THE BOARD OF SUPERVISORS
CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order of September 10, 1996 by the following vote:
AYES: Supervisors Rogers, Bishop, DeSaulnier, Torlakson, Smith
NOES: None
ABSENT: None
RESOLUTION NO. 96/393
SUBJECT: Approving Plans and Specifications for
Security Fence Repair at West'County Detention Facility
5555 Giant Highway, Richmond
(CP#96-6)
Authorization No. WPE618
WHEREAS plans and specifications for Security Fence Repair at West County Detention
Facility, 5555 Giant Highway, Richmond, have been filed with the Board this day by the Director
of General Services; and
WHEREAS plans and specifications were prepared by Ricardo Sitjar& Associates; and
WHEREAS the cost estimate for the initial construction contract is $63,000.00; and
WHEREAS the Board has obtained the general prevailing rates of wages, which shall be the
minimum rates paid on this project; and
WHEREAS the Board hereby finds that the project is exempt from Environmental Impact
Report requirements as a Class Id Categorical Exemption under County Guidelines and directs
the Director of Community Development to file a Notice of Exemption with the County Clerk;
IT IS BY THE BOARD RESOLVED that said plans and specifications are hereby
APPROVED. Bids for this work will be received on October 10, 1996 at 2:00 p.m., and the
Clerk of this Board is directed to publish a Notice to Contractors in accordance with Section
22037 of the Public Contract Code, inviting bids for said work, said Notice to be published in
West County Times . The Director of General Services is
directed to mail notices to the construction trade journals specified in Section 22036 of the Public
Contract Code at least 30 days before the date of opening the bids; and
IT IS FURTHER RESOLVED that the Director of General Services, or his designee, is
AUTHORIZED to issue bid Addenda, as needed, for clarification of the contract bid documents,
provided the involved changes do not significantly increase the cost estimate for the initial
construction contract. .
I teeey cel►met mte m s 90 and tensa py of
•n�erd�of guperrviso s an tl dM9 shown-
.j.
own�utes°oi m.
�rrEsrtro 9�
ofsup
IMIL apo yMAR w�Ad�rlW&W
r �A /I/iAYOJ /�11X D/l�t�
Orig. Dept.: General Services Dept. - Architectural Division
cc: General Services Department
Architectural Division
G.S. Accounting
File: 135-9527/A.5
Auditor-Controller
Community Development
Dennis Barry
Consultant (Via A.D.)
Sheriff-Coroner(Via A.D.)
112750 MMM
GRIs