HomeMy WebLinkAboutMINUTES - 07211987 - T.7 CMPX=M COPY
TO: BOARD OF SUPERVISORS PLEASE DESTROY,
PREVIOUS ISSUE
PRom:. ,, Harvey E. Bragdon _W6- acries
Director of Community Development- -- - Costa
Co-sly
July 14, 1987Co-slySUBJECT: Hearing on Rezoning Application 2697-RZ to rezonof land
located at Camino Andres in the West Pittsburg Area from Single Family
Residential (R-6) to Planned Unit District (P-1) and Development Plan
3051-86 to construct 41 residences and Tentative Map 6854 for a
subdivision filed by Westfall Engineering (Applicants) and Yuan-Ji Su
and Chen Chuin Hsuing (Owners) .
;PECIFIC RRQUEST(S) OR RECOMMSHDATIONS(S) i BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1. Approve Rezoning Application #2697-RZ as recommended by the
East County Regional Planning Commission;
2. Approve Development Plan 3051-86 with conditions as
recommended by the East County Regional Planning Commission;
3. Approve Tentative Subdivision Map 6854 with conditions as
recommended by the East County Regional Planning Commission;
4. Adopt the East county Regional Planning Commission findings as
set forth in Resolution No. 32-1987 as the determinations for
these actions;
5. Introduce ordinance giving effect the aforesaid stoning, waive
reading and set date for the adoption of same.
ONTINUED ON ATTACHMENT: .,_ YES SIGMA
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDAMN OF WfD CONKI
APPROVE OTHER
IGNATURE(S) :
=ION OF BOARD ON July 21 , 1987 APPROVED AS ECOIGU LADED, X, , CSR X
Karl Wandry, Community Development Department, presented the project
description and recommended approval of the project. The Chair opened
the public hearing and no one appearing to speak, the public hearing
was closed. Supervisor Torlakson recommended approval of the project
with the addition of two conditions, one relative to the park
dedication fee and the second relative to the special tax area for
police services. Supervisor Schroder advised that he did not agree
with the condition on the special tax area for police services. IT IS
BY THE BOARD ORDERED that recommendations 1, 4, and 5 are APPROVED as
recommended; and recommendations 2 and 3 are APPROVED with amended
condtions, Exhibit A attached; and Ordinance No. 87-54, giving effect
to the aforesaid rezoning, is INTRODUCED, reading waived, and August
4, , 1987 is set for adoption of same.
`OTB OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN
AYES: 1 ,2 ,5 ,a HOES: 3 ACTION TAKEN AND ENTERED ON THE
ABSENT: none ABSTAIN: none JU.N TPBS OF ME HOARD OF
SUPERVISORS ON THE DATE SHOWN.
Community Development Department ATTESTED July 21 , 1987
West.fa11 Enci.neerinc; PHIL BATCHELOR, CLERK OF
Yuan-Ji Su and Chen Chuin HsuinQ THE BOARD OF SUPERVISORS
Riverview Fire Protection Dist.. COUNTY ADMINISTRATOR
Building Inspection 4)Public Works SY DEPUTY
1C:p1p
. .
^'
CONDITIONS OF APPROVAL FOR DEVELOPMENT PLAN 3051-86
l_ These development plans are approved as shown on plans dated December 19,
1986 as received by the Community Development Department.
2. Prior to the issuance of building permits, a landscape plan shall be
submitted for the review and approval of the Zoning Administrator' ' The
landscape plan shall include:
A. The size, species and location of all open space, common, and patio
areas.
B. Installation of 39 15-gallon size street trees'
C. The landscape plan shall be prepared in conformance with Contra Costa
County Water Conservation policies'
D. Details of the size and location of any fences' A six foot high solid
wood fence shall be erected along the 102' elevation line'
E. A means of ensuring the continued maintenance and care of all common
areas within the subdivision.
3' A color board shall be prepared for review and approval of the Zoning
Administrator indicating the proposed finishes, trims and paints to be used
on the exterior of the buildings'
4' A sign plan shall be submitted to indicate entry signs and individual
street numbers'
5' At least 30 days prior to filing of the final map the applicant shall
submit three possible street names and numbers for review and approval by
the Community Development Graphics Division.
6' An improvement plan indicating size, design, and location of street lights
shall be submitted for review and approval of the Zoning Administrator'
7. Comply with road and drainage considerations:
See Subdivision 6854 for comments'
- -
EMU � "
'
CONDITIONS OF APPROVAL FOR SUBDIVISION 6854 AS AMENDED
1. This subdivision Tentative Map is approved as shown on the revised
Tentative Map dated as received by the Community Development Department on
December 29, 1986.
2. This subdivision is approved contingent upon approval of the rezoning
request from R-6 to P-1.
3. Prior to recording the final map or issuance of Building Inspection
Department permits, submit a preliminary geotechnical report for review and
approval of the Community Development Department. Allow 45 days for
review.
4. The applicant shall submit landscape plans as required in Development Plan
3051-86 for the review and approval of the Zoning Administrator. These
plans shall conform to Contra Costa County Water Conservation policies.
