Loading...
HomeMy WebLinkAboutMINUTES - 09101996 - C135 � f , /,36` File: 135-9527B.4.1 THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order of September 10, 1996 by the following vote: AYES: Supervisors Rogers, Bishop, DeSaulnier, Torlakson, Smith NOES: None ABSENT: None RESOLUTION NO. 96/393 SUBJECT: Approving Plans and Specifications for Security Fence Repair at West'County Detention Facility 5555 Giant Highway, Richmond (CP#96-6) Authorization No. WPE618 WHEREAS plans and specifications for Security Fence Repair at West County Detention Facility, 5555 Giant Highway, Richmond, have been filed with the Board this day by the Director of General Services; and WHEREAS plans and specifications were prepared by Ricardo Sitjar& Associates; and WHEREAS the cost estimate for the initial construction contract is $63,000.00; and WHEREAS the Board has obtained the general prevailing rates of wages, which shall be the minimum rates paid on this project; and WHEREAS the Board hereby finds that the project is exempt from Environmental Impact Report requirements as a Class Id Categorical Exemption under County Guidelines and directs the Director of Community Development to file a Notice of Exemption with the County Clerk; IT IS BY THE BOARD RESOLVED that said plans and specifications are hereby APPROVED. Bids for this work will be received on October 10, 1996 at 2:00 p.m., and the Clerk of this Board is directed to publish a Notice to Contractors in accordance with Section 22037 of the Public Contract Code, inviting bids for said work, said Notice to be published in West County Times . The Director of General Services is directed to mail notices to the construction trade journals specified in Section 22036 of the Public Contract Code at least 30 days before the date of opening the bids; and IT IS FURTHER RESOLVED that the Director of General Services, or his designee, is AUTHORIZED to issue bid Addenda, as needed, for clarification of the contract bid documents, provided the involved changes do not significantly increase the cost estimate for the initial construction contract. . I teeey cel►met mte m s 90 and tensa py of •n�erd�of guperrviso s an tl dM9 shown- .j. own�utes°oi m. �rrEsrtro 9� ofsup IMIL apo yMAR w�Ad�rlW&W r �A /I/iAYOJ /�11X D/l�t� Orig. Dept.: General Services Dept. - Architectural Division cc: General Services Department Architectural Division G.S. Accounting File: 135-9527/A.5 Auditor-Controller Community Development Dennis Barry Consultant (Via A.D.) Sheriff-Coroner(Via A.D.) 112750 MMM GRIs