SUBJECT: Award of Contract for Removal of Fuel Tanks at 900
Block Fitzuren Road, Antioch, for Public Works Department
Authorization No. WPE699
Bidder Total Amount Bond Amounts
SEMCO, Inc . $21,200 . 00 which Payment $10, 600 . 00;
431 West Hatch Road includes Total of Performance
Modesto, CA 95351 Base Bid Items $21,200 . 00
1, 2 and 3
Envirotox Technologies, Incorporated
Sacramento, CA
Warren E . Gomes Excavating, Inc.
Rio Vista, CA
The MARK Group, Construction Engineers
Pleasant Hill, CA
W-T Universal Engineering, Inc.
Benicia, CA
Gold West Builders
Walnut Creek, CA
G & G Engineering, Inc.
Antioch, CA
HSR Inc.
San Jose, CA
ACT Construction, Inc .
Napa, CA
Delta Bay Builders , Inc.
Antioch, CA
Powers Construction Co.
Diamond springs, CA
M.P.H. , Inc .
Santa Rosa, CA
R. S . Eagan & Co.
Concord, CA
Petroleum Engineering, Inc.
Santa Rosa, CA
The above-captioned project and the specifications therefor
having been previously approved, and bids having been duly invited
and received by the Director of General Services; and
The Director of General Services recommending that the bid
listed first above is the lowest responsible bid and this Board
concurring and so finding;
Page 1 of 2
AWARD OF CONTRACT FOR REMOVAL OF 305-8902/B.4 .4
FUEL TANKS AT 900 BLOCK OF FITZUREN August 7 , 1990
ROAD, ANTIOCH, FOR PUBLIC WORKS
DEPARTMENT
IT IS BY THE BOARD ORDERED that the contract for the furnishing
of labor and materials for said work is awarded to said first
listed bidder at the listed amount and at the prices submitted in
said bid; and that said contractor shall present two good and
sufficient surety bonds as indicated above; and that the General
Services Department shall prepare the contract therefor; and
IT IS FURTHER ORDERED that after the contractor has signed the
contract and returned it, together with bonds as noted above and
any required certificates of insurance or other required documents,
and the Director of General Services has reviewed and found them to
be sufficient, the Director of General Services is authorized to
sign the contract for this board; and
IT IS FURTHER ORDERED that in accordance with the project
specifications and/or upon signature of the contract by the
Director of General Services, any bid bonds posted by the bidders
are to be exonerated and any checks or cash submitted for security
shall be returned; and
IT IS FURTHER ORDERED that the Director of General Services is
authorized to sign any escrow agreements prepared for this project
to permit the substitution of securities for moneys withheld by the
County to ensure performance under the contract, pursuant to
Section 22300 of the Public Contract Code; and
Pursuant to Public Contract Code Section 4114, the Board
DELEGATES its functions under Public Contract Code Section 4107 and
4110 to the Director of General Services or his designee.
I hereby certify that this is a true and correct copy of
an action taken ano entered on the minutes of the
Board of Superv)ap[�orl.the d§I Iltown.
ATTESTED: p� 7 19 0
PHIL BATCHELOR,Clerk of the Board
of Supervisors and Co my Administrator
,taeptriy
Orig. Dept.- General Services Dept. - Architectural Division
cc: General Services Department
Architectural Division
G.S. Accounting
Auditor-Controller
Contractor (Via Arch Div. )
30502B07 . 20A
GB: ls
Page 2 of 2