Loading...
HomeMy WebLinkAboutMINUTES - 07091996 - C1 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on July 9, 1996, by the following vote: AYES: Supervisors Rogers, Bishop, DeSaulnier, Torlakson, Smith NOES: None ABSENT: None ABSTAIN: None SUBJECT: Award of Contract for Castro Ranch Road Slide Repair Project, E1 Sobrante area Project No. 0672-6R6209-95 Bidder Total Amount Bond Amounts John M. Tyson $37,425. 00 Payment: 25 Tyson Court $18,712 . 50 El Sobrante, CA 94803 Performance: $37,425. 00 . Joe Carone, Inc. Crockett, CA Miller/Thompson Constructor Richmond, CA Wildcat Underground Petaluma, CA Siteworks Construction, Inc. Lafayette, CA Eugene G. Alves Construction Co. Pittsburg, CA Scharmer Company Concord, CA Alamo Engineering Danville, CA Durango Pipeline, Inc. Livermore, CA Fanfa, Inc. San Lorenzo, CA Bay Hawk, Inc. Pinole, CA NRA Construction Co. Vallejo, CA The above-captioned project and the plans and specifications therefor having been previously approved, and bids having been duly invited and received by the Director of Public Works on June 11, 1996; and The Contract Compliance Officer having reported that the lowest monetary bidder, Robert W. Tyson Construction ("Robert Tyson") , has attained DBE participation of 14 .45%, the Contract Compliance Officer having determined that Robert Tyson has failed to meet the DBE goal for this project (20%) and has failed to document an adequate good faith effort to comply with said goal and the DBE requirements, as provided in the project specifications, and the Contract Compliance Officer recommending rejection of said bid; and AWARD OF CONTRACT FOR THE CASTRO July 9, 1996 RANCH ROAD SLIDE REPAIR PROJECT, EL SOBRANTE AREA Robert Tyson having been notified in writing of the Contract Compliance Officer's determination and having failed to appeal it, as provided in the project specifications; and The bidder listed first above, John M. Tyson ("John Tyson") , having submitted the lowest responsive and responsible bid, which is $2, 355. 00 less than the next lowest bid; and John Tyson having failed to sign and complete the last page of its bid but having submitted a valid, signed bid bond with its bid and having promptly cured the irregularity by signing and completing the last page; and The Contract Compliance Officer having reported that John Tyson has attained DBE participation of 20. 33%, which exceeds the DBE goal for this project (20%) ; and The Director of Public Works recommending that the bid submitted by John Tyson is the lowest responsive and responsible bid, and this Board concurring and so finding; NOW, THEREFORE, the Board finds, determines and orders as follows: The Board DETERMINES that the lowest monetary bidder, Robert Tyson, has failed to meet the DBE goal for this project, has failed to document an adequate good faith effort to comply with the DBE goal and the DBE requirements for this project and has failed to appeal the Contract Compliance Officer's determination, as provided in the project specifications, and the Board FURTHER DETERMINES that said bid is non- responsive and REJECTS said bid on that basis; and The Board WAIVES the following minor irregularity in John Tyson's bid and FURTHER DETERMINES that a valid, signed bid bond was submitted with the bid and that the irregularity has been promptly cured: failure to sign and complete the last page of the bid; and The Board FURTHER DETERMINES that John Tyson, as the lowest responsive and responsible bidder, has exceeded the DBE goal (20%) and has fully complied with the DBE requirements for this project, and the Board FURTHER WAIVES any irregularities in such compliance; and The Board ORDERS that the contract for the furnishing of labor and materials for said work is awarded to John Tyson at the listed amount and at the unit prices submitted in said bid, and that said contractor shall present two good and sufficient surety bonds as indicated above, and that the Director of Public Works shall prepare the contract therefor; and The Board FURTHER ORDERS that after the contractor has signed the contract and returned it, together with the bonds as noted above and any required certificates of insurance or other required documents, and the Director of Public Works has reviewed and found them to be sufficient, the Director of Public Works is authorized to sign the contract for this Board; and The Board FURTHER ORDERS that, in accordance with the project specifications and/or upon signature of the contract by the Director of Public Works, any bid bonds posted by the bidders are to be exonerated and any checks. or cash submitted for security shall be returned; and The Board FURTHER ORDERS that the Director of Public Works is authorized to sign any escrow agreements prepared for this project to permit the substitution of securities for moneys withheld by the County to ensure performance under the contact, pursuant -to Section 22300 of the Public Contract Code; and -2- AWARD OF CONTRACT FOR THE CASTRO July 9, 1996 RANCH ROAD SLIDE REPAIR PROJECT, EL SOBRANTE AREA Pursuant to Public Contract Code Section 4114 , the Board DELEGATES its functions under Public Contract Code Sections 4107 and 4110 to the Director of Public Works or his designee; and Pursuant to Labor Code Section 6705, the Board FURTHER DELEGATES to the Director of Public Works or to any registered civil or structural engineer employed by the County the authority to accept detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection during trench excavation covered by that section; and The Board DECLARES that, should the award of the contract to John Tyson be invalidated for any reason, the Board would not in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from reawarding the contract to another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract or fails to furnish required bonds or insurance (see Public Contract Code Sections 5100-5107) . 1 hereby oeBfy that this is a true and correct copy of an action taken and entered on the minutes a, the Board of Supervisors on the date �sta�wn�.... ATTESIL tM0$rof supsivism Mid G 11t{fes Contact: Joseph P. Murphy, (510) 313-2321 Orig. Dept: PW-Const. cc: Public Works Department - Construction Division - Accounting County Counsel Auditor-Controller John M. Tyson (Via Const. Div. ) Robert W. Tyson Construction (Via Const. Div. ) Surety (Via Const. Div. ) S.B.E. 703 Market St. San Francisco, CA 94103-1000 -3-