Loading...
HomeMy WebLinkAboutMINUTES - 09251990 - 1.69 File: 250-9024/B.4 .4 THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on September 25, 1990, by the following vote: AYES: Supervisors Powers, Schroder, Mc Peak, Torlakson and Fanden NOES: None ABSENT: None SUBJECT: Award of Contract for Ground Floor Remodeling at 625 Court Street (Finance Building) , Martinez for Superior Court. Authorization No. WPE755 Bidder Total Amount Bond Amounts Atkinson-Hebert $19 , 320 . 00 Base Payment $9, 660 . 00; Construction, Inc . Bid Only Performance 1430 Willow Pass Rd. $19, 320 . 00 Suite 140 Concord, CA 94520 DS Construction & Management Napa, California Elmer A. Lundgren Concord, California Facchini Enterprises, Inc. . Martinez, California Frank Adams Construction Co. , Inc. Rodeo, California E.A. Sparacino, General Contractor Martinez, California The above-captioned project and the specifications therefor having been previously approved, Addendum No. 1 being issued and approved, and bids having been duly invited and received by the Director of General Services; and The Director of General Services recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the prices submitted in said bid; and that. said contractor shall present two good and sufficient surety„ bonds as indicated above; and that the General Services Department shall prepare the contract therefor; and IT IS FURTHER ORDERED that after the contractor has signed the contract and returned it, together with bonds as noted above and any required certificates of insurance or other required documents, and the Director of General Services has reviewed and found them to be sufficient, the Director of General Services is authorized to sign the contract for this Board; and Page 1 of 2 AWARD OF CONTRACT FOR REPAIR OF 250-9024/B.4 . 4 GROUND FLOOR REMODELING AT 625 September 25, 1990 COURT STREET (FINANCE BUILDING) , MARTINEZ , FOR SUPERIOR COURT IT IS FURTHER ORDERED that in accordance with the project specifications and/or upon signature of the contract by the Director of General Services, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for security shall be returned; and IT IS FURTHER ORDERED that the. Director of General Services is authorized to sign any escrow agreements prepared for this project to permit the substitution of securities for moneys withheld by. the County to ensure performance under the contract, pursuant to Section 22300 of the Public Contract Code; and Pursuant to Public Contract Code Section 4114 , the Board DELEGATES its functions under Public Contract Code Section 4107 and 4110 to the Director of General Services or his designee. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervi ors on the date shown. ATTESTED: P 2 5 199A PHIL BATCHELOR,Clerk of the Board Of Supervisors and County Administrator r n � Orig. Dept.— General Services Dept. - Architectural Division cc : General Services Department Architectural Division G. S. Accounting Auditor-Controller Contractor (Via Arch Div) Consulting Architect (Via Arch Div) 25024B09 . 12A GB: ls Page 2 of 2