Loading...
HomeMy WebLinkAboutMINUTES - 08131996 - D15 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA, AS GOVERNING BOARD OF CONTRA COSTA COUNTY SANITATION DISTRICT NO. 19 Adopted this Order on August 13 , 1996, by the following vote: AYES: Supervisors Rogers, Bishop, Torlakson, DeSaulnier NOES: None ABSENT: Supervisor Smith ABSTAIN: None SUBJECT: Award of Contract for Discovery Bay Wastewater Treatment Plant UV Disinfection System, Discovery Bay area Project No. 7393-6X9E90 Bidder Total Amount Bond Amounts Conco-West, Inc. $483, 080. 00 Payment: P.O. Box 1228 (Base Bid Only) $241,540.00 Manteca, CA 95336 Performance: $483, 080. 00 Kirkwood-Bly, Inc. Santa Rosa, CA Pete Fuller Construction Vacaville, CA S. R. Hamilton Construction Danville, CA INA Engineering Construction Tracy, CA R. E. McCollum Cedar Ridge, CA Alan A. Bradford, Inc. Fairfield, CA N. V. Heathorn, Inc. Oakland, CA Albay Construction Co. Martinez, CA The above-captioned project and the plans and specifications therefor having been previously approved, and bids having been duly invited and received by the Public Works Director on July 16, 1996; and The bidder listed first above, Conco-West, Inc. ("Conco") , having submitted the lowest responsive and responsible bid, which is $9,420. 00 less than the next lowest bid; and The Contract Compliance Officer having reported that Conco has attained MBE participation of 5.3% and WBE participation of 3 . 0%, and the Board having considered Conco Is documentation of good faith effort to comply with the MBE and WBE goals (14% and 6%) and requirements for this project; and The Public Works Director recommending that the bid submitted by Conco is the lowest responsive and responsible bid, and this Board concurring and so finding; NOW, THEREFORE, the Board finds, determines and orders as follows: AWARD OF CONTRACT FOR DISCOVERY_BAY August 13, 1996 WASTEWATER TREATMENT PLANT W DISINFECTION SYSTEM, DISCOVERY BAY AREA The Board DETERMINES that Conco, as the lowest monetary bidder, has demonstrated a good faith effort, pursuant to Public Contract Code Section 2000, to comply with the M/WBE goals (14% and 6%) and requirements for this project, and the Board WAIVES any irregularities in such compliance; and The Board ORDERS that the contract for the furnishing of labor and materials for said work is awarded to Conco at the listed amount (base bid only) and at the unit prices submitted in said bid, and that said contractor shall present two good and sufficient surety bonds as indicated above, and that the Public Works Director shall prepare the contract therefor; and The Board FURTHER ORDERS that after the contractor has signed the contract and returned it, together with the bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director is authorized to sign the contract for this Board; and The Board FURTHER ORDERS that, in accordance with the project specifications and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for security shall be returned; and The Board FURTHER ORDERS that the Public Works Director is authorized to sign any escrow agreements prepared for this project to permit the substitution of securities for moneys withheld by the District to ensure performance under the contact, pursuant to Public Contract Code Section 22300; and Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public Contract Code Sections 4107 and 4110 to the Public Works Director or his designee; and Pursuant to Labor Code Section 6705, the Board FURTHER DELEGATES to the Public Works Director or to any registered civil or structural engineer employed by the District the authority to accept detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection during trench excavation covered by that section; and The Board DECLARES that, should the award of the contract to Conco be invalidated for any reason, the Board would not in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from reawarding the contract to another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract or fails to furnish required bonds or insurance (see Public Contract Code Sections 5100-5107) . Contact: Skip Epperly, (510) 313-2253 �t�aAly iht thb b�!ros ttad eatre! d � actlon taken and ancrod on tha nWMA1S of"tlM Orig. Dept: PW - Admin. board of 800 90 dab ShO L ED ATTEST 3 1112,6 PHIL SATCWLOR,Clerk 0MG board cc: Public Works Department ofSuperVISOM OWCoantyAdmkilaMW - Admin. - Accounting D " County Counsel Auditor-Controller Contractor (Via Delta Diablo Sanitation Dist. ) Surety (Via Delta Diablo Sanitation Dist. ) Delta Diablo Sanitation Dist. , Attn: Levia Stein -2-