Loading...
HomeMy WebLinkAboutMINUTES - 08121997 - C87 u (T7 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: AUGUST 5, 1997 SUBJECT: Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep, Bay Point Project No.: 4500-6G5094-96 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 1996, pursuant to Public Contract Code Sections 22035 and 22050, to repair the "Hill 310" Land Creep, Bay Point. II. Financial Impact: Total cost of repairs cannot be fully determined at this time, but staff is developing an estimate for completion of the repair. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR ~_RECOMMENDATION OF BOARD COMMITTEE —APPROVE —OTHER SIGNATURE (S): ACTION OF BOARD ON 8- 1-4-- ►997 APPROVED AS RECOMMENDED OTHER_ I hereby coy*that this is a true and correct"pY of In action taken and entered on the minutes Ot-� Board of Supenv;ors on the data shown. 49MEsTi:�: n. . ..--+ I a. 12 7 PHIL BATC WOR,clerk eft a lwar0 of Supervisors and County Administrator VOTE OF SUPERVISORS UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: JPM:tt G:\CONST\80\H3R-5.T8 Orig.Div: Public Works(Construction) Contact: Joseph P.Murphy(313-2320) cc: CAO Auditor/Controller County Counsel GMEDA Design Div. Construction Div.-R.Bruno (Original to project Tile) -Copy to Hill 310 Landcreep Repair file Maintenance Div. Contractor � C �7 Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310"Land Creep August 5, 1997 Page Two III. Reasons for Recommendations and Background: A. On February 26, 1996, Public Works and Building Inspection were notified that cracks were occurring in Beaulieu Court. The County hired a geotechnical firm to identify the cause of the slide, and recommend and direct remedial actions to mitigate land movement. B. On March 19, 1996, the Board of Supervisors concurred in the County Administrator's proclamation of a local emergency. C. On June 4, 1996, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the area subject to creep. D. Repair status: Work on the Hill 310 Road Reconstruction Project began on June 23, 1997, and is proceeding on schedule. The estimated date of completion is August 8, 1997. Subsequent to this project, Consolidated Landscape Services was awarded the Hill 310 Landscape Project with a low bid of $58,900.00. This work should begin in August and take four weeks to complete. IV. Consequences of Negative Action: This project is part of a series of sequential construction projects that will stabilize the landslide and restore the streets and sidewalks of the affected neighborhood. A negative action would stop this process.