HomeMy WebLinkAboutMINUTES - 09271994 - 1.1 (2) /O/®
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on September 27, 1994 by the following vote:
AYES: - Supervisors Smith, DeSaulnier, Torlakson and Bishop
NOES: None
ABSENT: Supervisor Powers
ABSTAIN: None
SUBJECT: Granting Permission to Partially Close a portion of Port Street in the Crockett
Area for the purpose of installing electrical cables for the Crockett
cogeneration project.
The Public Works Director having reported that prior approval has been granted to
Pirelli Construction Services, Inc., to amend the dates of their road closure permits to
partially close except for emergency traffic, Port Street between Wanda Street and Ceres
Street for the period of 7:00 a.m. to 5:00 p.m. from September 7, 1994 through September
15, 1994 for the purpose of trenching the road to install a 230 KV cable conduit subject to
the following conditions:
1. Traffic will be detoured via neighboring streets as shown in the detour plans.
2. All signing to be in accordance with the State of California Manual of Traffic
Controls.
3. Pirelli Construction Services, Inc., shall comply with the requirements of the
Ordinance Code of Contra Costa County.
4. Have on file with the County a Certificate of Insurance in the amount of
$500,000 for Comprehensive General Public Liability which names the
County as an additional insured.
5. Obtain approval for the closure from the Sheriff's Department, the California
Highway Patrol and the Fire District.
I hereby certify that this Is a true and correct copyot
an action taken and entered on the minutes Of the
Board of SuPaQ n the date shown.
ATTESTED:'NM?r' ? 2 3994
PHIL BATCHELOR.CreWdf the Board
of Supervisors and County Administrator
J
By A x", —.Deputy
Originator: Public Works(FS)
Contact: Rich Lierly, 313-2348
cc: CHP
Sheriff-Patrol Div. Commander
Pirelli Construction Services,Inc. (via PW)
P.O. Box 475
Crockett, CA 94524
J. Capozzo, APC
BO:27.t9