Loading...
HomeMy WebLinkAboutMINUTES - 09101996 - C34 G TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: SEPTEMBER 10, 1996 SUBJECT: APPROVE DETAILED PROGRAM BUDGET FOR FISCAL YEAR 1996-1997, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT, DANVILLE AREA. PROJECT NO.: 4500-6X5147. Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: APPROVE and ADOPT the Detailed Program Budget expanding upon the County Line Item Budget for Fiscal Year 1996-1997 as shown on Attachment "A". II. Financial Impact: None. III. Reasons for Recommendations and Background: The total income budget for the coming fiscal year (FY `96-97) is projected at $867,000. Projected expenses are approximately $811,375. This is estimated to result in a capital reserve of approximately $100,000 to be added to the "reserve" account to protect against future major repair expenses. Anticipated projects this year include several slope grading and revegetation jobs (to protect against future soil erosion) and the repair and maintenance of existing slopes and drainage facilities. The remainder of the expense budget is allocated to on-going maintenance programs and miscellaneous repairs throughout the Blackhawk area. IV. Consequences of Negative Action: Cannot approve Fiscal Year 1996-97 bills. Continued on attachment: X Yes SIGNATURE: I - RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: September 10, 1996 APPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: SE:cs g:\Eng5vc\SpDist\BO\BH GHAD 10.19 t hereby that thte Is afire and correct Dopy of an actlon taken and entered on the minutea of the Contact: Skip Epperly,(510)313-2253 Roam et on the date showm. Orig. Div.: PW(Special Districts) ATTESm. 0 6 cc: Auditor-Controller Ptt1L EL.Op,Clark of hoard Accounting d SgWvb fe and Gwdy AdmWalrator BYY ATTACHMENT IIA" BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT PROPOSED BUDGET FY '96-'97 July 15, 1996 PROPOSED BUDGET EXPENSES BUDGET FY 7/95-6/96 FY 7/95-6/96 FY 7/96-B/97 A. PROJECTED INCOME ' 1. Annual Revenue Via CSA M-23 $780,000.00 $867,000.00 is 2. Estimated Interest Earnings $90,000.00 $100,000.00 r TOTAL INCOME $870,000.00 $967,000.00 B. PROJECTED EXPENSES 1. Construction Costs a. Repair,Maintenance&Improvements(as per approved $411,500.00 $402,171.42 $487,000.00 Repair,Maintenance&Improvement Program) b. Construction Supervision District Staff * $100,000.00 $88,028.00 $89,125 C. District Administration District Staff $35,000.00 $21,785.00 $18,750 2. Soils and Geotechnical Costs a. District Staff $20,000.00 $23,709.00 $15,000 b. Outside Consulting $75,500.00 $76,048.91 $40,000 3. Civil Engineering Costs $100,000.00 $120,703.56 $35,000 4. Groundwater&Settlement Monitoring Programs $0.00 $0.00 $30,000 5. Legal Costs a. District Staff ' $40,000.00 $23,674.00 $17,700 b. Outside Consulting and Representation $28,000.00 $37,257.47 $25,000 6. Accounting Costs District Staff $40,000.00 $43,628.00 $37,500 t 7. Miscellaneous Administrative Costs (HOA, FEMA, PR,etc.) District Staff $10,000.00 $12,764.50 $6,300 wy. 8. County Staff Service Costs $10,000.00 $0.00 $10,000 TOTAL EXPENSES $870,000.00 $849,769.86 $811,375.00 C. ADDITIONAL CONTRIBUTION TO RESERVE" $0.00 $20,230.14 $155,625.00 TOTAL BUDGET $870,000.00 $870,000.00 $967,000.00 } PROPOSED 4; DISTRICT STAFF SUMMARY BUDGET v. General Manager $39,375.00 #° District Geologist $35,000.00 ±' Construction Administrator $69,575.00 District Coordinator $40,425.00 $184,375.00 ** Not including GHAD reserve savings account. BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT CONSTRUCTION COSTS FY 195/196 - Year End Totals FY 196/197 - Estimated Budget Budget Expenses Est. Budget Category (195/'96) (July-June) ('96/197) Slope Stabilization 1. Emergency Responsc N/A' N/A 10,()()0.00 2. Correctivc Grading 128,000.00 166,949.61 150,(XX).()0 3. Retaining/Pin Walls 35,000.00 17,039.84 50,000.00 4. Slope Erosion Protection 20,000.00 49,496.15 15,000.00 5. Revegctation 10,000.00 6,207.30 10,000.00 6. Monitoring Devices NIA N/A 30,000.00 Surface Drainage 7. B-58 Construction 26,000.00 9,944.92 15,000.00 8. 8-58 R and M 19,000.0 19,152.42 20,000.00 9. Storm Drain Construction N/A N/A 10,000.00 10. Storm Drains R and M 33,500.00 27,007.16 25,000A) 11. Ero%iun/Runoff Control 45,(0().00 6,801.42 25,000.00 12. Riparian Features R and M N/A N/A 40,000.00 Subsurface Drainage 13. Subdrain Construction N/A N/A 12,000.00 14. Subdrains R and M 17,000.00 7,461.27 10,000.00 15. Horiz. Drain Drilling 60,000.(X) 47,120.64 40,000.00 16. Horir. Drains R and M 11,000.0() 1,669.34 10,000.00 17. Other Construction Projects 7.000.00 43.321.35 15900 TOTAL $ 411,500.00 $ 402,171.42 $ 487,000.00