Loading...
HomeMy WebLinkAboutMINUTES - 09101996 - C33 TO: BOARD OF SUPERVISORS G FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: SEPTEMBER 10, 1996 SUBJECT: ACCEPT THE STATUS AND EXPENSE REPORT THROUGH THE FOURTH QUARTER AND YEAR END OF FISCAL YEAR 1995-96, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT, SAN RAMON AREA. PROJECT NO. : 4500-6X5148 Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: ACCEPT the Canyon Lakes Geologic Hazard Abatement District (GHAD) Status and Expense Report for the fourth quarter and year end of Fiscal Year 1995-1996. II. Financial Impact: There will be no impact to the County General Fund. III. Reasons for Recommendations and Background: During the fourth quarter, the District continued the work in storm drainage maintenance and construction. The construction costs through the year end ($51,381.00) are approximately 36% of the annual construction budget, and total expenses through this quarter ($196,328.00) were approximately 65% of out total annual budget. IV. Consequences of Negative Action: The quarterly report will not be accepted as required by original formation of the GHAD. Continued on attachment: Yes SIGNATURE:/ V" RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON:September 10, 1996 APPROVED AS RECOMMENDED X OTHER VOJE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: SE:pe g:\EngSvc\SpDist\BO\CLGHAD 20.t8 I frentby cefgy 00 thte Is a true and con-era copy or Contact: Skip Epperly,(510)313-2253 an actton taken and entered on the mminutea of ft Orig.Div.: PW(Special Districts) Board of pmt mt !er' , 1996 cc: Auditor-Controller ATTESTED Accounting 1*14I1.t3ATCNELOR.Clerk of the board D.Nystrom,Nystrom Engineering of Bupwvbw and GWMW AdMWM1cr By OePIY -� CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT o3 BUDGET REPORT FY '95-'96 July 15,1996 ACTUAL BUDGET EXPENSES FYJULY'95-JUNE '96 FYJULY'95-,LUNE '96 A. BALANCE OF RESERVE BROUGHT FORWARD $629,000.00 B. PROJECTED INCOME 1. Annual Revenue Via Assessments: $300,000.00 743 Single Family Detatched 469 Townhouses 2,576 Condominiums/Rentals 100,000 Sq. Ft. Commercial 2. Estimated Interest Earnings $30.000.00 TOTAL INCOME $330,000.00 C. PROJECTED EXPENSES 1. Construction Costs a. Repair,Maintenance&Improvements(as per approved $143,000.00 $51,381.02 Repair,Maintenance&Improvement Program) b. Construction Supervision District Staff $41,000.00 $41,538.00 c. Contract Administration District Staff $22,000.00 $10,544.00 2. Professional Soils and Geotechnical Costs a. District Staff " $15,000.00 $18,880.00 b. Outside Consulting $16,000.00 $27,335.46 3. Professional Civil Engineering Costs $15,000.00 $1,657.00 $0.00 4. Legal Costs a. District Staff ' $0.00 $530.00 b. Outside Consulting $5,000.00 $875.73 5. Accounting Costs District Staff " $15,000.00 $25,722.00 6. Miscellaneous Administrative Costs (HOA,FEMA,PR,etc.) District Staff $10,000.00 $10,655.00 7. County Staff Service Costs $8,000.00 $0.00 8. Assessment District Engineering $10.000.00 $7,210-00 District Staff " TOTAL EXPENSES $300,000.00 $196,328.21 D. ADDITIONAL CONTRIBUTION TO RESERVE $30,000.00 $133.671.79 TOTAL BUDGET $330,000.00 $330,000.00 ' DISTRICT STAFF SUMMARY BUDGET EXPENSES General Manager $15,000.00 $21,600.00 District Geologist $60,000.00 $55,305.50 Construction Administrator $28.000.00 $30.962.00 $103,000.00 $107,867.50 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS 1995-1996 FISCAL YEAR - YEAR END Est. Budget Actual Cost Category (FY'95/196) (July-June) Slope Stabilization 1. Corrective Grading 15,000.00 16,353.52 2. Revegetation 5,000.00 561.30 3. Slope Erosion Protection 15,000.00 0.00 4. Retaining or Pin Walls 8,000.00 11,545.82 Surface Drainage Improvements 5. Maint. B-58 Drain Syst. 8,500.00 420.00 6. Const. B-58 Drain. Syst. 5,000.00 1,206.79 7. Storm Drain Maintenance 5,000.00 5,558.23 8. Erosion/Runoff Cont. Devices 8,000.00 2,297.43 Subsurface Drainage 9. Subdrain Insp. and Maint. 8,500.00 0.00 10. Horiz. Drain Insp. and Maint. 21,000.00 2,210.87 11. Drilling Horiz. Drains 25,000.00 0.00 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 10,000.00 0.00 13. Other Construction Projects 9.000.00 11,227.06 TOTAL $ 143,000.00 $ 51,381.02 36%