Loading...
HomeMy WebLinkAboutMINUTES - 08061996 - C80A C.80 A THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY CALIFORNIA Adopted this Order on August 6, 1996 by the following vote: AYES: Supervisors Rogers, Bishop, DeSaulnier, Torlakson, Smith NOES: None ABSENT: None ABSTAIN: None ----------------------------------------------------------------- ----------------------------------------------------------------- SUBJECT: DETERMINE the Need to Continue the Emergency Action Regarding the Repair of "Hill 310" Land Creep, Bay Point. While considering the item C.80 on this date, Supervisor Rogers requested that the County Administrator report to the Board of Supervisors on the inclusion of this type of matter in a possible policy on matters that could be handled administratively. IT IS BY THE BOARD ORDERED that the County Administrator is REQUESTED to include this type of matter in the report to the Board of Supervisors relative to a possible policy on matters that could be handled administratively. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: August 6. 1996 PHIL BATCHELOR, Clerk of the Board of Supervisors and County Administrator r- By ,Deputy cc: CAO C YO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: AUGUST 6, 1996 SUBJECT: Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep, Bay Point Project No.: 4401-6G5094 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION 1. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 1996 pursuant to Public Contract Code Sections 22035 and 22050, to repair the "Hill 310" Land Creep, Bay Point. II. Financial lmpact: Total cost of repairs cannot be fully determined at this time, but staff is developing an estimate for completion of the repair. III. Reasons for Recommendations and Backaround: A. On February 26, 1996, Public Works and Building Inspection were notified that cracks were occurring in Beaulieu Court. The County hired a geotechnical firm to identify the cause of the slide, and recommend and direct remedial actions to mitigate land movement. B. On March 19, 1996 the Board of Supervisors concurred in the County Administrator's proclamation of a local emergency. C. June 4, 1996 the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the area subject to creep. Continued on Attachment: X SIGNATURE: _RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE (S): ACTION OF BOARD O to /99(o APPROVED AS RECOMMENDED_OTHER_ VOTE OF SUPERVISORS / UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: MLH:drg:sd gldesign:BO:bohil310.t8 t hereby eertNy that this is a true am correct copy of Orig.Div: Public Works(Design) of$tartan and entered on qre mtnutea ort'o Contact: Pattie McNamee(313-2303) date shown. cc: CAO 11TTESTED: dCo CountyAuditor/Controller Counsel a � GMEDA Design Div. Construction Div. Maintenance Div. -Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep AUGUST 6, 1996 Page Two III. Reasons for Recommendations and Background (cont'd): D. Repair status is as follows: 1. Geotechnical and civil engineers completed necessary additional surface and subsurface exploration of the site. The information gained from this exploration is necessary to complete the final design details. 2. In anticipation of the award of contract by August 8, 1996, the start of work on the construction of the repair is expected by late August. 3. Conflicting utilities have been relocated to accommodate the repair work, or removed if no longer necessary. 4. The County reached an agreement with the Department of Fish and Game (DFG) to ensure future mitigation for the impacts to the area within DFG's jurisdiction by issuing a letter of credit. Other regulatory permitting agencies are preparing the necessary approvals to allow the repair work to proceed. 5. The County has secured two borrow sites to provide the necessary earth material to construct the repair. The majority of the necessary land rights to construct the repair have been obtained. IV. Consequences of Negative Action: Repair work would not be completed before next winter.