Loading...
HomeMy WebLinkAboutMINUTES - 09121995 - C37 TO: BOARD OF SUPERVISORS Vv' FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: SEPTEMBER 12, 1995 SUBJECT: ACCEPT THE STATUS AND EXPENSE REPORT THROUGH THE FOURTH QUARTER OF FISCAL YEAR 1994-95 AND APPROVE FISCAL YEAR 1995-96 PROGRAM BUDGET FOR THE BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT, DANVI LLE AREA. Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: ACCEPT the Blackhawk Geologic Hazard Abatement District (GHAD) Status and Expense Report through the fourth quarter of Fiscal Year 1994-95, and APPROVE the annual program budget for Fiscal Year 1995-96 revenue and expenses. II. Financiallmpact: There is no impact to the County General Fund. III. Reasons for Recommendations and Background: The total budgeted cost for Fiscal Year 1994-95 for the Blackhawk GHAD was $800,000. Actual expenses for Fiscal Year 1994-95 were $781,892. The budget for Fiscal Year 1995-96 is $783,500. The projects anticipated for Fiscal Year 1995-96 are similar to the projects completed this fiscal year. They include retaining wall repair and construction, grading, drain repair and construction, and other miscellaneous repair projects. IV. Consequences of Negative Action: The quarterly report will not be accepted as required by original formation of the Blackhawk GHAD. Continued on attachment: —yes SIGNATURE: l/' RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: APPROVED AS RECOMMENDED_OTHER VOTE OF SUPERVISORS ✓ UNANIMOUS (ABSENT ) AYES: NOES: co of ABSENT: � ABSTAIN: I hereby certify that this Is a true and correct COPY an action taken and entered on the minutes of the Board of Supervis on the date shown. /9��— SE:pe g:\EngSvc\SpDist\BO\.GHAD-2 12.t9 ATTESTED: PHIL BAT ELOR,clerk of the Board Contact: Skip Epperly,(510)313-2253 of Supervisors and County Administrator Orig.Div.: PW(Special Districts) cc: Auditor-Controller Accounting pea.ity Nystrom Engineering BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT BUDGET REPORT FY '95-'96 August 1, 1995 BUDGET ACTUAL EXPENSES BUDGET JUL '94-JUN '95 JUL '94-SEPT '94 JUL '95-JUN '96 A. PROJECTED INCOME 1. Annual Revenue Via CSA M-23 $946,260. $780,000. 2. Estimated Interest Earnings 54,000. 90,000. TOTAL INCOME: $999,260. $870,000. B. PROJECTED EXPENSES 1. General Manager $ 38,000. $ 40,375 $ 41,000. 2. Engineering Geologist and Assistant Geologist $119,000. $118,218. $122,000. 3'. Support services (e.g. office space, office equipment, office staff vehicles) 0* 0 0* 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program) $363,000. $325,139. $357,500. b) Construction Administration 67,000. 59,254. $ 70,000. 5. Legal, accounting and insurance 70,000. 48,014. $ 40,000. 6. Professional Soils & Geotechnical Consulting 95,000. 113,236. $ 98,000. 7. Professional Civil Engineering and Environmental Consulting 38,000. 77 656. $ 45,000. 8. County staff services 10,000. 0 $ 10,000. TOTAL EXPENSES: $800,000. $781,892. $783,500. 9. Reserve** $199,260. $217,368. $ 86,500. TOTAL BUDGET: $999,260. $999,260. $870,000. * Included in items 1, 2, and 4(b). ** Not including GHAD Reserve Savings Account. W:\DATA\WP51\NANCY\BLAKHAWK\3UDGET.95 ' BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS- 1995-1996 FISCAL YEAR- CONSTRUCTION YEAR END Category Est Budget Actual Cost Est Budget (FY 194-195) July94-June95 (FY 195-196) Slope Stabilization 1. Corrective Grading 50,000.00 0.00 74,000.00 2. Revegation 31,000.00 5,754.30 10,000.00 3. Slope Erosion Protection 20,000.00 14,633.61 20,000.00 4. Retaining or Pin Walls 35,000.00 33,094.22 35,000.00 Surface Drainage Improvements 5. Maintenance B-58 Drain Sys. 18,000.00 18,763.50 19,000.00 6. Cons. B-58 Drain. Sys. 36,000.00 24,630.93 26,000.00 7. Storm Drain Maintenance 20,000.00 13,766.10 21,000.00 8. Erosion/Runoff Cont. Devices 53,000.00 23,436.63 45,000.00 Subsurface Drainage 9. Subdrain Insp. and Main. 16,000.00 .68,036.82 17,000.00 10. Horiz. Drain Insp. and Main. 10,000.00 8,994.62 11,000.00 11. Drilling Horizontal Drains 52,000.00 43,970.51 60,000.00 Repair of Existing Improvements 12. Insp. & Reapir of Drain. Struct. 12,000.00 38,427.84 12,500.00 13. Other Construction Projects 10,000.00' 31,629.62 7,000.00 TOTAL $ 363,000.00 $ 325,138.70 $ 357,500.00