HomeMy WebLinkAboutMINUTES - 07281992 - 1.4 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: July 28, 1992 SUBJECT: Amend the Consulting Services Agreement with Centennial Civil Engineers, Inc. State Route 4/13ailey Road Interchange Project Project No.: 4460-6X4159 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: Approve and Authorize the Public Works Director to execute Contract Amendment No. 1 to the Consulting Services Agreement with Centennial Civil Engineers, Inc., for the design of the State Route 4/Bailey Road Interchange Project in the West Pittsburg area. II. Financial Impact: There will be no financial impact to the County General Fund. This Amendment will be funded by Contra Costa Transportation Authority (CCTA) Measure "C". CCTA's Projects and Programs Committee recommended approval of County's request on July 13, 1992, and CCTA approved the allocation on July 15, 1992. The increase is $735,000, for a new contract limit of$4,965,000. III. Reasons for Recommendations and Background: A. Stage Construction/Traffic Handling Plans. The original contract was assumed to be a minimal design effort of nineteen (19) plan sheets for this activity. This was based on the assumption that a detailed plan was not warranted because the contractor would revise the stage construction operation based upon his own productivity schedule and the schedule of his subcontractors. Caltrans, however, is now requiring significantly more details, such that it will require an additional 101 plan sheets. The estimated cost to complete the additional stage construction plan sheets is 5,000 plus a 10% contingency of $37,000, for a total increase of $412,000. v e Continued on Attachment: X SIGNATURE: W RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUL 2 8 1992, APPROVED AS RECOMMENDED V OTHER _ VOTE OF SUPERVISORS If_ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy Df an action taken and entered on the minutes of the RVF:pe Board of Supervisors on the date shown. a\BO:CCEAMD 28.t7 ATTESTED: -.6�1 2 R 1992 PHIL BATCHELOR,Clerk of the Board Orig. Div: Public Works (MP) of Supervisors and County Administrator cc: Accounting ' Auditor/Controller By R ��-,Deputy Centennial Civil Engineers P. Maxwell, CCTA Amend Consulting Services Agreement with Centennial Civil Engineers, Inc. June 28, 1992 Page Two B. Out of Work Scope Surveying and Drainage Analysis. The additional request for design surveying is to increase the survey crew size from two (2) people to three (3) or four (4), based on Cal-OSHA's standards; the increase of parcel numbers from 46 to 74; the cross section surveys of Contra Costa Canal; preparation of full take appraisal maps for the Hill Street water treatment plant expansion; and, additional drainage engineering analysis for the detention basin. The estimated increase in contract cost for this portion of the design is $323,000. IV. Consequences of Negative Action: Should this request be denied, the design work for the State Route 4/13ailey Road Interchange Project would be delayed until an agreement could be reached. This delay would affect the construction completion date.