HomeMy WebLinkAboutMINUTES - 09011987 - 1.53 250-8521/A. 1 TO� BOARD OF SUPERVISORS 1--053 FROM; BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES } ra Costa DATE'. SEPTEMBER 1, 1987 rr'"`'" '•7 APPROVING EXTRA SERVICES TO THE ARCHITECTURAL S S SUBJECT: AGREEMENT FOR REMODELING AND ADDITION AT 50 GLACIER DRIVE, MARTINEZ, FOR OFFICE OF EMERGENCY SERVICES AND SHERIFF'S COMMUNICATIONS (4415-4200; 0928-WH2O0D) SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE and AUTHORIZE the Director of General Services to issue written authorizations 2 through 5 for Extra Services under the Architectural Services Agreement with Group 4/Architecture, for Remodeling and Addition at 50 Glacier Drive, Martinez, for Office of Emergency Services and Sheriff ' s Communications. II. FINANCIAL IMPACT Cost of the Extra Services shall not exceed $9,857. 00. This cost is broken down as follows: Extra Services Authorization No. 2, $6,507; No. 3 , $350; No. 4, $1,500; No. 5, $1, 500. There are sufficient funds in the Plant Acquisition Budget Account for this project to pay for these expenses. III. REASONS FOR RECOMKENDATIONS/BACKGROUND A. Extra Services Authorization No. 2 scope of work is as follows: Prepare Design and Construction Documents that describe a Bid Alternate to delete the buried water storage tank and replace it with an above ground water storage tank of the same capacity. This work was done to reduce the initial construction contract cost. CONTINUED ON ATTACHMENT, _ YES, SIGNATURE: 1&kb44_ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATUREIS): ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERV19012S 1 HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS (ABSENT IT'r AND CORRECT COPY OF AN ACTION TARN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN.. Orig. Dept. - General Serv. Dept. - Arch. Div. cc: Administrator' s Office ATTESTED _ SEP 1 1987 D. Bel 1 PHIL BATCHELOR, CLERK OF THE BOARD OF Architectural Division SUPERVISORS AND COUNTY ADMINISTRATOR G.S. Accounting PurchasingLdr I dito r-Cont roller BY ,DEPUTY M382/7 Group 4/Architecture (Via A. D.) Page 1 of 2 250-8521/A. 1 B. Extra Services Authorization No. 3 scope of work is as follows: Prepare Design and Construction Documents to revise the mechanical platform area over the restrooms in the Communications Building to support two air handling units rather than one. This work was done to accommodate the air handling units required to reduce the heat produced by an uninterruptible power system in the Communications Equipment Room. C. Extra Services Authorization No. 4 scope of work is as follows: Prepare Design and Construction Documents to change the location of mechanical unit HP-81 located on the roof of the Office of Emergency Services Building, from south of column line 8 to north of column line 8 . This work was done to reduce the number of penetrations required in the existing concrete block wall at column line 8, and to simplify the installation of an above-ceiling cable tray. D. Extra Services Authorization No. 5 scope of work is as follows: 1. Prepare Design and Construction Documents to revise framing plans and details of the OES Building from column line 5 to column line 7, between column lines B and D. This is required because previously concealed existing conditions differ from the design assumptions. 2. Prepare Design and Construction Documents to modify the floor joists in rooms 209, 210, 214, and 215 of the OES Building as required to accommodate a mortar set ceramic tile flooring installation. The work done in item 1 is self-explanatory. The work done in item 2 will modify existing conditions so that the mortar setting bed for tile flooring can be recessed to provide a flush, handicapped accessible door threshold. 25021B08.19B GC:pg Page 2 of 2