5. The applicant shall pay the amount of the newly established park dedication
fee. In addition, the applicant shall submit a revised site plan
indicating a play area for use by small children. These plans and the play
area proposal shall be subject to the review and approval of the Zoning
Administrator.
6. All utilities shall be placed underground.
7. Comply with drainage, road improvement, traffic and utility requirements as
follows:
A. In accordance with Section ,92-2.006 of the County Ordinance Code, this
subdivision shall conform to the provisions of the County Subdivision
Ordinance (Title 9) . Any exceptions therefrom must be specifically
listed in this conditional approval statement.
B. Construct curb, 6-foot 6-inch sidewalk (width measured from curb
face) , necessary longitudinal and transverse drainage, and necessary
pavement. widening on the Anchor Drive extension. The faces of curbs
shall be located 20 feet from the road center line.
C. Install street lights on the Anchor Drive extension. The final number
and location of the lights shall be determined by the County Traffic
Engineer.
D. Convey to the County, by Offer of Dedication, 60 feet of right of way
along the Anchor Drive extension as required for the planned future
width of 60 feet. The Offer of Dedication shall include 20-foot radii
right of way returns at Camino Andres.
E. The applicant shall construct and emergency vehicle barricade at the
end of Anchor Drive on the south property line.
RED N A
2.
F. Convey to the County, by Offer of Dedication, 8 feet of additional
right of way on Camino Andres east of Anchor Drive as required for the
planned future width of 56 feet.
G. Convey to the County, by Offer of Dedication, 10 feet of additional
right of way on Camino Andres west of Anchor Drive as required for the
planned future width of 60 feet:
H. Relinquish abutter's rights of access along all curb returns within
the subdivision.
I. Construct the on-site driveway system to current County private road
standards.
J. Comply with the requirements of the Bridge/Thoroughfare Fee Ordinance
for West Pittsburg Area of Benefit as adopted by the Board of
Supervisors.
K. Comply with the requirements of the Bridge/Thoroughfare Fee Ordinance
for East/Central County Travel Corridor Area of Benefit as adopted by
the Board of Supervisors.
L. Complete the cul-de-sac at the end of Camino Andres by constructing
the following improvements:
1. Necessary pavement widening and reconstruction.
2. Curb, 6-foot 6-inch sidewalk, and conform paving.
3. Necessary longitudinal and transverse drainage.
4. A 10-foot wide bicycle/pedestrian path located close to the
northerly line of the existing road with a curved alignment near
Port Chicago Highway to discourage direct high-speed
bicycle/pedestrian access to Port Chicago Highway.
5. Curb and sidewalk along the existing Camino Andres entrance to
Port Chicago Highway. The sidewalk width shall conform to the
width to the north and south.
6. A 20-foot driveway access to the EBMUD right of way at the
closest point of contact to the Camino Andres cul-de-sac.
M. The existing Camino Andres pavement shall be obliterated between the
cul-de-sac and Port Chicago Highway, except for the 10-foot wide
bicycle/pedestrian path.
N. Submit a detailed conceptual plan to the Public Works Department, Road
Engineering Division, prior to beginning work on the improvement
plans, for their review and approval . The plan shall show the
r
. .
. �
3'
improvements required to cul-de-sac Camino Andras and construct the
bicycle/pedestrian path'
U. Prevent storm drainage, originating on the property and conveyed in a
concentrated manner, from draining across the sidewalks and driveways'
P. Furnish proof to the Public Arks Department, Engineering Services
Division, of the acquisition of all necessary rights of entry, permits
and/or easements for the construction of off-site, temporary or
permanent, road and drainage improvements.
Q. Comply with the drainage fee requirements for Drainage Area 408 as
adopted by the Board of Supervisors.
R. Convey to the County of Contra Costa, by Grant Deed, the future
"development rights» over the natural watercourses traversing the
property. The area for which the "development rights" are to be
deeded shall be determined by using the criteria outlined in Chapter
814-I0, "Easements", of the Subdivision Ordinance.
S. Comply with the requirements of the Federal Emergency Management
Agency (FEMA) Flood Insurance Program as if this property were
presently located within a flood hazard area.
T. The applicant shall apply to the Federal Emergency Management Agency
to amend, revise, or appeal their requirements to avoid the need for
flood insurance for the proposed dwelling units. The applicant shall
submit the necessary information and pay all fees required'
U. The siting of unit number 39 and any other unit which may encroach
into the creek structure setback area shall he subject to Zoning
Administrator review and approval of additional substantiating
information from a registered soils engineer, including:
l. Adequacy of building foundations'
2' Creek bank stability and compliance with Section 94-4.420 of the
Ordinance Code'
3' Adequate erosion protection'
V. Prior to issuance of building permits, file the Final Map for
Subdivision 6854'
8' On the provision of police service, the applicant agrees to Vote their
property into a special tau area for police service at an initial level of
$lUO per parcel annually. This amount shall be adjusted yearly according
to the Bay Area CPI . Furthermore, the Board of Supervisors shall review
the assessment amount and adjust it to a higher level as conditions warrant
it.
/
KK/in
3/3/B7
3/4/87
6/15/87 EMU
7/2l/87