HomeMy WebLinkAboutMINUTES - 09141993 - 1.37 j 1- 37 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: September 14, 1993 SUBJECT: APPROVE CONSULTING SERVICES AGREEMENT WITH ENGEO INCORPORATED FOR SEDIMENT SAMPLING AND TESTING OF THE LOWER WALNUT CREEK CHANNEL, AVON AREA Project No.: 7520-668430 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and AUTHORIZE the Chief Engineer to execute the Consulting Services Agreement with Engeo Incorporated to perform sediment sampling and testing for the lower Walnut Creek Channel from Suisun Bay to the confluence of Grayson Creek. Engeo Incorporated has met the requirements of the County's .Minority and Women Business Enterprise Service Contracts Compliance Program. II. Financial Impact: The contract cost is $57,255. The cost will be funded by the Flood Control Zone 3B. III. Reasons for Recommendations and Background: The Flood Control District is developing a silt removal project in the lower Walnut Creek Channel. The channel was improved by the Corps of Engineers in the mid-sixties and dredged in 1973. The Corps of Engineers then turned over the channel maintenance responsibilities to the District. The channel has accumulated approximately 800,000 cubic yards of silt and most of its length is inundated by tidal waters from Suisun Bay. There are significant environmental and regulatory agency requirements affecting such removal and disposal of the silt. This contract is a first step to determine the sediments' composition, and to detect the presence of pollutants which may restrict the ability to dispose the sediment. Continued on Attachment: x SIGNATURE: LA _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON SEP 14 1993 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS [/ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: RDA:kd c:BO 14c.t9 Orig. Div: Public Works (F/C) Contact: R. Agnew, Flood Control 313-2276 cc: County Administrator Community Development Building Inspection Count, Counsel her `' t Hereby certlry that'*is4s a true and correct copy:t County Assessor an action taken and entered on:the minutes of the County Treasurer - Tax Collector Board of sup(ervisdra ori'th�aate swawn, ATTESTSD: BE 1 ' 1993 County Auditor - Controller PHIL BATCHELOR,Clerk of the'Board ) Chief Engineer of Superii(sors and County Administrator- Accounting BY Engineering Services CONSULTING SERVICES AGREEMENT WITH ENGEO INCORPORATION September 14, 1993 Page Two IV. Consequences of Negative Action: The Flood Control District has been directed by the Department of the United States Army Corps of Engineers to arrange.for the removal of the sediment to restore the design capacity of the Walnut Creek Channel. Failure to perform sampling of the sediment would delay the project and may result in flooding of the area and be in violation of the Operations and Maintenance Agreement with the Corps of Engineers. w / CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 255 GLACIER DRIVE, MARTINEZ, CALIFORNIA DATE: September 8, 1993 TO: Board of Supervisors FROM: J. Michael Walford, Chief Engineer r SUBJECT: Consulting Services Agreement with eo Incorporated for Sediment Sampling and Testing of the Lower Walnut Creek Channel OUR FILE: 400313-111-30 At the request of Emma Kuevor, Contract Compliance Officer, this memo was prepared to explain any misunderstanding there may be about the MBE/WBE goals used or obtained for this project. The Consultant Services Agreement is set for approval on the September 14, 1993 Board of Supervisors agenda. In March, 1992, a Request for Proposals was sent to consultants to provide the sampling and testing of the sediment, as well as a biological assessment of the Lower Walnut Creek Channel. In June, 1992, Engeo Inc. was selected to perform the work. They met the current goals of twenty percent MBE and seven percent WBE of the County's MBE/WBE Contract Compliance Program. In August, 1992, the arrangement for executing the Consultant Services Agreement was suspended due to the uncertainty of available funds caused by the reduction of the State and County budgets. In November, 1992, the County's goals were changed to reflect a goal of 5 percent MBE and 10 percent WBE. In April, 1993, the project was reactivated, but with a reduced scope to include only the soils sampling and testing. Engeo has achieved 71 percent MBE and 7.3 percent WBE compli- ance as required during the Spring of 1992. In light of the fact that the original Request for Proposals was sent before the MBE/WBE goals were changed, Emma Kuevor, Contract Compliance Officer, recommends that the 1992 MBE/WBE goals in assessing this project for compliance be used. JMW:MM:kd H:BoS4003B.tg Contact: Melissa Morton 313-2285 cc: Emma Kuevor, Affirmative Action J. James, Administration P. Harrington, Flood Control M. Morton, Flood Control R. Agnew, Flood Control