Loading...
HomeMy WebLinkAboutMINUTES - 09241991 - 1.3 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: September 24, 1991 SUBJECT: State Route 4 Willow Pass Grade Consulting Services Agreement Amendment No.4 Project No.: 4660-6X4110 1 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION l I. Recommended Action: Approve and Authorize the Public Works Director to Execute Contract Amendment No. 4 of the Consulting Services Agreement with Parsons, Brinckerhoff, Quade and Douglas, Inc., for the design of State Route 4 Willow Pass Grade Widening and Lowering Project. II. Financiallmpact: There will be no impact to the County General Fund. Funding for this resolution has been approved by the Contra Costa Transportation Authority on September 24, 1991. The amount of this request is $812,100, increasing the Parsons, Brinckerhoff contract to $4,543,800. III. Reasons for Recommendations and Background: The consultant has identified the following tasks (27 thru 36) which are outside his original scope of work. This work has been required as part of the project design and has been approved by the County Staff, the Authority's Projects and Programs Committee on September 9, 1991, and by the Contra Costa Transportation Authority on September 18, 1991. Continued on Attachment: X SIGNATURE:_ _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON September 24, 1991 APPROVED AS RECOMMENDED X OTHER _ VOTE OF SUPERVISORS X UNANIMOUS (ABSENT I ) AYES: NOES: ABSENT: ABSTAIN: I hereby oar*that this Is a true and correct copy of an action taken and entered on the minutes of the RVF:cl:peo Board of Supervisors on the date shown. a:BO\24-a.t9 ATTESTED: September 24, 1991 PHIL BATCHELOR,Clerk of the Board Orig. Div: Public Works (MP) of Supervisors and cou ty Administrator cc: See page 3 By _ ,Deputy State 4 Willow Pass Grade Consulting Services Agreement September 24, 1991 Page 2 III. Reasons for Recommendation and Background: (Cont.) TASK 27 STAGE CONSTRUCTION DESIGN REVISION The stage construction design was modified in accordance with Caltrans District Office Engineer in order to reflect revisions to the east end conform, construction area plans and add additional construction area sign plans. ($213,200) TASK 28 ADDITIONAL GEOTECHNICAL ENGINEERING Conduct additional field investigation and laboratory testing for sound walls, install and monitor seven test wells to determine ground water infiltration within the large cut and test pavement shoulders to determine construction detour options. ($157,200.) TASK 29 ADDITIONAL DIRECT EXPENSES Due to the extended design time needed to complete the plans from 13 to 20 months and the increase in the number of bi-weekly meetings additional travel timel and expenses, communications, CADD/computer time, xerox copying and distribution of materials additional funding is justified. ($154,700) TASK 30 REDUCE RIGHT OF WAY ACQUISITION BY REDESIGN OF SLOPE EASEMENTS The design of the cut and fill slopes to suit the needs of the adjacent property owner required substantially more effort than originally authorized. ($10,500) TASK 31 PREPARE ADDITIONAL CROSS SECTIONS Prepare composite cross sections to reflect construction staging and prepare and additional 195 sheets of standard cross sections. ($159,800) TASK 32 PREPARE CONTOUR GRADING PLANS FOR PROJECT Contour grading plans were requested to clarify the construction of the cuts slopes and embankment fill slopes as designed in the layout, profile and typical section plans. ($51,000) TASK 33 REVISE WILLOW PASS ROAD BRIDGE Develop culvert alternatives to the fully designed bridge over Contra Costa Canal. ($4,200) TASK 34 PREPARE RECORDS OF SURVEYS Provide additional services to prepare two record of surveys. ($18,500) TASK 35 UTILITY COORDINATION Provide additional utility coordination services to process the required agreements for all utility facility relocations and betterment to be constructed in conjunction with the project. ($19,800) TASK 36 ADDITIONAL RIGHT OF WAY SERVICES AND SUPPLEMENTAL SURVEYS Add additional parcels for drainage mitigation, describe proposed Delta de Anza Trail through g the project, revise appraisal maps along south frontage and provide additional surveys along Evora road at Pomo Dr. ($23,200) State 4 Willow Pass Grade Consulting Services Agreement September 24, 1991 Page 3 IV. Consequences of Negative Action If this Resolution is not approved the design would not be completed and the project would be stopped. cc: Auditor/Controller B. Faraone, Major Projects R. Gilchrist, Accounting B. McFarland, PBQ&D R. Maxwell, CCTA D. Jones, NOLTE G. LaBonte, BARTD