Loading...
HomeMy WebLinkAboutMINUTES - 09271994 - 1.1 (2) /O/® THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on September 27, 1994 by the following vote: AYES: - Supervisors Smith, DeSaulnier, Torlakson and Bishop NOES: None ABSENT: Supervisor Powers ABSTAIN: None SUBJECT: Granting Permission to Partially Close a portion of Port Street in the Crockett Area for the purpose of installing electrical cables for the Crockett cogeneration project. The Public Works Director having reported that prior approval has been granted to Pirelli Construction Services, Inc., to amend the dates of their road closure permits to partially close except for emergency traffic, Port Street between Wanda Street and Ceres Street for the period of 7:00 a.m. to 5:00 p.m. from September 7, 1994 through September 15, 1994 for the purpose of trenching the road to install a 230 KV cable conduit subject to the following conditions: 1. Traffic will be detoured via neighboring streets as shown in the detour plans. 2. All signing to be in accordance with the State of California Manual of Traffic Controls. 3. Pirelli Construction Services, Inc., shall comply with the requirements of the Ordinance Code of Contra Costa County. 4. Have on file with the County a Certificate of Insurance in the amount of $500,000 for Comprehensive General Public Liability which names the County as an additional insured. 5. Obtain approval for the closure from the Sheriff's Department, the California Highway Patrol and the Fire District. I hereby certify that this Is a true and correct copyot an action taken and entered on the minutes Of the Board of SuPaQ n the date shown. ATTESTED:'NM?r' ? 2 3994 PHIL BATCHELOR.CreWdf the Board of Supervisors and County Administrator J By A x", —.Deputy Originator: Public Works(FS) Contact: Rich Lierly, 313-2348 cc: CHP Sheriff-Patrol Div. Commander Pirelli Construction Services,Inc. (via PW) P.O. Box 475 Crockett, CA 94524 J. Capozzo, APC BO:27.t9