUS`r?.MAa ION
L HECO1qMENQEQ_AQT1QW
APPROVE and AUTHORIZE the Public Works Director, or his designee, to execute a
contract with Terrasearch, Inc. to provide geotechnical services for the Christie Road Slide
Repair Project in the Rodeo Area.
If. EINANCIAL IMPACT-
The estimated contract cost is $18,750.00 funded by FEMA (75%); $6,250 funded by Road
Funds (25%).
Continued on Attachment: X SIGNATURE,
RECOMMENDATION OF BOARD COMMITTEE
—APPROVE —OTHER
SIGNATURE(S),
ACTION OF BOARD ON A-wuST 17, 1999 APPROVED AS RECOMMENDED X OTHER—
VOTE OF SUPERVISORS
UNANWOUS (ABSEN"'F
AYES. NOES,_ F
ABSENT: ABSTAIN--
i horleby cert;y that fMs Is a true -and correct
JMW:!P:gpp copy of an act ori taker, and entered on arts\\PV�iW-,NSHARDATANGrpDe,a\DesiV-\Board Orders rni'nutas of the and of Supervisors on the
BO I 999\Chrmt; is Road Slide Repair Project 8-17.doc
orig. Div: PuUic Works (Design Division) date showt'l. �L
AUGUST '17, "999
Contact,. Joubin Pa pour(313-2299) A7TESTED: —
to c;, CAO
CC.,
PHIL BATCHELOR, Gerk of the and
E. al au-emsors and County Adnnin,strator
Aud'Itor-Controller
Core munity Desi oprnent By Deputy
PW AccoLnting
Construction
SUBJECT. Approve Consulting Services Agreement with Terrasearch Inc. for Geotechnical
Consultation on the Christie Road Slide Repair Project in Rodeo Area,
Project No.: 0672-6R6351-98
DATE: August 17, 1999
PAGE 2
1IL Reasons for Recommendations and BgqkqrotLnd.,
The damage to Christie Road occurred in the winter of 1998, This project consists of two
separated slip outs. The road will be relocated away from the most easterly of the two slip outs,
therefor avoiding any or in the creek area. The second slip out will be stabilized using the
recommendation of the geotechnical engineer.
IV, Consequences of Native Action:
If the Consulting Services Agreement with Terrasearch Inc. is not approved, the project can not
be completed and may result in road closure.