Loading...
HomeMy WebLinkAboutMINUTES - 08191986 - X.12 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on August 19, 1986 by the following vote: AYES: Supervisors Fanden, Schroder, McPeak, .Torlakson Powers NOES: None ABSENT: None ABSTAIN: None SUBJECT: In the Matter of Award of Contract fo.r. the Alhambra Creek Bank Repair near Alhambra Avenue and Linden Lane, Project No. 7505-6F8001-86 , Martinez Area. Bidder Total Amount Bond Amounts Winton Jones Contractor $168,484.55 Payment Bond $ 84,242.28 1949 Arnold Industrial Faith. Perf. $168,484.55 Concord, CA 94520 Hess Construction The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Chief Engineer; and The Chief Engineer recommending that the bid listed first above is the lowest responsible bid and this' Board , as the governing body of the Contra Costa County Flood Control and Water Conservation District, concurring and so finding; IT IS BY THE BOARD ORDERED , that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Flood Control District shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required documents , and the Chief Engineer has reviewed and found them to be sufficient, the Chief Engineer is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specifications = and/or upon signature of the contract by the Chief Engineer, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. 0B:s j I hereby certify ttiatthis Is a true and correct copyot bo:19.t 8 an action taken and entered on the minutes of tt� Hoard of Supervisors on the date shown. Ori g. Dept. Public Works Department (FCE) ATTESTED: Mr. cc: County Administrator PHIL BATCHELOR Clemk f the Board Auditor/Controller of Supervisors and County Administrator Chief Engineer Design/Construction �p , Accounting By 424 Deputy Contractor....