HomeMy WebLinkAboutMINUTES - 08161994 - 1.2 TO: BOARD OF SUPERVISORS 1 .2 FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: August 16, 1994 SUBJECT: Contract Award Recommendation: Cypress Rd.-Jersey Island Rd. Left Tum Lane Project, Project No. 0662-6R4112-93, Bethel Island area. Specific Request(s) or Reoornrnen&R1-5n-(s7&Backgroundus i ica ion RECOMMENDED ACTION: AWARD the contract for furnishing labor and materials for the subject project to Granite Construction Company, the low bidder, who has also met the requirements of the County's Disadvantaged Business Enterprise Contract Compliance Program, in the amount of$93,918.90 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of$ 46,959.45 and $93,918.90, respectively. DIRECT the Public Works Director to prepare the contract for the project. AUTHORIZE the Public Works Director to sign the contract on behalf of the Board subject to the Director having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned surety bonds, and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Public Works Director, any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public Contract Code Sections 4107 and 4110 to the Public Works Director or his designee. Pursuant to section 6705 of the Labor Code, the Board also DELEGATES to the Public Works Director or to any registered civil or structural engineer designated by him the authority to accept detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection during trench excavating covered by that section. FINANCIAL IMPACT: The project, including engineering and appropriate overhead charges, is funded by Federal Hazard Elimination Safety (85%) and Road Funds (15%). Continued on attachment: X yes SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER: SIGNATURE(S): ACTION OF BOARD ON: 199 APPROVED AS RECOMMENDED_ OTHER r VOTE OF SUPERVISORS k UNANIMOUS (ABSENT_) AYES: NOES: ABSENT: ABSTAIN: Contact: Joseph P.Murphy, (510)313-2321 Orig.Div.: PW-Const. cc: County Administration Auditor-Controller Public Works; -Accounting -Construction,R.Bruno f%cel y certify that this is a true and correct copy of -Design an action taken and entered on the minutes of the -Trans.Eng.,H.Ballenger Board of Supervisorson the date shown S.B.E.- ATTESTED: /-94-/ 926 Natoma St. PHIL BATCHEL oler1 ; �I,^Board San Francisco,CA 94103-2514 of Supervisors an Count.• a imiaistrator Contractor By Deputy RB:tt g:lconst\BO\CJI-16.t8 • Project Name: Cypress Rd.-Jersey Island Rd.Left Turn Lane Project No. 0662-6114112-93 Board Date: August 16,1994 Page 2 of 2 REASONS FOR RECOMMENDATION/BACKGROUND: The plans and specifications were approved and the project advertised for bids by the Board of Supervisors on June 28, 1994. The bids were received and opened at 255 Glacier Drive, Martinez, California, on July 26, 1994. The construction bids received were as follows: 1. Granite Construction Co. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $93,918.90 The Engineer's estimated construction cost was $73,463.75.