Loading...
HomeMy WebLinkAboutMINUTES - 08051997 - C106 TO: BOARD OF SUPERVISORS " FROM: PHIL BATCHELOR,COUNTY ADMINISTRATOR DATE: SUBJECT: APPROVING AND AUTHORIZING THE ISSUANCE OF A CHANGE ORDER TO THE CONTRACT FOR BID PACKAGE NO. 4-DATA/TELECOMMUNICATION CABLING FOR THE NEW HOSPITAL, 2500 ALHAMBRA AVENUE,MARTINEZ(WH580B) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE the issuance of Change Order No. 3 to the Contract dated November 19, 1996 issued to Comtel Systems Technology,Inc. for the cable,outlets,devices for the voice/data communication cabling distribution system for the new hospital at 2500 Alhambra Avenue, Martinez, and AUTHORIZE the County Administrator or his designee to execute the Change Order. II. FINANCIAL IMPACT Change Order No. 3 totals$34,500.00. Funds in the capital account established for the project are sufficient to cover the amount encumbered by this contract, from bond proceeds specified to the project. Bond financing for the total project cost was secured in May, 1992 in accordance with the Board of Supervisors' direction. CONTINUED ON ATTACHMENT: X YES SIGNATURE: G�, RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): Q ACTION OF BOARD ON " .5 1997 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN UNANIMOUS(ABSENT ) AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. AYES: NOES: ABSENT: ABSTAIN: nn c� ry ATTESTED l�l�q�t4 J�► 9 -1 1 PHIL BATCH OR,CLERK efF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR CONTACT: D.Bell,CAO CC: Auditor/Controller BY DEPUTY GSD(Accounting) O'Brien-Kreitzberg(via CAO) Contractor(Via CAO) Page I of 2 Board Order to Approve Issuance of a Change Order for Merrithew Memorial Hospital Replacement Project Bid Package No.4 III. REASONS FOR RECOMMENDATIONS Change Order No. 3 will provide for the following: Proposed Change Order No. 11 -900 pair telephone service to lower Hospital campus $34,500.00 Per current plan, the new hospital will receive a primary telephone feed. In order to provide connectivity to the lower campus, a 900 pair telephone cable needs to be installed to the existing lower campus telephone closet. In addition, the Owner requested that fiber connectivity be provided to the same location. The scope of this exterior work is beyond the original scope of the contract. It was deemed prudent and desirable to have the current cabling contractor perform this added work in order to maintain a single point of contact for cable warranty issues and leverage existing crew and contract mobilization. Due to procurement and installation issues, the contract completion date has extended from June 2 to August 15, 1997. An excusable, non-compensable time extension is granted by issuance of this change order. By this agreement, the contractor will not pursue extended overhead costs, and conversely, the owner will not pursue contract time provisions. The new guaranteed maximum cost will exceed the total estimated cost stated in the construction contract agreement approved by the Board on November 19, 1996. The new guaranteed maximum cost will total$540,975.00. Page 2 of 2