HomeMy WebLinkAboutMINUTES - 09131994 - IO.7 f
TO: BOARD OF SUPERVISORS 1 .0.-7 �`` 5' ` Contra
FROM:
INTERNAL OPERATIONS COMMITTEE / '� Costa
� � '
County
August 23 1994
DATE: g / r�sr+c�iii+� c
SUBJECT: RESCINDING ONE APPOINTMENT TO THE SUBSTANCE ABUSE ADVISORY BOARD
AND MAKING ANOTHER APPOINTMENT
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS:
1 . RESCIND the Board' s action on August 16, 1994 in appointing
Ellzie Ware, Jr. to the Substance Abuse Advisory Board.
2 . APPOINT to the, vacant at-large seat # 4 on the Substance Abuse
Advisory Board, replacing Mr. Ellzie Ware, Jr. , to complete an
unexpired term ending June 30; 1995 :
Paul J. Rich
635 Alhambra Lane
Martinez, CA 94553
BACKGROUND:
On August 2 , 1994, on the recommendation of Supervisor Smith, Mr.
Ellzie Ware, Jr. was appointed to a Supervisorial District II seat
on the Substance Abuse Advisory Board. Due to an oversight by
staff, on August 16, 1994, Mr. Ware was also appointed to an at-
large seat on the- Substance Abuse Advisory Board. Since Mr. Ware
had already been appointed to a District II seat, we are
recommending that his appointment to the at-large seat be rescinded
and that another of the applicants our Committee interviewed, Mr.
Paul J. Rich, be appointed to the vacant at-large seat.
CONTINUED ON ATTACHMENT: YES SIGNATURE:
RECOMMENDATION OF COUNTY ADMINIST R ECO M ATION OF BOARD COMMITTEE
APPROVE OTHER
JEFF SMITH PARAKMD LNIER
U
SIGNATURE(S):
ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A TRUE
UNANIMOUS(ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN
AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD
ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN.
3 1994
ATTESTED
Contact: County Administrator PHIL BATCHELOR,CLERK OF THE BOARD OF
cc: Health Services Director SUPERVISORS AND COUNTY ADMINISTRATOR
Chuck Deutschman
Substance Abuse Program Administrator
Mr. Paul J. Rich BY �U14 _ DEPUTY
RECEIVED
Qt
CONTRA COSTA COUNTY ADVISORY BOARDS, COM S I( b) TTEES
APPLICATION FORM
SUPERVISOR SMITH
Name of advisory board applying for
Application Form must be typed or hand printed.
Name of Applicant: �= Z(Cd,(
Home Address: �3SQckr�� -r1 � Home Phone: Zzg -9 39�
Business Address: F.o•C39x Ss( tiven, � Work Phone: 31
Signature: el:z
Date: 1 +
Personal Experience, Skills and Interests
Education/Background: G��(.. � S . G l V1 e,-' UTA V W 17 t OF
Occupation (student, for pay work, not for pay work, retiree or similar):
Li Inu `T- l:- f- Js C�IZPan.�zro�
C � UMe'- A-rr-hzv Gam)
Community Activities: / `
�� CEJagEt.�� A;T &WV7-n1
Special Interests: w+dD �AISI•J�q
Information:
1. File completed application with Clerk of the Board, 651 Pine Street, Room 106, Martinez, CA
94553.
2. Members of some advisory bodies may be required to file annual Conflict of Interest Statements.
3. Meetings of advisory bodies may be held.in Martinez or in areas not accessible by public
transportation.
4. Meetings may be held either in the evenings or during the day, usually once or twice a month.
5. Some boards assign embers to subcommittees or work groups requiring additional time.
CIPY4-C�-- Ile-,7Y-q N�?4LTH SSU
DI ST.Tl C. brur'.Scty .+N
P
Paul J. Rich
635 Alhambra Lane
Martinez, CA 94553
EDUCATION: B.S./1988/Civil Engineering/University of Cincinnati
REGISTRATION: EIT Passed/1988
Associate Member, American Society of Civil Engineers
Member, American Society of Quality Control
Trained in OSHA 29CFR1910.120
PUBLISHED DISCUSSION: "Schedule Games People Play and Suggested Remedies", published in Jul '93
in the ASCE Journal of Management in Engineering.
EXPERIENCE SUMMARY:
Over 6 years of progressive experience in Project Management for various environmental, industrial and
commercial projects ranging from $2MM - $50MM. On previous projects, have been responsible for design,
funding requests, procurement and construction management.
Experience in estimating and negotiating contract changes and claim analysis. Extensive experience with
computer scheduling programs and all general computer office packages. Experience ranges from supervision
of direct craft labor to the management of multiple subcontractors.
SELECTED PROJECTS:
The Ralph M. Parsons Company
Office Engineer responsible for all document functions for a $30MM/yr, 35 person construction engineering
construction office. Acting as third in command for all safety, purchasing, quality and client issues.
Area Construction Engineer for major site preparation contract for the Shell Oil Company Clean Fuels
Program. The work included 400,000 cyds of earthwork, 3,000 cyds of concrete, storm sewers, roads and
paving. Responsible for all planning, quality assurance and on-site activities for the project.
Project Engineer for environmental water seal of two oil/water treating units in the Shell Oil Refinery.
Responsible for all design, funding, procurement and construction activities to Shell.
Area Construction Engineer'for construction administration effort on a 600,000 GSF office building/parking
deck for the Commonwealth of Virginia. Acted as assistant to Senior Project Manager supervising and
coordinating all functions on the project. Responsible for developing and monitoring project reporting
procedures including: change control, quality assurance and document control. Conducted preconstruction
conferences, progress and payment reviews, contractor requests for changes and time extensions. Prepared
formal monthly reports to the owner on progress. Performed constructibility reviews, assisted with
development of construction schedules and contracts.
Senior Construction Engineer on several projects in operating units including turn-arounds, grass roots and
environmental remediation projects at Shell Oil Refinery. Managed initial engineering site investigation,
participated in constructibility reviews, and managed construction activities.
Civil Field Engineer on Ground water Recovery Project at Shell Oil Refinery, managed all punchlist and pre-
commissioning activities for the project. Produced reports on construction manpower, safety and activities for
the entire Shell/RMP partnership program.
The Turner Corporation
Project Engineer responsible for all engineering facets of central services phase of hospital project.
Coordinated all drawings and specifications and changes for all subcontractors.
Project Superintendent on renovation of computer facilities and entrance lobbies for private school.
Responsible for all aspects of the project to senior management.
Project Engineer for the renovation of offices and showrooms for textile manufacturer on Park Avenue.
Responsible for all shop drawings, mock-ups submittals, change orders and progress payments.
Cost and Scheduling Engineer responsible for cost analysis and project earnings projection to senior
management on projects in the Middle-East, the Caribbean. Europe and Asia.