TO: BOARD OF SUPERVISORS, as the Governing Body of the
Contra Costa County Flood Control and Water Conservation
District
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: AUGUST 8, 1989
SUBJECT: DRAINAGE AREA 40A - LINE B
Project No. : 7565-6D8451 Task: ACQ Account: 3540
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND
JUSTIFICATION
I. Recommended Action:
A. APPROVE Amendment to Right of Way Contract from Paul
Palizzolo.
B. AUTHORIZE Chief Engineer to execute said Right of Way
Contract on behalf of the District.
C. APPROVE payment of $100 for said property rights and
AUTHORIZE the Auditor-Controller to issue a check in
said amount payable to Paul Palizzolo.
Cont'd on Attachment: X yes Signature:
Recommendation of County Administrator
_ Recommendation of Board Committee
Approve Other
Signature(s)
Action of Board on
Approved as recommended �-%C Other
Vote of Supervisors
Unanimous (Absent ) I HEREBY CERTIFY THAT THIS
Ayes: Noes: IS A TRUE AND CORRECT COPY
Absent: Abstain: OF AN ACTION TAKEN AND
ENTERED ON THE MINUTES OF
THE BOARD OF. SUPERVISORS ON
DATE SHOWN.
ATTESTED AUG 8 1989
PHIL BATCHELOR, Clerk of
the Board of Supervisors
and County A 1n1strator
KM:rs BY 194AMId
BO: 128 .t8 DEPUTY
Orig. Div: Public Works (R/P)
cc: County Administrator
Auditor-Controller (via R/P)
P. W. Accounting
Recorder (via R/P)
9
II. Financial Impact:
Payment of $100 from Drainage Area 40A funds.
III. Reasons for Recommendations and Background:
The installation of the storm drain line required the removal
of two trees which were not valued in the original appraisal.
IV. Consequences of Negative Action:
The project will not have compensated for all the rights to
allow construction in accordance with the approved plans and
specifications.