Loading...
HomeMy WebLinkAboutMINUTES - 07261994 - 1.17 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: July 26, 1994 SUBJECT: Contract Award Recommendation: 1993 Walnut Creek Desilting Project, Project No. 7520-6139328-93 Specific Request(s)or Recommendation(s)&Background&Justification RECOMMENDED ACTION: AWARD the contract for furnishing labor and materials for the subject project to Kristin Trucking Company, the low bidder, who has also met the requirements of the County's Minority and Women Business Enterprise Contract Compliance Program, in the amount of$138,025.37 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of$69,012.69 and $138,025.37, respectively. DIRECT the Chief Engineer to prepare the contract for the project. AUTHORIZE the Chief Engineer to sign the contract on behalf of the Board subject to the Chief Engineer having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned surety bonds, and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Chief Engineer any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public Contract Code Sections 4107 and 4110 to the Chief Engineer or his designee. Pursuant to section 6705 of the Labor Code, the Board also DELEGATES to the Chief Engineer or to any registered civil or structural engineer designated by him the authority to accept detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection during trench excavating covered by that section. FINANCIAL IMPACT: The project, including engineering and appropriate overhead charges, is funded by Zone 3B Flood Control. Continued on attachment: X yes SIGNATURE: COMMENDATION OF COUNTADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER: SIGNATURE(S): ACTION OF BOARD ON: q APPROVED AS RECOMMENDED OTHER I hereby certify that this Is a true and cornett copy of an action taken and entered on the minutes of the VOTE OF SUPERVISORS Board of Su on the date shown. ✓ UNANIMOUS (ABSENT—) ATTESTED: -x u 6- PHIL B CHELOR,CI rk of the Board AYES: NOES: of Supervisors and County Administrator ABSENT_ABSTAi1T-__ By �pM�,� JLL J. ,peauty S � . 1993 Walnut Creek Desilting Project, Project No. 7520-SB9328-93 Board Date: July 26,1994 Page 2 of 2 RECOMMENDATION/BACKGROUND: The plans and specifications were approved and theroject advertised for bids by the Board of Supervisors on June 14, 1994. The bids were received and opened at 255 Glacier Drive, Martinez, California, on July 12, 1994. The construction bids received were as follows: 1. Kristin Trucking Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $138 025.37 2. Siteworks Construction, Ic. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 ,086.20 3. McGuire and Hester . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195,868.87 4. Winton Jones Contractor, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212,000.00 5. Fanfa, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245,845.21 6. Mount Diablo Corporation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 267,239.00 7. North Bay Construction, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 269,936.88 8. Stevens Creek Quarry, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273,559.42 9. D.E. Bianchini, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 281,787.20 10. Oliver de Silva . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 307,100.58 The Engineer's estimated construction cost was $191,641.65 Contact: JoseP.Murphy,(510)313-2321 Orig.Div.: PW( str) cc: County Administrator Auditor-Controller Public Works - Accounting,R.Gilchrist - Construction,R.Bruno - Design S.B.E.- Transp.Eng.,Heather Ballenger 926 Natoma St. San Francisco,CA 94103-2514 Contractor RB/tt g:\CONST\BO\WCD-26.t7