Loading...
HomeMy WebLinkAboutMINUTES - 07311990 - 1.46 9 =�"!� 250-8817/C. 4 . 3 1-046 TO: BOARD OF SUPERVISORS ` L' Contra z y, f Costa FROM: Barton J. Gilbert, Director of General Services � o., s y' County DATE: July 31, 1990Tq=Cou SUBJECT: APPROVE AND AUTHORIZE EXECUTION OF CHANGE ORDER NO 6 . TO CONTRACT FOR CONSTRUCTION OF FORENSIC SCIENCE FACILITY, 1960 MUIR ROAD, MARTINEZ (WH282B) SPECIFIC REOUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I RECOMMENDATION APPROVE Change Order No. 6 to the contract dated November 28, 1989, for construction of Forensic Science Facility, 1960 Muir Road, Martinez, with Arntz Builders, Novato, and AUTHORIZE the Director of General Services to execute the Change Order, which increases the Contract Price by $63,563 . 00, and provides for ( 1) revisions to the mechanical ductwork and (2) adds a combustion air shaft for boilers located in the mechanical room. II . FINANCIAL IMPACT There are sufficient funds in the plant acquisition account to cover the Change Order. III .REASONS FOR RECOMMENDATIONS/BACKGROUND A. Some of the mechanical ductwork shown on the original working drawings would not fit in the space provided between ceilings and the structure above. This condition occurred on the first floor above Autopsy Room 122 and Office Room 108, and on the second floor above Drug Lab Room 210, Instrument Lab Room 226, Corridor 202 , and Corridor 206 . Drawings were issued by the design consultants revising the size and location of the mechanical ductwork to eliminate this problem. CONTINUED ONMENT: X ATTACH —VES SIGNATURE: —RECOMMENDATION OF COUNTY ADMINISTRATOR —RECOMMENDATION OF BOARD COMMITTEE APPROVE —OTHER SIGNATURE(S)- ACTION IGNATURE S:ACTION OF BOARD ON JULAPPROVED AS RECOMMENDED — OTHER it I SII VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS(ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. General Services Department JUL 3 1 1990 CC: Architectural Division ATTESTED Accounting PHIL BATCHELOR,CLERK OF THE BOARD OF County Administrator' s Office, D. Bell SUPERVISORS AND COUNTY ADMINISTRATOR Auditor-Controller Contractor (Via Architectural Div. ) �J�^ II M382 1��q itect (Via Architectural Div. ) BY 9U ddl ,!�{ ,DEPUTY APPROVE AND AUTHORIZE EXECUTION OF File: 250-8817/C.4 . 3 CHANGE ORDER NO. 6 TO CONTRACT FOR Date: July 18, 1990 CONSTRUCTION OF FORENSIC SCIENCE, 1960 MUIR ROAD, MARTINEZ (WH282B) B.' The Uniform Mechanical Code requires that boiler rooms be provided with ventilation for combustion air, low near the floor and high near the ceiling. The original working drawings show louvers in the exterior wall for the "low" ventilation but do not provide for "high" ventilation. Consequently, a combustion air shaft must be added to provide the required ventilation. i I 25017B07 . 18A GC: ls � I I i Page 2 of 2