HomeMy WebLinkAboutMINUTES - 08141990 - 1.4 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: August 14, 1990
SUBJECT: Approve Consulting Services Agreement with Wahler Associates for Geotechnical
Services for the Cypress Road Pedestrian Bridge and Path Project, Oakley Area.
Project No.: 0662-6R4060-90
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE Consulting Services Agreement with Wahler Associates for geotechnical services for
the Cypress Road Pedestrian Bridge and Path project and AUTHORIZE the Public Works
Director to execute the agreement.
II. Financial Impact:
The maximum contract cost, which is not to be exceeded without written approval by the Public
Works Director, is $4,000.00. It is to be funded by the Transportation Development Account
(31%) and Area of Benefit funds (69%).
III. Reasons for Recommendations and Background:
The services of a consultant are needed to determine the bearing capacity of the soil for bridge
abutments. After review of the Statement of Qualifications of several consultants, Wahler
Associates was invited to submit a proposal outlining the scope of work and associated fees for
the project.
IV. Consequences of Negative Action:
If geotechnical services are not secured, a sound engineering design cannot be provided.
Continued on Attachment:_ SIGNATURE: �� s
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON AUG 14 1990 APPROVED AS RECOMMENDED V OTHER
VOTE OF SUPERVISORS
_jel� UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that tills is a crus and correct copy of
HF:drg an action taken and entered on the minutes of the
C\BO:14.tB Board of Supervisors on the date shown.
ATTESTED: AUG 14 1990
Div: Public Works (Design DIVISIOri PHIL BATCHELOR.Clerk of the Board
Orig.
( g ) of Supervisors and Co my Administrator
cc: County Administrator ,
Attn: E. Kuevor of Ve"
Auditor-Controller
PW Accounting
Road Engineering