HomeMy WebLinkAboutMINUTES - 09211993 - 1.2 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: September 21, 1993
SUBJECT: Approve Consulting Services Agreement with Wahler Associates for Johnston Road
Bridge Replacement
Project No.: 0662-6R4143-90 - Danville Area
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Public Works Director to execute the Consulting Services
Agreement with Wahler Associates to perform a geotechnical investigation and a Phase I
environmental engineering investigation for Johnston Road Bridge Replacement for the Contra
Costa County Public Works Department in the amount of $14,600.
II. Financial Impact:
The estimated contract cost is $14,600 funded by Federal Bridge Replacement Funds (HBRR)
(80%) and County Road Funds (20%).
III. Reasons for Recommendations and Background:
The geotechnical investigation is needed in order to evaluate existing conditions and make
recommendations for bridge foundations, cut slope, retaining wall, embankment and drainage
designs.
IV. Consequences of Negative Action:
If the Consulting Services Agreement with Wahler Associates is not approved the road
realignment and bridge project cannot be designed or constructed.
Continued on Attachment: SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON 11993 APPROVED AS RECOMMENDED OTHER _
VOTE F SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this Is a true and correct copy -D1
an action taken and entered on the minutes of to"
DR:jlg Board of Supe, . �!r����own.
c\BO:Bo21.t9 ATTESTED: �t +
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works(Design Division) of Supervisors and unty Administrator
cc: Neil Leary (313-2363)
County Administrator By ,deputy