HomeMy WebLinkAboutMINUTES - 08071990 - 1.6 (2) ,1 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR I I DATE: July 31, 1990 SUBJECT: Approving Avon Bridge Rehabilitation Project, Martinez, Area. i Project No.: 0662-6R4089-90 CP #90-14 I SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION I. 'Recommended Action: APPROVE Project, and DETERMINE that the project is exempt from CEQA requirements as a Class 1 C Categorical Exemption, and DII RECT the Public Works Director to prepare contract plans and specifications for construction. Direct the Director of Community Development to file a Notice of Exemption with the County Clerk. 1 II. Financiallmpact: , I The lestimated project cost is $318,000, funded by Federal HERR funds (86%), and Road Funds (14%). III. Reaslons for Recommendations and Background: The project is needed to replace the deck on the swing portion of the bridge, to repair the approach spans, to clean and paint the superstructure steel, and to replace obsolete railing. The project has been determined to be in compliance with the General Plan and is exempt from CEQA because this project consists of the repair, maintenance, and minor alteration of an existing ,public bridge and mechanical equipment, involving no expansion of use beyond that previously existing (Section 15301 of the CEQA guidelines). I Continued on Attachment: X SIGNATURE: ftz?4?,iz _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER — I SIGNATURE(S): I ACTION OF BOARD ON JUL 3 1 1990 APPROVED AS RECOMMENDED OTHER II I 1 ' II i i i I I VOTE OF SUPERVISORSI'I ✓ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of an action taken and entered on the minutes of the TJ:drg Board of Supervisors on the date shown. c\BO:31.t7 I ATTESTED: _ JUL 3 1 1990 PHIL BATCHELOR,Clerk of the Board Orig. Div: Public Works (Design Division) otSupervisors and Cou tvAdministretor cc: County Administrator , PW Road Engineering Community Development Attn: �,G. Almquist I l Approving Avon Bridge Rehabilitation Project, Martinez, Area. July 31, 1990 Page Two I IV.it Consequences of Negative Action: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. I I .I I I I I I I i i I I I i .I I i I I I 1� 1 I i i I i I I