Loading...
HomeMy WebLinkAboutMINUTES - 09121989 - 1.64 TO:- BOARD OF SUPERVISORS 1-064 FROM: Phil Batchelor, County Administrator .f Contra DATE: August 29, 1989 Costa Cou�/ SUBJECT: West County Justice Center, Project B "`1 Contract Amendment for Testing Services Specific Request(s) or Recommendations(s) & Background & Justification RECOMMENDATION APPROVE $35,000 for expanded testing services required by the West County Justice Center project and AUTHORIZE the Director, Justice System Programs to amend the County' s contract with Smith-Emery Company. FINANCIAL IMPACT There is no impact beyond that already planned for and .budgeted. The $600,000 budgeted for testing, permits and fees has an unencumbered balance of $57, 000. Testing expenses are eligible for reimbursement from the Board of Corrections. (Proposition 2 grant) . REASONS FOR RECOMMENDATION/BACKGROUND The initial contract with Smith-Emery Company for $87 , 806 was based on a bid scope of work consisting of unit prices for inspection hours and certain types of material tests. The inspection hours and quantities of tests were listed as part of the bidding documents based on a preliminary County estimate. Although anticipated as limited service, some time was included for shop fabrication and roof testing. The scope of work for testing developed before a construction contract was awarded. The original budget for fabrication shop inspection of $3, 000 was based on the assumption that steel would be fabricated in the area therefore: only requiring periodic nearby one day inspections. The low bid steel subcontractor fabricated this work at an out of state location, thus requiring additional inspection, travel and per diem. The inspection for steel cost..-: approximately $34,000, an increase of $31,000 over the budget. The contract for testing services budgeted $1,120 for periodic roof inspection; however, in order to maintain the manufacturer' s bonded warranty, the roof installation will require near full time inspection. Although only a very limited amount of roofing has been installed, the inspection effort will probably cost $4,000 - 5 ,000 , an increase of at least $3 , 000. CONTINUED ON ATTACHMENT: X YES Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other Signature(s) : Action of Board ons SEP 12 1989 Approved as Recommended �_ Other Vote of Supervisors: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested: SEP 12 1989 cc: CAO, Justice System Programs Phil Batchelor, Clerk of County Counsel the Board of Supervisors Sheriff-Coroner and County Administrator Auditor-Controller �" �� "" (Accounts Payable) By: g4c , i.A, DEPUTY GSD (Accounting) \TXT\CONTAMND.BO west uounLy JusLice LenLer, rrojecL is Contract Amendment for Testing Services Board Order _.� .Page 2 The third element of work requiring supplemental funding has been for overtime. The construction contract calls for full time inspection of masonry installation. In order to meet his schedule requirements, the masonry contractor worked most fair weather Saturdays during the time he was installing building perimeter walls. Although inspection time for this work was budgeted, the premium overtime portion was not. This Saturday work has kept the overall project on schedule. \TXT\CONTAMND.BO