Loading...
HomeMy WebLinkAboutMINUTES - 09101996 - C142 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: September 10, 1996 SUBJECT: Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep, Bay Point Project No.: 4500-6G5094 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 1996 pursuant to Public Contract Code Sections 22035 and 22050, to repair the "Hill 310" Land Creep, Bay Point. II. Financial lmpact: Total cost of repairs cannot be fully determined at this time, but staff is developing an estimate for completion of the repair. III. Reasons for Recommendations and Background: A. On February 26, 1996, Public Works and Building Inspection were notified that cracks were occurring in Beaulieu Court. The County hired a geotechnical firm to identify the cause of the slide, and recommend and direct remedial actions to mitigate land movement. B. On March 19, 1996 the Board of Supervisors concurred in the County Administrator's proclamation of a local emergency. C., June 4, 1996 the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the area subject to creep. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE _OTHER SIGNATURE(S): ACTION OF BOARD ON September 10, 1996 APPROVED AS RECOMMENDED x OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT ------------ ) AYES: NOES: ABSENT: ABSTAIN: MLH:drg g\desig n:BO:bosept 10.t9 1 hereby certify that this is a true and correct copy of Orig.Div: Public Works(Design) an action taken and entered on the minutes of the Contact: Pattie McNamee(313-2303) Board of Supervisors on the date shown. cc: CAO A -in- iqqfi Auditor/Controller 811TCME d f Boa o' County Counsel i b GMEDA Design Div. Construction Div. Maintenance Div, Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep September 10, 1996 Page Two III. Reasons for Recommendations and Background (cont'd): D. Repair status: 1. Plans and specifications for the first phase of the repair, an earth buttress, were completed on July 31. Bids were received on August 13, and a contract, in the amount of$638,525, was awarded to the low bidder, Ford Construction Company, Inc. Work began on September 3, and is expected to be completed by mid-November. 2. Geotechnical consultants and civil engineers are preparing a design for a drainage gallery, the second phase of the repair. Work on this project will start in late September. 3. Utilities have been relocated to accommodate construction of the earth buttress repair. A permanent sanitary sewer system has been reconstructed and is now functioning. 4. County staff has obtained all necessary regulatory agencies approvals and permits. 5. Staff expects to complete acquisition of the last three properties on Sandy Cove Lane in October. Staff is continuing to negotiate for right of way needed for construction of the drainage gallery. IV. Consequences of Negative Action: Repair work would not be completed before next winter.