Loading...
HomeMy WebLinkAboutMINUTES - 09221992 - 1.11 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, Chief Engineer DATE: September 22, 1992 SUBJECT: Corps of Engineers Wildcat/San Pablo Creek Project Phase II, San Pablo/Richmond Area SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: ACCEPT this report from the Chief Engineer indicating the Corps of Engineers has determined that flooding of the common flood plain for Wildcat and San Pablo Creeks upstream of the Atchison Topeka & Santa Fe Railway (Reach 2) causes insufficient damage to justify the estimated expenditure to improve the upper portion of these creeks to prevent flooding. ACCEPT the Corps of Engineers' determination and AUTHORIZE the Chief Engineer to discontinue studying improvement alternatives at this time for these segments of Wildcat/San Pablo Creeks. II. Financial Impact: The Corps of Engineers determination rules out federal participation in the construction of needed improvements costing approximately $20,000,000. Local funding for flood control improvements of this magnitude is not available. III. Reasons for Recommendations and Background: The Corps of Engineers has completed a detailed hydraulic analysis of Wildcat and San Pablo Creeks upstream of the Atchison Topeka & Santa Fe Railway and downstream of Interstate 80. They have determined the limits of flooding that will occur with various frequency storms and the dollar value of expected damage from the flooding. On an average annual basis,the cost of the expected flood damage is less than the average annual c st associated with onstruction Continued on Attachment: X SIGNATURE: Gf _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON �� y y APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS _ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct copy.if an action taken and entered on the minutes of the MFK:ly Board of Superviso on the date shown. a:bo\22.t9 ATTESTED: .2.2-, 9y PHIL SATCHCLOR,Clerk of the Beard Orig. Div: Public Works (Flood Control) 0 Supendsms and county Administrator cc: See Page Two 8Y ,Deputy COE Wildcat/San Pablo Creek Phase II, San Pablo/Richmond Area September 22, 1992 Page Two III. Reasons for Recommendations and Background (Cont'd): of the needed creek improvements to eliminate the flooding. Based on this finding the Corps of Engineers can not justify the expenditure of federal funds to improve these reaches of Wildcat and San Pablo Creeks. District staff has explored numerous alternative solutions; however, staff has not been able to find an alternative with a low enough cost to meet the federal criteria. In the future, redevelopment efforts in the flood plain by the City of San Pablo may generate sufficient benefits and funding to correct the flooding problem from these creeks. At that time we would recommend that staff be authorized to assist the City in developing a solution consistent with the City's redevelopment objectives. Contact Person: Milton Kubicek (510) 313-2203 cc: County Administrator County Counsel GMEDA PW-Flood Control City of Richmond vA .. 'w City of San Pablo Ll,- �.w