Loading...
HomeMy WebLinkAboutMINUTES - 09101996 - C32 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: SEPTEMBER 10, 1996 SUBJECT: ACCEPT THE STATUS AND EXPENSE REPORT THROUGH THE FOURTH QUARTER AND YEAR END OF FISCAL YEAR 1995-96, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT, DANVILLE AREA. PROJECT NO. : 4500-6X5147 Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: ACCEPT the Blackhawk Geologic Hazard Abatement District (GHAD) Status and Expense Report for the fourth quarter and year end of Fiscal Year 1995-1996. H. Financial Impact: There will be no impact to the County General Fund. III. Reasons for Recommendations and Background: The GHAD was "inundated" by about a dozen landslides that needed repair during February and March this year. Three slides were threatening homes and several others also needed emergency attention. The budget for construction repairs was exceeded this year. The Board approved an intra-budget adjustment in the third quarter. A minimum of construction work was done in the fourth quarter resulting in total annual costs coming in under adjusted budget. There were additional costs in completing outside engineering consultation to design the slide repairs as well as design work for other potential landslides. The total cost through this quarter and year end ($849,770) are approximately 98% of the total annual adjusted budget. IV. Consequences of Negative Action: The quarterly report will not be accepted as required by original formation of the GRAD. Continued on attachment: Yes SIGNATURE:zv RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: September 10, 1996 APPROVED AS RECOMMENDED X OTHER V�TE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: SE:pe g:\EngSvc\SpDist\BO\BH GHAD 20.t8 Contact: Skip Epperly,(510)313-2253 f h�� •true oolreet Orig.Div.: PW(Special Districts) en actlai EUten atM enDered on tfie mkiupst o1 oft cc: Auditor-Controller Board of Supervleaae on ere date mown. Accounting ATTESTED. September 10, 1996 D. Nystrom,Nystrom Engineering PHIL BATCHELOR Cbrk of ft boaW of BupWAMN and Gt Wj Adnunbb W i By DP, c3� BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT BUDGET REPORT FY '95-'96 July 15, 1996 BUDGET EXPENSES FYJULY'95-JUNE'96 FYJULY'95-JUNE'96 A. PROJECTED INCOME 1. Annual Revenue Via CSA M-23 $780,000.00 2. Estimated Interest Earnings $90,000.00 TOTAL INCOME: $870,000.00 B. PROJECTED EXPENSES 1. Construction Costs a. Repair,Maintenance&Improvements(as per approved $411,500.00 $402,171.42 Repair,Maintenance&Improvement Program) b. Construction Supervision District Staff $100,000.00 $88,028.00 c. Contract Administration District Staff ' $35,000.00 $21,785.00 2. Professional Soils and Geotechnical Costs a. District Staff $20,000.00 $23,709.00 b. Outside Consulting $75,500.00 $76,048.91 3. Professional Civil Engineering Costs $100,000.00 $120,703.56 4. Legal Costs a. Outside Consulting and Representation $40,000.00 $37,257.47 b. District Staff $28,000.00 $23,674.00 5. Accounting Costs District Staff $40,000.00 $43,628.00 6. Miscellaneous Administrative Costs (HOA,FEMA,PR,etc.) District Staff $10,000.00 $12,764.50 7. County Staff Service Costs $10.000.00 $0.00 TOTAL EXPENSES $870,000.00 $849,769.86 Reserve " $0.00 $20,230.14 TOTAL BUDGET $870,000.00 $870,000.00 ' DISTRICT STAFF SUMMARY BUDGET EXPENSES General Manager $76,000.00 $68,425.00 District Geologist $87,000.00 $81,366.50 Construction Administrator $70,000.00 $63,797.00 $233,000.00 $213,588.50 " Not including GHAD reserve savings account. -Jul.:' 16-96 12 : 52A Sands Construction, Inc. 510-283-1974 P .04 G BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS 1995-1996 FISCAL, YEAR - YEAR END fteVISSID Est. Budget Actual Cost Category (FY'95/'96) (July-June) Slope Stabilization 1. Corrective Grading $ 128,000.00 $ 166,949.61 2. Rcvegetation 10,000.00 6,207.30 3. Slope Erosion Protection 20,000.00 49,496.15 4. Retaining or Pin Walls 35,000.00 17,039.84 Surface Drainage Improvements S. Maint. B-58 Drain Syst. 19,000.00 19,152.42 6. Const. B-58 Drain. Syst. 26,000.00 9,944.92 7. Storm Drain Maintcnanc;e 21,000.00 27,007.16 8. Erosion/Runoff Cont. Devices 45,000.00 6,801.42 Subsurface Drainage 9. Subdrain Insp. and Maint. 17,000.00 7,461.27 10. Horiz. Drain Insp. and Maint. 11,000.00 1,669.34 1.1. Drilling Horiz. Drains 60,000.00 47,120.64 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 12,500.00 0.00 13. Other Construction Projects 7.000.00 43.321.35 TOTAL $ 411,500.00 $ 402,171.42 98%